Loading...
HomeMy WebLinkAboutResolution 2019-74 Approving Savoie Minor SubdivisionCity of Corcoran County of Hennepin State of Minnesota RESOLUTION NO. 2019-74 Motion By: DejIce wksi Seconded By: Bottema October 24, 2019 A RESOLUTION TO APPROVE A MINOR SUBDIVISION LOCATE AT 21801 HOMESTEAD TRAIL (PID 28A 19-23=43-0007) (CITY FILE 19-021) WHEREAS, Terry Savoie has requested approval of a minor subdivision to create one 2.5-acre lot and one 13.91-acre lot on the property legally described as: See Attachment A NOW, THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF CORCORAN, MINNESOTA, that it should and hereby does approve the request for a lot line adjustment, subject to the following findings and conditions: 1. A minor subdivision is approved in accordance with fihe plans received by fihe City on September 18, 2019, except as amended by this resolufiion. 2. There are two development rights on the property. The two development rights will be exhausted with the subdivision and there will be no remaining development rights. 3. A building permit is required prior to construction of the proposed home on Parcel A. 4. The applicant shall comply with all conditions in the City Engineer' October , 72019. 5. Prior to the release of the resolutions for recording: a. Revise the plans to show: s memo dated i. The boundaries of the wetland on Parcel B as well as the full boundaries of the wetlands on Parcel A and B; ii. The boundary of the 100-year floodplain; Wetland buffers, buffer setbacks and location consistent with Section 1050.010 of the Zonin iv. A five-foot setback from th e buffer around Wetland driveway location for Parcel A; finance; 1 on the proposed v. The draintile indicated on the wetland delineation; vi. The applicant shall provide staff with information about la nd management in the wetland buffer areas and work with staff determine areas tha t shall be re -vegetated or be preserved in accordance with Section 1050.01um; Page 1 of 3 City of Corcoran County of Hennepin State of Minnesota RESOLUTION NO. 2019-74 October 24, 2019 b. A drainage and utility easement must be provided over the floodplain. The certificate of survey shall be revised to show the easement. c. A drainage and utility easement must be provided over the wetlands and wetland buffers. d. A 40-foot half right-of-way easement shall be dedicated along Willow Road. The plans shall be revised to show the easement. e. The applicant shall submit easement documents suitable for recording for review and approval by the City. f. Park dedication is due as cash -in -lieu for land for the one new lot. Any future subdivision would be subject to the park dedication requirements at that time. 6. Prior to issuance of building permits, the applicant must: a. Record Certificate of Survey, street easement and drainage and utility easement documents at Hennepin County and provide proof of recording to the City. b. The applicant shall provide the approved Certificate of Survey drawings to the City in an electronic (AutoCAD) format. 7. Prior to release of any remaining escrow, the applicant must: a. �.ot monuments shall be installed as required by the Subdivision Ordinance. VOTING AYE ® Thomas, Ron ® Bottema, Jon ® Dejewski, Brian ❑ Keefe, Mike ❑ Schultz, Alan VOTING NAY ❑ Thomas, Ron ❑ Bottema, Jon D ❑ ejewski, Brian K ❑ eefe, Mike ❑ Schultz, Alan Whereupon, said Resolution is hereby declared adopted on this 24t" day of October 2019. Ron Thomas -Mayor ATTEST: City Seal J sica Beise —Administrative Services Director Page 2 of 3 City of Corcoran County of Hennepin State of Minnesota RESOLUTION NO. 2019-74 Attachment A October 24, 2019 The West 2 %J the Northeast %4 of the Southwest %4 of the Southeast %4 of Section 28, Township 119 North, Range 23 West., The South �/2 of the North �/2 of the East %4 of the Southwest %4 of the Southeast %4 of Section 28, Township 119 North, Range 23 West. The Easfi /2 of the West �/2 of the Southwest %4 of the Southeast Range 23 West. Page 3 of 3 %4 of Section 28, Township 119 North,