HomeMy WebLinkAboutResolution 2019-31 Approving Bellwether 2nd Addition Final PUD PlanCity of Corcoran
County of Hennepin
State of Minnesota
RESOLUTION NO. 2019 -31
Motion By: Keefe
Seconded By: Bottema
April 25, 2019
APPROVING FINAL PLANNED UNIT DEVELOPMENT (PUD) PLAN FOR "BELLWETHER
2nd ADDITION" (FORMERLY ENCORE) FOR PULTE HOMES OF MINNESOTA LLC (PID 01-
119 -23 -41 -0001, 01- 119 -23 -43 -0002 and 01- 119 -23 -44 -0001) (CITY FILE 19 -001)
WHEREAS, Pulte Homes of Minnesota LLC ( "the applicant ") has requested approval of a final
PUD (planned unit development) plan for "Bellwether 2nd Addition" for 79 new residential lots,
two existing residential lots and 12 outlots in the second phase of a multi -phase residential
development on 135.39 acres of property legally described as:
The South Two - thirds of the Southeast Quarter except road, Section One, Township One
Hundred Nineteen, Range Twenty - three, Town of Corcoran, Hennepin County,
Minnesota.
The south 292.70 feet of the west 595.12 feet of the north 113 of the East 112 of the
Southeast Quarter, Section 1, Township 119, Range 23, Hennepin County, Minnesota.
WHEREAS, the Planning Commission has reviewed the plan at a public meeting and
recommends approval, and;
NOW, THEREFORE, BE IT RESOLVED that it should and hereby does approve the request
for a final PUD development plan, subject to the following conditions:
1. A final PUD plan is approved to allow the creation of 79 lots for new single family homes,
two lots for existing single family homes and 12 outlots in accordance with the
application materials and plans received by the City on February 1, 2019 and revisions
received on February 15, 2019 and March 21, 2019 except as amended by this
resolution.
a. Home construction and street construction shall only be permitted on platted lots.
b. Grading and utility work may be allowed on outlots as permitted by the City
Engineer. However, home and street construction shall not be permitted in these
areas until they are platted as lots in a future plat.
2. Approval is contingent upon City Council approval of the final plat, wetland delineation
waiver and development contract.
3. The development shall be subject to all conditions of the "Encore" (now Bellwether)
preliminary PUD development plan approval and all amendments.
4. The development is subject to Elm Creek Watershed Management Commission review
and approval.
5. The application shall comply with all conditions in the City Engineer's memo dated
March 27, 2019.
Page 1 of 3
City of Corcoran April 25, 2019
County of Hennepin
State of Minnesota
RESOLUTION NO. 2019-31
6. Park dedication is based on the development of the entire Bellwether site approved
under the preliminary PUD and shall be the equivalent of 21.98 acres. No park
dedication is provided in this phase.
7. All permanent wetland buffer monument signs must be erected along the wetland buffer
line as required by Section 1050.010, Subd. 7 of the Zoning Ordinance.
a. Additional wetland buffer signs are required on Wetland #16, #17, #19 and #20. The
revised plan must be submitted for City review and approval.
b. Wetland signs shall be purchased from the City.
c. The final locations must be inspected and approved by City staff.
d. Monuments and signs shall be installed prior to approval of the building permit.
8. Revise trail plans to reflect the following staff recommendations:
a. The trail shown on the north side of 102nd Place should be moved to the South
Side of 102nd Place, reflecting condition 49(H) of Resolution 2018-48.
b. The trail south of Stieg Road should be indicated as a proposed trail with this
phase of development, as the City will include this trail as part of the construction
of the realigned Stieg Road.
c. The regional trail connection should be shown on the east side of wetland #16. A
new on-road trail segment on the north side of Stieg should be shown on the
plans to connect to the regional trail east of wetland #16.
9. The development shall comply with the City's requirements regarding fire access, fire
protection and fire flow calculations, the location of fire hydrants, fire department
connections and-fire lane signage.
10. Final copies of the amended Declaration of Covenants and Homeowners Association
Documents shall be submitted for review and approval.
11. Details of the driveways, house pads and setbacks as required in Condition 17 of
Resolution 2018-48 shall be submitted for staff review and approval.
12. The original approvals granted a 16 square foot development sign at the Stieg Road
entrance. The civil and landscape plans must be revised to show the location of this
sign. Final sign detail must be submitted for City review and approval.
13. A final landscaping plan with all species of shrubs, trees, and plant materials shall be
submitted for staff review and approval. The revised plans shall:
a. Be revised to either move all trees outside of the right-of-way or trees shall be
allowed in the 80-foot or 60-foot rights-of-way but shall not be permitted in the
50-foot right-of-way.
14. Plans shall be revised as follows:
a. Show minimum 22-foot driveways in all lots.
b. The temporary turnaround at the intersection of 102nd Place and 103rd Avenue
should be revised to reflect City engineering standards for Private Development
Turnarounds.
Page 2 of 3
City of Corcoran April 25, 2019
County of Hennepin
State of Minnesota
RESOLUTION NO. 2019 -31
c. Wetland Buffer Monument signs shall be revised to provide additional
monuments at lot lines and where changes in contours occurs.
15. Lighting should comply with the lighting requirements of Section 1060.040 of the Zoning
Ordinance and generally be located on the sidewalk side of the street.
a. The applicant should work with staff to finalize street light locations.
16. The plans show centralized mailbox locations. These mailbox locations shall be
approved by the US Postal Service and proof of the approved locations shall be
provided to the City, prior to issuance of building permits.
17. Drainage and utility easements must be provided over all wetlands, wetland buffers and
ponds.
18. The following documents must be approved by the City Attorney and recorded at
Hennepin County:
a. Stormwater Maintenance Agreement
b. Temporary Turnaround Easement
c. Temporary Cul -de -sac easement
d. Maintenance and Encroachment agreements for landscaping in the public right -
of -way.
19. The development contract must be executed by the developer and the City and must be
filed with the final plat.
20. The applicant shall provide proof of recording the final plat and related documents at
Hennepin County.
21. The applicant shall provide the approved preliminary and final plan drawings to the City
in an electronic (AutoCAD) format.
VOTING AYE
® Thomas, Ron
® Bottema, Jon
® Dejewski, Brian
® Keefe, Mike
® Schultz, Alan
VOTING NAY
F-1 Thomas, Ron
❑ Bottema, Jon
❑ Dejewski, Brian
F-1 Keefe, Mike
❑ Schultz, Alan
Whereupon, said Resolution is hereby declared adopted on this 25th day of April 2019.
Ron Thomas -Mayor
ATTEST:
City Seal
J sica Beise — Administrative Services Director
Page 3 of 3