Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
2019-05-02 Planning Commission Agenda Packet
CITY OF CORCORAN *Includes Materials - Materials relating to these agenda items can be found in the House Agenda Packet by Door. Corcoran Planning Commission Agenda May 2 , 2019 - 7:00 pm 1. Call to Order / Roll Call 2. Pledge of Allegiance 3. Agenda Approval 4. Open Forum 5. Minutes a. Minutes – April 4, 2019* 6. New Business a. Ravinia 11th PUD Amendment Final Plat and PUD Amendment for U.S. Home Corporation (dba Lennar) for (City File 19-005)* i. Staff Report ii. Commission Discussion & Recommendation 7. Reports/Information a. Planning Project Update* b. Consider changing July 4th meeting to July 9th or July 10th c. City Council Report* – Council Liaison Schultz d. Other Business 8. Commissioner Liaison Calendar City Council Meetings 5/9 5/23 6/13 6/27 7/11 7/25 8/8 Shoulak Jacobs Dickman Thies Wu Dickman Jacobs 9. Adjournment CITY OF CORCORAN Corcoran Planning Commission Minutes April 4, 2019 - 7:00 pm The Corcoran Planning Commission met on April 4, 2019 at City Hall in Corcoran, Minnesota. Present were: Chair Dean Jacobs, Commissioner Wu, Commissioner Theis, Commissioner Dickman, and Commissioner Shoulak. Also present were: City Administrator Martens, Planner Lindahl, Planner Shay, and Code Compliance Official Pritchard. 1.Call to Order / Roll Call Chair Jacobs called the meeting to order at 7:01pm. 2.Pledge of Allegiance 3.Agenda Approval Motion made by Wu seconded by Theis to approve the agenda as presented. Voting Aye: Jacobs, Wu, Theis, Dickman, and Shoulak. (Motion carried 5:0) 4.Open Forum – None 5.Minutes a.Minutes – February 7, 2019 b.Minutes – March 7, 2019 Motion made by Theis seconded by Dickman to approve both the February and March minutes as presented. Voting Aye: Jacobs, Wu, Theis, Dickman, and Shoulak. (Motion carried 5:0) 6.New Business a.Bellwether 2nd Final PUD Development Plan (PID 01-119-23-41-001, 01-119-23-43-0002 and 01-119-23-44-0001) (City File 19-001) i.Staff Report – Planner Lindahl presented her staff report. ii.Commission Discussion & Recommendation – The Commission discussed the wetland delineation waiver for the portion of property not being developed as well as Stieg Road construction/closure timing, landscaping and trees, and HOA responsibilities for maintenance. Motion made by Dickman seconded by Theis to recommend approval of the resolution with a revision to condition 19d. to remove incorrect language. Voting Aye: Jacobs, Wu, Theis, Dickman, and Shoulak. (Motion carried 5:0) b.Ravinia 12th PUD Amendment Final Plat and PUD Amendment for U.S. Home Corporation (dba Lennar) for (City File 19-002) i.Staff Report – Planner Shay presented his staff report. ii.Commission Discussion & Recommendation – The Commission discussed the architecture of the Discovery series plans regarding the “garage forward” design as well as the smaller lots/homes. The Commission asked Lennar’s representative, Paul Tabone, the reason for offering the smaller homes. Mr. Tabone stated that the market has changed over the 6 years since the preliminary PUD was approved and that the more affordable homes were more in demand. He also stated that due to the ponding requirements and other factors, the lots had to be adjusted; however, the actual net gain with the smaller lots was one lot. The Commission discussed what would be appropriate to be allowed for the Discovery series (garage-forward design), but could not come to a consensus on the allowable protrusion dimensions. 5a. Motion made by Wu seconded by Theis to recommend approval of the resolution as presented. Voting Aye: Wu and Theis. Voting Nay: Jacobs, Dickman, and Shoulak. (Motion defeated 2:3) Motion made by Wu seconded by Theis to recommend approval of the resolution as presented. Voting Aye: Wu, Theis, and Shoulak. Voting Nay: Jacobs and Dickman. (Motion carried 3:2) c. Public Hearing. SE District Guidelines Update (18-012) i. Staff Report – Planner Lindahl presented her staff report. ii. Open Public Hearing – Chair Jacobs opened the public hearing. iii. Close Hearing Motion made by Theis seconded by Dickman to close the public hearing. Voting Aye: Jacobs, Wu, Theis, Dickman, and Shoulak. (Motion carried 5:0) iv. Commission Discussion & Recommendation – The Commission had a very brief discussion on County Road realignment. Motion made by Dickman seconded by Wu to recommend approval of the resolution as presented. Voting Aye: Jacobs, Wu, Theis, Dickman, and Shoulak. (Motion carried 5:0) d. Public Hearing. City initiated Development Rights Program and Open Space & Preservation Ordinance Amendment (City File 18-014) i. Staff Report – Planner Lindahl presented her staff report. ii. Open Public Hearing – Chair Jacobs opened the public hearing. iii. Close Hearing Motion made by Theis seconded by Wu to close the public hearing. Voting Aye: Jacobs, Wu, Theis, Dickman, and Shoulak. (Motion carried 5:0) iv. Commission Discussion & Recommendation – The Commission discussed tree preservation as it is tied to high quality areas as well as how high quality areas are or were established. Staff clarified the calculation and formula for development rights and clarified the changes to community well and septic “bonuses,” etc. The Commission asked if there is a process to add development right. Staff explained the appeal process but that no process exists to just add or purchase additional rights. The Commission discussed what the open space could be used for as well as design requirements for lot size, streets, layout, etc., but that there were no extra architectural design requirements outside of the existing ordinances. Staff clarified that “ghost-platting” the open space is to show proof that the open space could be developed in the future. Motion made by Dickman seconded by Wu to recommend approval of the resolution with edits to pages 14 and 15 regarding community well and septic as discussed. Voting Aye: Jacobs, Wu, Dickman, and Shoulak. Theis abstained. (Motion carried 4:0) 7. Reports/Information a. Planning Project Update – Information only. b. City Council Report – Administrator Martens updated the Commission on Council activities. c. Review of 2018 Accomplishments and Set 2019 Goals – Information only. d. Other Business – None 8. Commissioner Liaison Calendar City Council Meetings 4/11 4/25 5/9 5/23 6/13 6/27 7/11 Theis Jacobs Shoulak Jacobs Dickman Thies Wu 9. Adjournment Motion made by Schultz seconded by Dickman to adjourn. Voting Aye: Jacobs, Wu, Theis, Dickman, and Shoulak. (Motion carried 5:0) Meeting adjourned at 9:41pm. Submitted by Mike Pritchard, Code Compliance Official 105 South Fifth Avenue Suite 513 Minneapolis, MN 55401 Tel: 612-252-9070 Fax: 612-252-9077 www.landform.net Landform®, SensiblyGreen® and Site to Finish® are registered service marks of Landform Professional Services, LLC. TO: Corcoran Planning Commission FROM: Kevin Shay through Kendra Lindahl, Landform DATE: April 24, 2019 for the May 2, 2019 Planning Commission Meeting RE: Final PUD Development Plan and Final Plat for U.S. Home Corporation (dba Lennar) for Ravinia 11th Addition (City File 19-005) 60-Day Review Deadline: May 31, 2019 1. Application Request Lennar submitted a request for approval of a final plat and final PUD development plan “Ravinia 11th Addition” to allow 14 single-family detached home lots and four outlots. This is modified from the 15- lot subdivision that the City reviewed in February. The proposal showing 15 lots encroached on the access easement that was originally created to allow access to the Schnell property at 19210 Hackamore Road. The access easement is unimproved as the Schnell property has a driveway from Hackamore Road. No agreement could be obtained between the properties to vacate the easement and the loss of a lot with this plan is to keep the access easement free of improvements. Only the final PUD development plan is reviewed by the Planning Commission. The Planning Commission recommendation will be forwarded to the City Council. The City Council is expected to take action on the final PUD development plan and final plat on May 23rd. 2. Context Level of City Discretion in Decision-Making The City’s discretion in approving a final PUD development plan is limited to whether the proposed plan is in substantial conformance with the approved preliminary PUD development plan. If it meets these standards, the City must approve the final PUD development plan. The City’s discretion in approving a final plat is limited to whether the proposed plat meets the standards outlined in the City’s subdivision and zoning ordinance and the conditions of preliminary plat approval. If it meets these standards, the City must approve the final plat. Background The City Council approved the Ravinia rezoning to PUD (Planned Unit Development), Preliminary PUD Development Plan and Preliminary Plat on December 23, 2013. Agenda Item: 6.a. Lennar Final PUD Development Plan – Ravinia 11th Addition (19-005) 2 May 2, 2019 The Final PUD Development Plan and Final Plat for Phase I was approved by City Council on April 24, 2014. There have been ten phases of Ravinia granted final approval and several PUD amendments since the 2014 approval. The homeowners submitted a sketch plan for this property in November of 2016, which received Council feedback and general support. The Planning Commission and City Council reviewed the Lennar request for Preliminary Plat, Rezoning to PUD and Preliminary PUD Development Plan at their meetings on February 7, 2019 and February 28, 2019. 3. Analysis of Request Staff has reviewed the application for consistency with the approved preliminary plans, as well as City policies. The City Engineer’s comments are incorporated into this staff report and resolution and the detailed comments are included in the attached engineering memo dated April 19, 2019. Staff has included a condition that the applicant must comply with the memo. Final PUD Development Plan Architecture The applicant submitted a series of house plans and color palettes for the project with the preliminary PUD development plan. Both the 55- and 65-foot wide lots with the 2-car and 3-car Discovery home products are proposed to be built in this phase. The City will review each house plan to ensure that the homes are compatible with the standards in the original approvals for both design and materials. As part of the original Ravinia submittal, Lennar asked for flexibility to allow the face of the garage to exceed the 55% limit for the building face. Lennar indicated in their narrative that to offset the larger garage, the garage would remain flush with the home. Staff believes this was an important component of the PUD by providing this higher quality architecture. While reviewing the 12th Addition, staff and Planning Commission recommended that the home models be limited to those where the garage is located at or behind the front elevation of the home. The Council will review this item at their April 25th meeting and is expected to take action. Staff recommends that those conditions for homes in the 12th Addition related to garage protrusion apply to the 11th Addition as well. Staff will provide an update on the Council action related to the 3-car Discovery units at the Planning Commission meeting. Streets These streets have a 50-foot right-of-way and will be required to be stubbed to the south property line so that they can be extended to the adjacent properties in the future. This is consistent with City Engineering standards for residential streets. Parking will be allowed on one side of these local Lennar Final PUD Development Plan – Ravinia 11th Addition (19-005) 3 May 2, 2019 streets. Larkspur Lane (the western street) will have a temporary cul-de-sac for public safety and public works turnarounds, with Road 2 utilizing a temporary turnaround. The lot/outlot with turnarounds are unbuildable, as the buildable area is used for these turnarounds. The temporary turnarounds will be removed if the easement is vacated, the property to the south is developed and the streets are extended. At that time Lot 1, Block 3 would be buildable and Outlot C will remain unbuildable. This is consistent with the preliminary approvals. Street Lights The applicant has not submitted street lighting details. Staff recommends that the street lighting approved for previous Ravinia phases be provided in this development. This is consistent with Section 945.020, Subd. 17, which requires ornamental poles. A uniform style of light fixture should be used throughout the site and the applicant will be required to indicate which style will be used in their final development plan application. Driveway Locations Driveway locations are not indicated on the plans submitted. As a condition of approval, the City requests revised plans that demonstrate the location of all proposed driveways for this phase of development. Staff will review the driveway location to ensure that there are no conflicts with planned infrastructure and landscaping. Staff will also review the plans to ensure that there is a minimum of 22 feet between the garage and the right-of-way. Sidewalks and Trails The plans show sidewalks on one side of the street as required. The Comprehensive Plan shows an on-road trail on County Road 101. This trail will be built when County Road 101 is improved, but the applicant must show how the trail can be accommodated, prior to release of the final plat. Hennepin County has requested an additional 5-foot trail easement to be dedicated on the west side of County Road 101. This is consistent with the previous phases of Ravinia. Setbacks The previous phases have approved the following dimensional requirements for the 55- and 65-foot wide lots: 55-foot lots 65-foot lots Front, From County Road 101* 100 feet 100 feet Front, From all other streets 20 feet 20 feet Front Porch (≤ 120 square feet) 15 feet 15 feet Side 5 feet 5 feet Rear 25 feet 25 feet Maximum Principal Building Height 35 feet 35 feet Lennar Final PUD Development Plan – Ravinia 11th Addition (19-005) 4 May 2, 2019 Landscaping The applicant’s plans show 42 trees where 14 are required for the residential lots. Half of the trees are planted at the edge of the front drainage and utility easement and are evenly spaced along the residential street to create an attractive streetscape with a mix of Princeton Elm and Autumn Blaze Maple. The remaining 21 trees are planted in the rear yard of Lots 5 and 6 adjacent to County Road 101 to provide screening from the county road. The screening contains a mix of Prairie Rose Crab, Colorado Green Spruce and White Pine. As a condition for approval, no certificate of occupancy will be issued for home that does not have street trees planted as shown on the landscape plan submitted to the city. Mail Delivery One centralized mailbox location should be shown on the landscape plans. The location of mailboxes must be approved by the US Postal Service. The applicant will need to provide proof of the approved location to the City. Park Dedication A cash in lieu of land fee has been calculated based on the per capita share of park system costs at $3,970 per single family unit (14 x $3,970 = $55,580 based on the current fee schedule). Final Plat The applicant is requesting approval of a final plat to create 14 lots and four outlots. The final plat will need to be revised to plat the right of way to the edge of the plat, along with extending some lots to contain the Tabor driveway easement. • The final plat is reviewed only by the City Council. The development contract will also be reviewed by the City Council. The Planning Commission will not provide a recommendation on the Final Plat. If this subdivision is approved, it would bring the total number of platted lots to 361 of 480 approved: • Phase 1 = 38 Units • Phase 2 = 36 units • Phase 3 = 27 units • Phase 4 = 44 units • Phase 5 = 47 units • Phase 6 = 23 units • Phase 7 = 37 units • Phase 8 = 20 units* • Phase 9 = 49 units • Phase 10 = 26 units • Phase 11 = 14 units** Total Units = 361 units (75% of the approved lots) Lennar Final PUD Development Plan – Ravinia 11th Addition (19-005) 5 May 2, 2019 *The Ravinia 8th Addition added land and units to the Ravinia project and the total increased from 446 to 466 units and 268.07 gross acres to 274.07 gross acres. **The Ravinia 11th Addition added land and units to the Ravinia project and the total increased from 466 to 480 units and 274.07 gross acres to 279.68 gross acres. Conclusion Staff has reviewed the plan for consistency with the applicable standards outlined in the preliminary approvals, Zoning Ordinance and Subdivision Ordinance. 4. Recommendation Move to recommend approval of the resolution approving the Final PUD Development Plan. Attachments a. Draft Resolution approving the final PUD development plan b. Location Map c. Engineer’s Memo dated April 19, 2019 d. Elm Creek Watershed Management Commission Memo dated April 25, 2019 e. Site Graphics dated March 19, 2019 f. Final Plat dated March 19, 2019 g. Phasing Plan dated March 19, 2019 City of Corcoran May xx, 2019 County of Hennepin State of Minnesota RESOLUTION NO. 2019-xx Page 1 of 3 Motion By: Seconded By: APPROVING FINAL PLANNED UNIT DEVELOPMENT (PUD) PLAN FOR “RAVINIA 11TH ADDITION” FOR THE LENNAR CORPORATION (PID 36-119-23-44-0012) (CITY FILE 19-005) WHEREAS, The Lennar Corporation (“the applicant”) has requested approval of a final PUD plan for 14 single family homes and four outlots on property legally described as: The East 780 feet of the part of the Southeasterly ¼ of the Southeasterly ¼ of Section 36, Township 119, North Range 23 West of the 5th Principal Meridian, lying Northerly of the South 1,010.00 feet, Hennepin County Minnesota. WHEREAS, the Planning Commission has reviewed the plan at a public meeting and recommends approval, and; NOW, THEREFORE, BE IT HEREBY RESOLVED BY THE CITY COUNCIL OF THE CITY OF CORCORAN, MINNESOTA, that it should and hereby does approve the request for a final PUD development plan, subject to the following conditions: 1. A final PUD plan is approved to allow the creation of 14 single family lots for Ravinia 11th Addition on 5.59 acres, in accordance with the application materials and plans received by the City on March 19, 2019, except as amended by this resolution; 2. Approval is contingent upon City Council approval of the final plat and development contract. 3. The development contract must be executed by the developer and the City and must be filed with the final plat. 4. The development shall be subject to all conditions of the “Ravinia 11th Addition” preliminary PUD development plan approval (Resolution 2019-09). 5. The approval is subject to the review and approval by the Elm Creek Watershed Management Commission. The applicant shall comply with any conditions of approval from the watershed. Where the standards of the City and Watershed conflict, the more restrictive standard shall apply. 6. The application shall comply with all conditions in the City Engineer’s memo dated April 19, 2019. 7. The plans must be revised to eliminate Outlot D. The street right-of-way should be extended for both streets and the lot lines for Lot 1, Block 3 and Lots 2 and 3, Block 2 should be extended to the south lot line. Outlot C should also be revised to extend to the south lot line. City of Corcoran May xx, 2019 County of Hennepin State of Minnesota RESOLUTION NO. 2019-xx Page 2 of 3 8. The HOA documents must note that the 15-foot wide driveway easement exists along the south lot line and no encroachments are permitted. 9. The PUD is hereby approved to allow 55- and 65-foot wide lots in this plat. All platted residential lots shall comply with the following: 55-foot lots 65-foot lots Minimum Lot Area 7,776 square feet Front, From County Road 101 100 feet 100 feet Front, From all other streets 20 feet 20 feet Front Porch (≤ 120 square feet) 15 feet 15 feet Side 5 feet 5 feet Rear 25 feet 25 feet Maximum Principal Building Height 35 feet 35 feet 10. All garages must have a minimum 22-foot parking area in front of the garage that does not overlap into sidewalks, drives or streets. Plans should be revised to indicate all driveway locations to ensure compliance. 11. A temporary cul-de-sac easement shall be submitted for the temporary cul-de-sac on the south end of Larkspur Lane for review and approval by the City. 12. The applicant shall submit revised plans showing how the planned on-road trail on County Road 101 can be accommodated. 13. Hennepin County requires an additional 5-foot trail easement to be dedicated on the west side of County Road 101. This easement must be submitted in a recordable form. 14. The plans must show centralized mailbox locations. These mailbox locations shall be approved by the US Postal Service and proof of the approved locations shall be provided to the City, prior to issuance of building permits. 15. The project is subject to the PUD standards, which were amended to allow flexibility in building materials and were granted PUD flexibility to allow the face of the garage to exceed 55% of the building face, subject to certain standards as outlined in the PUD approvals. 16. Architectural standards for the 3-car Discovery homes shall be consistent with the approvals in the 12th Addition. 17. The applicant shall submit a street lighting plan and details for review by city staff. 18. Trees shall be planted outside of the right-of-way in the easement to ensure even spacing along the street. All homes must have street trees planted as shown in the landscape plan before a certificate of occupancy will be issued. 19. Park dedication shall be cash in lieu of land for the 14 new lots. The park dedication fee is subject to the fee schedule in place at the time the final plat is released for filing. City of Corcoran May xx, 2019 County of Hennepin State of Minnesota RESOLUTION NO. 2019-xx Page 3 of 3 20. All permanent wetland buffer monument signs must be erected along the wetland buffer line as required by Section 1050.010, Subd. 7 of the Zoning Ordinance. a. Wetland signs shall be purchased from the City. b. The final locations must be inspected and approved by City staff. c. Monuments and signs shall be installed prior to approval of the building permit. 21. The development shall comply with the City’s requirements regarding fire access, fire protection and fire flow calculations, the location of fire hydrants, fire department connections and fire lane signage. 22. The following conditions be met prior to issuance of building permits: a. The applicant must record the approving resolutions and associated documents at Hennepin County and provide proof of recording to the City. b. The applicant shall provide the approved preliminary and final plan drawings to the City in an electronic (AutoCAD) format. VOTING AYE VOTING NAY Thomas, Ron Thomas, Ron Bottema, Jon Bottema, Jon Dejewski, Brian Dejewski, Brian Keefe, Mike Keefe, Mike Schultz, Alan Schultz, Alan Whereupon, said Resolution is hereby declared adopted on this xx day of May 2019. ________________________________ Ron Thomas - Mayor ATTEST: ____________________________________ City Seal Jessica Beise – Administrative Services Director Henn e p in Co unty Prop erty Map Da te : 1/3 0/2019 Com ments: 1 inc h = 8 00 feet PAR C EL ID: 36 11923440012 OWN ER N AME : J O Nic ho ls & D L Nichols PAR C EL AD DR E SS: 6 351 C o R d No 101, Corcoran MN 55340 PAR C EL AR EA: 5.2 4 ac re s , 228,073 sq ft A-T-B: Ab s trac t SAL E PR ICE: $52,000 SAL E D ATA: 09/1988 SAL E C OD E: Wa rranty Deed ASSESS ED 2 017 , PAYABLE 2018 PR OPERT Y TYPE: Res idential H OM ESTEAD : Homes tead M AR KET VA L UE: $465,000 TAX TO TAL: $6,740.38 ASSESS ED 2 018 , PAYABLE 2019 PRO PER TY TYPE : Residential HO MESTEAD: Homestead MARKE T VALU E: $489,000 This dat a (i) is fur nished 'AS IS' wit h no repres ent at ion as to com pletenes s or acc ura cy; (ii) is furnis hed with no war rant y of an y k ind; an d (i ii) is not s uit able for lega l, engi neering or s urv ey ing purposes . Hen nepin C ounty s hall not be liable f or any dam age, in jury o r los s r esu lting f rom t his data. CO PYRIG HT © HENNEPIN CO UN TY 2 0 19 Technical Memo Wenck | Colorado | Georgia | Minnesota | North Dakota | Wyoming Toll Free 800-472-2232 Web wenck.com To: Kevin Mattson, PE, Director of Public Works From: Kent Torve, P.E. Nicholas Wyers Rowdy Schmidt Date: April 12th, 2019 Updated April 19th for Packet Subject: Ravinia – 11th Addition Plan Review Lennar submitted plans for the Ravinia development 11th Addition for City of Corcoran review. Plans dated December 18th, 2018 have been revised March 19th, 2019 for the proposed Ravinia development. The following comments are regarding the plans submitted and should be considered and addressed. A more detailed memo is transmitted to developer separately, which documents changes already made. 1.0 Transportation 1.1 Raise northwest corner of temporary cul-de-sac to provide more coverage over 21” storm pipe. 1.2 Install curb and gutter around temporary cul-de-sac 1.3 South end of Larkspur will need a radius transition on south end to accommodate traffic entering and exiting temp turn around. Review with Engineer. 1.4 Due to curve on Road 2, City recommends extending temporary turn around further into Outlot B. Shift temporary turn around to avoid CBMH 4. Coordinate with Engineer. 1.5 Temporary turnaround on Road 2 does not meet city requirements from City detail plate STR-22 on page 14. 1.6 No Parking sign to be placed at all temporary turnarounds. 2.0 Trails 2.1 No remaining comments 3.0 Sewer 3.1 Lot 1 Block 3 does not have sewer and water services. Verify with City whether it should be considered an Outlot. 3.1.1 Plat shows this lot as a platted lot. 3.1.2 Since no water service being installed to this property, remove sewer service from plans. 3.2 Verify depth of Lot 6 Block 1 sewer service with watermain crossing. Engineer’s Memo April 19, 2019 2 \\MSPFSV02\Studios\Planning & Urban Design Studio\City of Corcoran\COR19005 - Ravinia 11th FP and Final PUD\Engineers Plan Reivew_Streamlined for Planning Packet.docx 4.0 Water 4.1 No remaining comments 5.0 Grading and Stormwater Storm Sewer 5.1 Provide OCS detail for OCS 15. 5.1.1 Show draintile connection in OCS detail 5.1.2 Show pipe from structure to filtration basin in plan view. 5.1.2.1 Install flared end section as inlet pipe to infiltration basin 21. 5.2 Revise detail for OCS 15. 5.2.1 For example the inlet pipe is shown with an invert of 975.5 and drawn below the NWL at 975.2. 5.3 Relocate FES 13 to avoid the easement owned by adjacent property owner. 5.3.1 Discussions with City will involve constructability of hydrant, retaining wall, and RCP pipe/FES 13 in this area 5.4 EOF swale is acceptable for current proposed conditions. If area to the south is developed, a second pipe will need to be installed to act as the EOF for Wetland 16. 5.4.1 Show route of future EOF pipe from Wetland 16 to ensure lateral and vertical clearance. 5.5 Sump manhole to be moved from CBMH 3 to be CBMH 4. Wetland 14 / Wetland 18 This area has some uncertainty due to the expansion of the original Ravinia to include Phase 11 (Nichols). The model will require additional clarification. See attached figure. 5.6 Provide City updated topographic survey shots of this berm area with overflow elevations, pipes or other elevation controls 5.7 Revise the NWL and starting water elevation for Wetland 14. The model’s starting water elevation of 976.0 does not appear to be accurate based on the site ALTA and LiDAR. Additionally, it appears that the 972.9 EOF may be lower than the actual EOF/berm. Confirm with additional survey. 5.8 Wetland 18 storage starts at 972.0. Outlet pipe is shown as 969.8. Wetland 15/ Wetland 16/ Wetland 17 5.9 Revise the NWL and starting water elevation for Wetland 15. The starting water elevation (985.5) and outlet (986.8) do not correspond with the previously submitted NWL of 986.0 for Wetland 15. Provide topographic survey of wetland berm and sheet pile. Engineer’s Memo April 19, 2019 3 \\MSPFSV02\Studios\Planning & Urban Design Studio\City of Corcoran\COR19005 - Ravinia 11th FP and Final PUD\Engineers Plan Reivew_Streamlined for Planning Packet.docx 5.10 Set model starting elevation at the constructed outlet control elevations for Wetland 16 using the FES 12 invert elevation of 983.5. Filtration Basin 5.11 Remove Device 3 as an outlet for the filtration basin or clarify its function Other 5.12 Stormwater plan will need watershed approval. 5.13 Infiltration basin access shows coming off existing driveway off County Road 101. Confirm with county that this access will be allowed to remain. 5.14 When property to the south develops, a permanent access will be required from Road 2. 5.15 Raise basement floor of Lot 2 Block 3 to 1 ft above HWL of Wetland 16. 5.16 Locate and label all onsite and offsite EOFs 5.17 Locate and label EOF elevation for Wetland 16 5.18 Revise grading for EOF swale to direct future runoff within project limits. 5.19 Grading on east side of filtration basin is to be contained on Lennar property. 6.0 Erosion Control 6.1 No remaining comments 7.0 General 7.1 Add street lighting plan. 7.1.1 Street light on the end of road 2 to be installed between Outlot C and Lot 1 Block 2. 7.1.2 Confirm with public safety for street lighting on Larkspur Lane 7.1.3 City staff to review lighting plan prior to installation. 7.2 Lot 1 Block 2, provide clarification on platting needs to stay out of driveway easement. 7.3 Update detail plates to most recent City standards. elm creek Watershed Management Commission ADMINISTRATIVE OFFICE TECHNICAL OFFICE 3235 Fernbrook Lane Hennepin County Public Works Plymouth, MN 55447 Department of Environment and Energy PH: 763.553.1144 701 Fourth Ave. South, Suite 700 E-mail: judie@jass.biz Minneapolis, MN 55415 PH: 612.348.7338 E-mail: james.kujawa@hennepin.us CHAMPLIN • CORCORAN • DAYTON • MAPLE GROVE • MEDINA • PLYMOUTH • ROGERS Ravinia 11th Addition Corcoran, Project #2019-011 Project Overview: This project is a 5.6-acre, rural residential lot located on CR 101, approximately ¼ north of the four-corner intersection Maple Grove, Plymouth, Medina and Corcoran. Lennar Homes is proposing to subdivide the property into 14 single-family residential lots. This project triggers the Commission’s review for Stormwater Management (Rule D), Erosion and Sediment Controls (Rule E), Wetland Alteration (Rule G), and Buffer Strips (Rule I) to their 3rd Generation STWMP Rules and Standards. Applicant/Agent: US Home Corporation, Attention Paul Tabone. 16306 36th Ave. N Suite 600, Plymouth MN 55446. Phone: 952-247-3086. Email; Paultabone@lennar.com Engineer; Sathre-Bergquist Inc., Attention Charles Wiemerslage, 150 South Broadway, Wayzata, MN 55391. Phone; 952-476-6000. Email; cwiemerslage@sathre.com Exhibits: 1) ECWMC Request for Plan Review and Approval with fee, received April 10, 2019 2) Ravinia 11th Addition Preliminary Site Plans by Sathre-Bergquist Inc. dated December 18, 2018 with last revision date of March 19, 2019. a. Sheet 1 of 16, Title Sheet b. Sheet 2-3 of 16, Final Street Plan c. Sheets 4-5 of 16, Final Sanitary Sewer & Watermain Plan d. Sheets 6-7 of 16, Final Storm Sewer Plan e. Sheet 8 of 16, Final Grading Plan f. Sheet 9 of 16, Final Erosion Control Plan g. Sheets 10-16 of 16 Details h. Sheet TS, Tree Survey i. Sheet 1 of 1, Alta/NSPS Land Title Survey dated December 4, 2018. j. Sheets 1-2 of 2, Ravinia 11th Addition Plat k. Sheet 1 of 1, Ravinia 11th Addition, Preliminary Plan with last revision date of March 19, 2019. l. Ravinia 11th Addition lot tabulation 3) Wenck (city consultant) Ravinia 11th Addition review dated January 28, 2019 with redline response 4) Geotechnical Evaluation Report for Nichols Property dated January 7, 2019. 5) Nichols Stormwater Management Plan, by Advanced Engineering and Environmental Services dated March 15, 2019. 6) Ravinia overall density and phasing plan. Findings; 1) A complete application was received on April 10, 2019. The initial decision period, per MN Statute 15.99 expires on June 9, 2019. 2) This site is in the Elm Creek watershed basin. It drains south and east under CR 47 and through a series of wetlands and floodplains before reaching Elm Creek in Plymouth, just east of Peony Lane. 3) The existing land use is a rural, single family residential lot. It has 0.53 acres of impervious surfaces and 5.06 acres of grass/woods/wetland/ponding areas. 4) The proposed land use will have 1.65 acres on new impervious surfaces (note, this includes 0.31 acres from future development to the south that will be treated in filter basin 21) and 4.06 acres of lawns/grass/woods/wetlands/ponding area. Stormwater Management 5) One onsite filter basin is proposed in this addition. 6) There are three existing wetlands on this site that will not be impacted by this development. a. Wetland 16 is along the west side of the development. A 21” pipe will route water from wetland 16 east into wetland 17. b. Wetland 17 is on the south side of this development and drains to the south off site. c. Wetland 15 is on the east side of the site and drains into an existing ditch/culvert on CR 110 that runs east into the Fieldstone development in Maple Grove. i. The filter basin will drain into Wetland 15. 7) There are two discharge points from this development. a. Water flowing into wetland #17 then south off site b. Water flowing into Wetland #15 then into the CR 101 ditch culvert system. 8) Wetlands and filter basins will have drainage and utility easements placed over them as part of the platting process 9) The City of Corcoran requires landowners maintain stormwater basins. Lennar will be forming a Homeowners Association to operate and maintain this onsite filter basin. a. An operation and maintenance agreement between the city and HOA must be approved and recorded on the land title. 10) When the area south of this development is platted, it is presumed that Road 2 in the 11th addition will terminate into a cul-de-sac with five additional lots on that property. The stormwater filter basin on the 11th addition is proposed to treat this future development for rate, quantity and quality controls. 11) Rate controls will meet the Commission standards for 2, 10- and 100-year discharges. Based on the 2 main discharge points on this site, the rates will be as follows; 2-yr (cfs) 10-yr (cfs) 100-yr (cfs) Pre-Development Rates South (into Wetland 17) 6.3 13.1 22.5 Post-Development Rates South (into Wetland 17) 5.4 11.0 19.3 Pre-Development Rates East (into CR 101 ditch) 10.1 20.0 29.6 Post-Development Rates East (into CR 101 ditch) 7.6 19.6 28.3 12) Abstraction requirements will be for 1.65 acres new impervious areas on site and 0.31 acres of proposed new impervious areas for the future development to the south that will drain into the new filter basin in Ravinia 11th Addition. Total filtered abstraction required in this basin will be 1.96 new impervious areas, or 7,826 cubic feet. Actual filtration volume proposed will be 9,675 cubic feet, which will meet our abstraction requirements. a. Drawdown on the filter basin will be 23.7 hours. b. A forebay will be constructed as part of this basin. Its size was based on 10% of the filtration volume, or 976 cubic feet. 13) Phosphorus and Total Suspended solids were analyzed using P8 for pre and post development. Both loads will be reduced after development vs pre-development. This will meet the Commission standard. Water quality and abstraction will be as follows; Condition (based on 5.67 acres) TP Load (lbs/yr) TSS Load (lbs/yr) Abstraction (cu. ft.) Filtration (cu. ft.) Annual Volume* (ac. ft.) Pre-development (baseline) 2.3 733 N/A N/A 4.04 Post-development without BMPs 5.0 1547 7826 Post-development with BMPs 1.9 151 9675 4.65 Net Change -0.4 -582 N/A -1797 N/A 14) Buffer widths on the wetlands do not appear to meet the Commission standard of 10’ minimum, 25’ average. 15) The City of Corcoran is the LGU in charge of administering the MN WCA. There does not appear to be any impacts to the wetlands in this parcel. 16) Grading and erosion control plans meet the Commission’s requirements. Recommendation: An operation and maintenance agreement between the city and HOA must be approved and recorded on the land title. Wetland Buffers must meet the ECWMC requirements. Hennepin County Department of Environment and Energy Advisor to the Commission Landform®, SensiblyGreen® and Site to Finish® are registered service marks of Landform Professional Services, LLC. 1 MEMORANDUM 105 South Fifth Street, Suite 513 Minneapolis, MN 55401 Tel: 612-252-9070 Fax: 612-252-9077 www.landform.net DATE April 17, 2019 TO Brad Martens CC City Council, Planning Commission, Parks & Trails Commission FROM Kendra Lindahl, City Planner RE Active Corcoran Planning Applications Projects/Comments in blue italics are new Project marked with an * have moved from active to approved The following is a summary of project status for current, active projects: 1.Southeast District Master Plan and Design Guidelines update (city file 18-012). The draft 2040 Comprehensive Plan anticipates significant changes to the transportation network that make it necessary to update this plan, which is adopted as Appendix B of the Zoning Ordinance. At the April 26th meeting, the Council authorized staff to begin this work . Staff met with Hennepin County and is now drafting road alignments for incorporation into updated plan options. This item was discussed at the November 8th Council Work Session. The Planning Commission held a public hearing on April 4th and recommended approval. The City Council is expected to take action on April 25th. 2.Development Rights and OS&P ordinance updates (city file 18-014). One of the implementation strategies from the Draft 2040 Comprehensive Plan was to consider amendments to the OS&P ordinance to better reflect City goals. The Council is also considering changes to the development rights program. Staff presented the City Council with a work plan and schedule at the May 24th meeting. The Council discussed at the October 11th Work Session and the January 24th Work Session. The Council directed staff to schedule a public hearing. The Planning Commission held a public hearing on April 4th and recommended approval. The City Council is expected to take action on April 25th. 3.Preliminary Plat, Preliminary PUD and Rezoning for “Pheasant Ridge Second Addition”. (PID 0311923310003, 0311923430005, 0311923410002) (City File 18-029). The Council has reviewed and provided feedback to the applicant on a PUD sketch plan. This formal application for an OS&P subdivision is currently incomplete. Upon receipt of the missing items, staff will schedule this request for Council action. 4.Meyer Lot Line Adjustment at 10740 Bechtold Road (City File 18-039). The application is currently incomplete. Additional right-of-way is required for the lot line adjustment and this item will be scheduled for Council action when deemed complete. 5.Bellwether 2nd Addition Final Plat and Final PUD Development Plan (City file 19-001). The application is for PUD final plan approval for 79 lots and final plat approval of 50 lots. The Planning Commission held a public hearing on April 4th and recommended approval. The City Council is expected to take action on April 25th. 6.Ravinia 12th Final Plat and PUD Amendment (City file 19-002). The application for final plat would dedicate the remaining right-of-way for Gleason Parkway. The PUD Amendment is a request for a change in unit type. The Planning Commission held a public hearing on April 4th and recommended approval. The City Council is expected to take action on April 25th. Agenda Item ____ 7a. MEMORANDUM 2 7. Larkin Road Final Plat (City file 19-003). This is a request for preliminary plat for a two-lot subdivision with a private drive. The item has been scheduled for Council action on April 25th. 8. Rolling Hills Acres Preliminary Plat at 6730 Rolling Hills Road (City file 19-004). This application for a four-lot subdivision is incomplete and will be scheduled for a public hearing at the Planning Commission and City Council action when deemed complete. 9. Ravinia 11th Final Plat and Final PUD Plan (city file 19-005). The request is for 14 lots on the Nichols property. The preliminary approvals were granted on February 28th. The application is tentatively scheduled for Planning Commission and Council review in May. 10. Applewood Point Sketch Plan at 19220 County Road 10 (PID 25-119-23-14-0003) (City File 19- 007). Trek Development, Inc. has submitted a sketch plan for a residential development with a multi- family building and single-family homes. The Council reviewed a different sketch plan at the May 24, 2018 meeting and indicated support. This item is scheduled for Council review on April 25th. Also, there are several projects that have been approved, but are still not filed and closed out: 1. Corcoran Business Park (City file 06-005). The City Council granted a one-year extension to the final plat approval, which expired on April 12, 2011. Staff has spoken to the applicant and is still working to close out this project. Staff has spoken to the applicant and will schedule a meeting when more information is available on the Loretto sewer project. 2. Hope Ministries Conditional Use Permit for Cemetery and Vacation of Drainage & Utility Easement at 19951 Oswald Farm Road (City file 12-002). Hope Ministries submitted a request for a conditional use permit to allow a cemetery west of the existing church. The application was approved by the City Council on March 22nd and site work had begun. The letter of credit for site improvements has been released, but we are holding the escrow pending completion of the approved landscaping. The applicant has indicated that they are considering a site plan amendment application to modify the approved plans. Staff met again with Pastor Brian Lother in July 2017 to discuss the outstanding issues and future expansion plans on the property. 3. Sawgrass Preliminary Plat, Preliminary PUD Development Plan and Rezoning for Schendel property at 20400 County Road 10 (City file 14-027). The City Council approved the request on December 11, 2014 and granted the applicant 2 years to apply for the final plat and final PUD development plan. Peachtree Partners did not buy the property, but a different developer could still proceed with the approved plan. On December 9, 2016, the applicant submitted a written request to extend the approvals for an additional year. Staff recommended that this request be reviewed by the City Council, but adequate time was not provided to place this on a Council agenda prior to expiration. Staff administratively approved an extension until February 28, 2017 so that this request for extension could be considered at the February 23, 2017 Council meeting. At that meeting, the City Council approved a one year extension. The City Council approved another one year extension at the January 25, 2018 meeting. The applicant was granted another extension at the February 28, 2019 Council meeting. 4. Commercial Door Addition at 7670 Commerce Street (City file 15-010) The City received an application for approval of a building addition, which required a conditional use permit, interim use permit, variance and site plan approval. The project was reviewed at a public hearing at the June 4th Planning Commission meeting and was approved by the City Council on June 25th. The required landscaping will be finalized and constructed after the downtown infrastructure project is completed. The City will release the remaining escrow when the planting is completed. 5. 2040 Corcoran Comprehensive Plan (City file 17-001). This year-long process was kicked off with a joint City Council/Commission work session on March 16th followed by three community open houses/events and several commission meetings and Council work sessions. The Parks and Trails Commission reviewed at their March 20th meeting, the Planning Commission held a public hearing on April 5th and on April 26th the City Council approved the 2040 Comprehensive Plan for distribution to adjacent jurisdictions for comment. The adjacent jurisdictions have six months to review and comment and then Corcoran will send to the Metropolitan Council to review for compliance with regional MEMORANDUM 3 systems. The final draft was approved at the March 14th meeting and submitted to the Metropolitan Council. 6. Natural Resource Protection Ordinance (city file 18-010). The Council directed staff to look at options to preserve trees and natural resources to maintain the rural character of the community in both rural and urban areas. Staff presented for Council review at the May 24th meeting and the Council tabled this item. 7. Sketch Plan for “Edgewater of Corcoran” at 19220 County Road 10 (PID 25-119-23-14-0003 and 25-119-23-14-0002) (City file 18-018). Trek Development, Inc. has submitted a sketch plan for a residential development with a senior living continuum of care complex, apartment and single family homes. The Council reviewed the sketch plan at the May 24th meeting and indicated support. 8. Final Plat for “Rush Creek Run” at 7320 Rolling Hills Road (PID 28-119-23-22-0003) (city file 18- 026). A request for final plat approval was been submitted. The preliminary plat for this project was approved on April 26th. This final plat was approved at the October 25th Council meeting. 9. Peter and Jean Dahlheimer request for Topography Exemption and Wetland Delineation Exemption at 20702 County Road 50 (PID 22-119-23-41-0001) (City File No. 18-036). The application was reviewed and approved by the City Council action on November 8th. 10. Kariniemi Preliminary Plat for two lots at 20801 Larkin Road. (PID 2711923410009) (City File 18- 037). There was an error in the public hearing notice, so the Planning Commission opened the public hearing at the January 3rd Planning Commission meeting and continued it to February 7th. City Council approved the request on February 14th. 11. Corcoran Land Holdings L.L.C. Rezoning, Conditional Use Permit and Site Plan at the SW corner of CR 19 and CR 10 (PID 18-119-23-12-0001) (City File 18-038). The request is currently incomplete, but if the missing information is received the item could be scheduled for Planning Commission and Council review in February. The item was withdrawn. 12. Rezoning, Preliminary Plat and Preliminary PUD for U.S. Home Corporation (dba Lennar) for “Ravinia 11th Addition” (PID 36-119-23-44-0012) (City File 18-040). Lennar has filed a plat for 15 lots at 6351 CR 101 (the Nichols property) and is proposing to the property to Ravinia. The landowner submitted a sketch plan for Council review in 2017. A public hearing was held on February 7th and the City Council approved on February 28th. 13. Preliminary plat, final plat, and variances for “Dahlheimer Farms” on property located at 20702 County Road 50 (PID 22-119-23-41-0001) (City File 18-041). The Council approved a wetland waiver for a portion of this property in 2018. The applicants are proposing to subdivide the existing farm to create a 5-acre lot for the farmstead and the fields will be platted as an outlot. A public hearing was held on February 7th and the City Council approved on February 28th. 7b. CITY OF CORCORAN 8200 County Road 116, Corcoran, MN 55340 763.420.2288 – Office 763.420.6056 – Fax E-mail - general@ci.corcoran.mn.us / Web Site - www.ci.corcoran.mn.us MEMO Meeting Date: To: From: Re: May 2, 2019 Planning Commission Brad Martens, City Administrator City Council Report The Planning Commission last met on April 4, 2019. The following is a recap of some of the items discussed at City Council meetings since that time. A full recap can be found by reviewing the approved City Council minutes on the website April 11, 2019 Council Meeting Annual Fire Department Reports o Heard annual reports from the Hanover and Loretto Fire Departments City Hall Remodel – Review of Schematic Design o Heard presentation; discussion tabled to the May 9th Meeting. 2019 Dust Control Program o Authorized Resolution 2019-23 calling for the public hearing on the potential assessment and cost of dust control treatments to be applied to City Streets. City Council Meeting Rules of Decorum o Directed staff to draft rules of decorum for the City Council and Commissions. Equipment Purchase – Bobcat Loaders o Approved the purchase and trad of the Bobcat Loaders. April 25, 2019 Council Meeting Highway 55 Coalition – Independence Mayor Marvin Johnson o Received an update on the Highway 55 Coalition which is attempting to gain support to improve Hwy 55 to four lanes to County Road 19 Oath of Office – Police Reserves o Issued oaths for Police Reserves and welcomed new Reserves Cory Cracknell & Clayton Decker 7b. Police Reserve Update o Officer Vojacek provided an update on the Reserve program; Council thanked the Reserves for their dedication to the City Bellwether 2nd Addition Final PUD Development Plan o Approved the items as presented platting 50 additional new lots in the second addition Ravinia 12th Addition PUD Amendment and Final Plat o Approved a PUD amendment to allow 65’ width lots in the future 14th and 15th addition; approved the final plat for the right-of-way for Gleason Parkway Sketch Plan – 19220 County Road 10 o Provided feedback on a proposal for a 100 unite Applewood Pointe building at the property just north of Lions Park Southeast District Guidelines Update o Approved the update as presented Development Rights Program and Open Space and Preservation Ordinance Amendment o Tabled the approval to a future meeting Job Offer – Administrative Assistant o Authorized the Mayor and City Administrator to finalize a offer 2018 Surplus Allocation o Allocated 2018 surplus funds to the Long Range Planning Fund Attachments: None