HomeMy WebLinkAboutResolution 2018-93 Approving Final PUD Ravinia 10thCity of Corcoran
County of Hennepin
State of Minnesota
RESOLUTION NO. 2018 -93
Motion By: Bottema
Seconded By: Dejewski
November 19, 2018
APPROVING FINAL PLANNED UNIT DEVELOPMENT (PUD) PLAN FOR "RAVINIA 10TH
ADDITION" FOR THE LENNAR CORPORATION (PID 36- 119 -23 -43 -0040 AND 36- 119- 23 -43-
0041) (CITY FILE 18 -034)
WHEREAS, The Lennar Corporation ( "the applicant ") has requested approval of a final PUD
plan for 26 single family homes and three outlots on property legally described as:
Outlot A, Ravinia YhAddition
And
Outiot D, Ravinia 5tH Addition
WHEREAS, the Planning Commission has reviewed the plan at a public meeting and
recommends approval, and;
NOW, THEREFORE, BE IT HEREBY RESOLVED BY THE CITY COUNCIL OF THE CITY OF
CORCORAN, MINNESOTA, that it should and hereby does approve the request for a final PUD
development plan, subject to the following conditions:
1. A final PUD plan is approved to allow the creation of 26 single family lots and three outlots in
accordance with the application materials and plans received by the City on September 18,
2018, except as amended by this resolution.
2. Approval is contingent upon City Council approval of the final plat and development
contract.
3. The development contract must be amended and executed by the developer and the City and
must be filed with the final plat.
4. The development shall be subject to all conditions of the "Ravinia" preliminary PUD
development plan approval and all amendments.
5. The application shall comply with all conditions in the City Engineer's memo dated October
23, 2018.
Page 1 of 4
City of Corcoran
County of Hennepin
State of Minnesota
RESOLUTION NO. 2018-93
November 19, 2018
6. The PUD is hereby approved to allow 75-foot wide lots in this plat. All platted residential lots
shall comply with the following:
7. The site plan sheet (Sheet 1 of 18) shows different setbacks and must be corrected.
8. All garages must have a minimum 22-foot parking area in front of the garage that does not
overlap into sidewalks, drives or streets. Plans should be revised to indicate all driveway
locations to ensure compliance.
9. The plans show centralized mailbox locations. These mailbox locations shall be approved by
the US Postal Service and proof of the approved locations shall be provided to the City, prior
to issuance of building permits.
10. The project is subject to the PUD standards, which were amended to allow flexibility in
building materials and were granted PUD flexibility to allow the face of the garage to exceed
55% of the building face, subject to certain standards as outlined in the PUD approvals.
11. All homes must have street trees planted as shown in the landscape plan before a certificate
of occupancy will be issued.
12. An exhibit defining the boulevard landscaping and cul-de-sac island as landscape
maintenance areas to be maintained by the Homeowners Association will be required in the
Annexation Amendment to Neighborhood Declaration of Covenants for Ravinia 10th
Addition.
13. Park dedication is based on the development of the entire Ravinia site and shall be land
dedication totaling 32.12 net acres, due at the time of final plat for the phases that include
public park dedication. With this phase, the trail easements contribute to the total park
dedication. The net and gross areas will be required to calculate the total contribution to
park dedication for this phase of development.
a. The trail easements in recordable form must be submitted with a legal description
and net and gross easement areas.
b. Plans should be revised to locate the proposed trail segment that connects to
63rd Avenue north of wetland #9 to north of the wetland buffer
14. All permanent wetland buffer monument signs must be erected along the wetland buffer line
as required by Section 1050.010, Subd. 7 of the Zoning Ordinance.
Page 2 of 4
75-foot lots
Front
20 feet
Front Porch (:5 120 square feet)
15 feet
Side
5 feet
Rear
25 feet
Maximum Principal Building Height
35 feet
7. The site plan sheet (Sheet 1 of 18) shows different setbacks and must be corrected.
8. All garages must have a minimum 22-foot parking area in front of the garage that does not
overlap into sidewalks, drives or streets. Plans should be revised to indicate all driveway
locations to ensure compliance.
9. The plans show centralized mailbox locations. These mailbox locations shall be approved by
the US Postal Service and proof of the approved locations shall be provided to the City, prior
to issuance of building permits.
10. The project is subject to the PUD standards, which were amended to allow flexibility in
building materials and were granted PUD flexibility to allow the face of the garage to exceed
55% of the building face, subject to certain standards as outlined in the PUD approvals.
11. All homes must have street trees planted as shown in the landscape plan before a certificate
of occupancy will be issued.
12. An exhibit defining the boulevard landscaping and cul-de-sac island as landscape
maintenance areas to be maintained by the Homeowners Association will be required in the
Annexation Amendment to Neighborhood Declaration of Covenants for Ravinia 10th
Addition.
13. Park dedication is based on the development of the entire Ravinia site and shall be land
dedication totaling 32.12 net acres, due at the time of final plat for the phases that include
public park dedication. With this phase, the trail easements contribute to the total park
dedication. The net and gross areas will be required to calculate the total contribution to
park dedication for this phase of development.
a. The trail easements in recordable form must be submitted with a legal description
and net and gross easement areas.
b. Plans should be revised to locate the proposed trail segment that connects to
63rd Avenue north of wetland #9 to north of the wetland buffer
14. All permanent wetland buffer monument signs must be erected along the wetland buffer line
as required by Section 1050.010, Subd. 7 of the Zoning Ordinance.
Page 2 of 4
City of Corcoran November 19, 2018
County of Hennepin
State of Minnesota
RESOLUTION NO. 2018 -93
a. The wetland buffer signs must be relocated to comply with ordinance requirements as
the current plan does not comply. The revised plan must be submitted for City review
and approval.
b. Wetland signs shall be purchased from the City.
c. The final locations must be inspected and approved by City staff.
d. Monuments and signs shall be installed prior to approval of the building permit.
15. The development shall comply with the City's requirements regarding fire access, fire
protection and fire flow calculations, the location of fire hydrants, fire department
connections and fire lane signage.
16. The following conditions be met prior to issuance of building permits:
a. The applicant must record the approving resolutions and associated documents at
Hennepin County and provide proof of recording to the City.
b. The applicant shall provide proof of recording the final plat and related documents at
Hennepin County.
c. The applicant shall provide the approved preliminary and final plan drawings to the City in
an electronic (AutoCAD) format.
VOTING-. AVP
Thomas, Kon
® Bottema, Jon
® Dejewski, Brian
F-1 Keefe, Mike
® Schultz, Alan
Page 3 of 4
11nTlnlr nlov
L] Thomas, Ron
❑ Bottema, Jon
❑ Dejewski, Brian
F-1 Keefe, Mike
❑ Schultz, Alan
City of Corcoran
County of Hennepin
State of Minnesota
RESOLUTION NO. 2018 -93
November 19, 2018
Whereupon, said Resolution is hereby declared adopted on this 19th day of November
2018.
Ron Thomas -Mayor
ATTEST:
City Seal
Je ica eise — Cit
9r,
lerk /Administrative Services Coordinator
Page 4 of 4