Loading...
HomeMy WebLinkAbout2018-11-08 Council Work Session Agenda PacketCITY OF CORCORAN Council Work Session Agenda November 8, 2018 - 5:45pm 1.Call to Order / Roll Call 2.Southeast District Guidelines Update* 3.Unscheduled Items 4.Adjournment *Includes Materials - Materials relating to these agenda items can be found in the House Agenda Packet by Door. 105 South Fifth Avenue Suite 513 Minneapolis, MN 55401 Tel: 612-252-9070 Fax: 612-252-9077 www.landform.net Landform®, SensiblyGreen® and Site to Finish® are registered service marks of Landform Professional Services, LLC. TO: Corcoran City Council FROM: Kendra Lindahl, Landform DATE: October 31, 2018 for the November 8, 2018 City Council Meeting RE: Options to Update Appendix B of the Zoning Ordinance (Southeast District Plan and Design Guidelines) (City File 18-012) 60-DAY REVIEW DEADLINE:NA 1.Summary The Council has asked for a work session to discuss updates to the Corcoran Southeast District Plan and Downtown Design Guidelines based on changes in the proposed 2040 Comprehensive Plan, specifically related to changes to the planned road alignment. Background In 2004, the City of Corcoran adopted design guidelines for each of the three districts of the City planned to get municipal sewer and water: the Southwest District, the Northeast District and the Southeast District (including Downtown). In 2011, the City adopted a new Comprehensive Plan and new ordinance standards to implement the Comprehensive Plan. In 2015, the City of Corcoran, in partnership with Hennepin County, began work to update the existing design guidelines for the Southeast District. The Corcoran Southeast District Plan and Downtown Design Guidelines are proposed to be modified to reflect the 2030 Future Land Use Plan and other changes needed to implement the City’s Vision. The new Southeast District Master Plan and Design Guidelines were adopted in 2016 as Appendix B of the Zoning Ordinance. The draft 2040 Comprehensive Plan makes significant changes to the planned transportation system, which result in the need for changes to the Southeast District Plan. 2.Key Issues The primary focus of this effort is to update the subdistrict boundaries (Town Center and Downtown Core) based on the changes planned for the future transportation network. Specifically, the Council changed the transportation plan to eliminate the planned realignment of County Road 10 and 50. Keeping County Road 10 on the current alignment requires change to the Town Center plan. Staff has provided two concepts for Council consideration. Both options assume that County Road 10 will stay on its current alignment in this area and that Maple Hill Road will be realigned to tee into County Road 10. The intersection alignment at County Road 10 and County Road 116 would remain as is, but the plan does anticipate that additional right-of-way will be acquired. In each of the Agenda Item 2. SE District Design Guidelines Update 2 November 8, 2018 plans, access points on County Road 116 are fixed based on future street extensions at ¼ and ½ mile spacing per the County guidelines. On County Road 10, both concept shrink the standard spacing guidelines, but are consistent with initial concept discussion with County transportation staff. These plans also show the trunk sewer alignment, which was reviewed as part of the 2016 plan, but was not specifically shown on the previous plans. As staff took a fresh look at the site, we kept a similar mix of uses in the Town Center, including a town square park as a key element. However, we have looked more closely at the site and included a concept that shows existing water features as part of the stormwater treatment train. As a result, the wetlands and ditches become part of the stormwater management system and help to define blocks with in the Town Center. These can be amenities for development in the Town Center. This could be used as part of a regional stormwater system or incorporated as part of each development site. • The Council should discuss stormwater as a design feature. As we have discussed previously, this is an aspirational plan for the Town Center and the Council should plan to use it as a guiding document with flexibility to respond to the marketplace. The guidelines envision 2- and 3-story buildings in the Downtown Core, but some uses (like apartments) may desire 4- or 5-story buildings. • The Council should discuss building heights in the Town Center and Downtown Core. Are there areas where buildings with more than 3-stories would be encouraged? The Council should provide direction about their preferred Concept and any feedback on the issues of height, stormwater, parks, internal street alignment or other high-level design issues. Based on this direction, staff would refine the preferred concept and prepare an updated Southeast District Plan for a future Council meeting. At that meeting, we would have additional discussion about other design issues in the Southeast District (including the Town Center and Downtown Core) and next steps in the update date process. Summary Staff has provided 2 concepts for the Town Center plan based on the revised street plan. Staff prefers Concept #1 because it offers the most effective street system and a slightly smaller and more achievable mixed use area. 3. Recommendation The Council should provide feedback on the preferred options and the key design issues. Attachments 1. 2016 Town Center Plan 2. DRAFT 2040 Roadway Functional Classification Map 3. Concept 1 4. Concept 2 26 | Town Center Mixed Use with Commercial at Street Level Mixed Use with Office at Street Level Apartments & Town Homes Single Family Town Center Legend Downtown Core Gateway Nodes 79th Place 79th Place 79th Avenue 78th Avenue Main Street 76th Avenue 75th Avenue Larkin Road Qu i n c e L a n e Ci t y C e n t e r D r i v e Ci t y C e n t e r D r i v e Co u n t y R o a d 1 1 6 Re b e c c a P a r k T r a i l Po p l a r L a n e Oa k L a n e Mu l b e r r y L a n e La r c h L a n e Ma p l e H i l l R o a d Good Sheperd Church City Hall Not To Scale Ci t y o f G r e e n f i e l d City of Maple Grove City of Medina City of Rogers Be c h t o l d R d Pio n e e r T r l Trail Haven Rd Co u n t y R o a d 1 1 6 County Road 30 Schutte Rd Oakdale Dr County Ro a d 1 0 Horseshoe Trl C o u n t y R o a d 5 0 Larsen Rd Wi l l o w D r Hunter Rd Co u n t y R o a d 1 9 Homestead Trl Ca i n R d Ro l l i n g H i l l s R d Country Rd Mo h a w k D r Larkin Rd Fo x l i n e D r Strehler Rd Dassel Ln Old Settlers R d Stie g R d Ka l k R d Meister Rd Ma p l e H i l l R d 93rd Ave N Tessmer Rd Bl u e B o n n e t D r Jubert Ln 456710 456750 456719 456730 4567116 4567101 4567117 Br o c k t o n L n N 109th Ave N 4567101 4567101 ")55 Hackamore Rd Morin Lake Scott Lake Jubert Lake Goose Lake Cook Lake R u sh C r e e k RushCreek SouthForkRu s h C r e e k S outh F orkRush Creek RushCreek 2040 COMPREHENSIVE PLAN 3,000 0 3,0001,500 Feet ± Path: L:\2294\100\2040CompPlan\2040 Roadway Funtional Classification.mxd Date: 2/1/2018Time: 6:42:51 AMUser: shujc0243 Principal ArterialA Minor RelieverA Minor ExpanderProposed A Minor ExpanderA Minor ConnectorProposed A Minor ConnectorMajor CollectorProposed Major CollectorMinor CollectorProposed Minor CollectorMunicipal BoundaryParcel BoundariesStreamsLake/Open Water Map 6-72040 Roadway Functional ClassificationDraft FINAL DRAFT -- MAY 29, 2018 103 ~ 1400 ft from Intersection CR10 and 116 ~ 7 2 0 f t f r o m inte r s e c t i o n NORTH1” = 200’ Concept #1 Development Data - North of CR 10 Use Estimated Area Estimated Development Mixed Use 30.5 Acres 665,000 S.F. Apartments (10+ Units/Ac)9.9 Acres 150 Units Townhomes (5-8 Units/Ac)21.5 Acres 170 Units Single Family Res (3-5 Units/Ac)51.7 Acres 250 Units Town Square Park 7 Acres n/a Wetlands (In Town Center)14.3 Acres n/a Development Data - South of CR 10 Mixed Use 2.9 Acres 62,000 S.F. Townhomes (5-8 Units/Ac)10.1 Acres 80 Units Single Family Res (3-5 Units/Ac)26.1 Acres 130 Units Landform® and Site to Finish® are registered service marks of Landform Professional Services, LLC. SE DISTRICT UPDATE • Corcoran, MN City Council • 11.08.2018 Concept #1 ~ 1400 ft from Intersection CR10 and 116 ~ 7 2 0 f t f r o m inte r s e c t i o n NORTH1” = 200’ Concept #2 Development Data - North of CR 10 Use Estimated Area Estimated Development Mixed Use 41.8 Acres 910,000 S.F. Apartments (10+ Units/Ac)21.7 Acres 250 Units Townhomes (5-8 Units/Ac)19.4 Acres 150 Units Single Family Res (3-5 Units/Ac)48.0 Acres 240 Units Town Square Park 5.4 Acres n/a Wetlands (In Town Center)14.3 Acres n/a Development Data - South of CR 10 Mixed Use 2.9 Acres 62,000 S.F. Townhomes (5-8 Units/Ac)10.1 Acres 80 Units Single Family Res (3-5 Units/Ac)26.1 Acres 130 Units Landform® and Site to Finish® are registered service marks of Landform Professional Services, LLC. SE DISTRICT UPDATE • Corcoran, MN City Council • 11.08.2018 Concept #2