HomeMy WebLinkAbout2018-09-13 Council Work Session Agenda Packet CITY OF CORCORAN
Council Work Session Agenda
September 13, 2018 - 5:45pm
1. Call to Order / Roll Call
2. City Hall Remodel*
3. Unscheduled Items
4. Adjournment
*Includes Materials - Materials relating to these agenda items can be found in the House Agenda Packet by
Door.
CITY OF CORCORAN
1
MEMO
Meeting Date: September 13, 2018
To: City Council
From: Brad Martens, City Administrator
Re: City Hall Remodel
______________________________________________________________________
In January staff discussed the need for a potential remodel of City Hall to accommodate
the growing number of staff/services and to more efficiently utilize space at City Hall.
The following recaps the need for the remodel.
Administration:
• Storage is very limited in our current location. The City is required to maintain
certain documents permanently and each agenda packet, audit, and budget
document will be kept. By 2020 it is projected that the City will need an additional
precinct for voting and there is not sufficient room for additional voting booths,
pollbooks, and ballot counter.
• In addition to a lack of storage, there is limited space for current and future
staffing needs. When the City Engineer, Planner and Recreation Coordinator are
all present the conference room must be utilized removing important space for
meetings to take place. The desk shared by the Planner and Recreation
Coordinator is also the scanning station for Laserfiche which is utilized by other
staff to scan in large batches of documents. Currently only Mondays are
available for staff to utilize that equipment. As budgeted in 2018, staff will be
looking at another position or consultant for assistance on proactive code
enforcement. There will not be a space for this position to sit in the main office
space if any other consultants are in. Additionally the City is growing in
population and will overtime have additional staffing needs to support the
services required by the residents.
• Safety is a concern for staff members in the Administration Department. There is
easy access to the office space with a half door that leads into the offices should
someone want to gain access. No bulletproofing exists in the Council Chambers
or other safety measures in case of an active shooter.
• The space in City Hall could be more functional. The main lobby area is not well
utilized. Other than election day and a rare gathering for Council, the lobby space
could be used for a conference room. The copier area, has cabinets that are
underutilized but are not large enough to store bankers boxes of records or most
election equipment. The current front desk space is not secured, which requires
CITY OF CORCORAN
2
the administrative staff to not utilize the desk space to house a staff member.
There is no break room for staff members to eat lunch. The Council Chambers
and Police Conference Room act as a lunch room should multiple staff members
decided to have lunch together.
• The current City Hall customer service experience is lacking. With no person
sitting at the front desk, there can be a perception that no one is at City Hall. Staff
is responsive when customers are in the lobby but something is lost when there
is no one to direct those initial customer interactions.
Police:
• The police department has managed its portion of the facility over the last 10
years by using creative solutions to adapt to the available space and
reconfiguring space where possible (like adding a storage mezzanine in the
garage or previously hosting officer lockers in the meeting room). The existing
space has been reconfigured as much as possible but it is apparent that
structural adjustments and expansion will be necessary for their continued
operations.
• Over the past several years the police department has worked to maximize as
much operating space as possible. This includes scanning over six file cabinets
full of documents into digital storage, regular destruction and removal of old
evidence, and temporarily moving North Memorial’s ambulance crew staging
space out of the facility to accommodate a private changing area for the officers.
• Existing space conflicts include: insufficient space for secure evidence storage,
no space for victim or witness interviews, no space for suspect interviews or
observation, the Public Works Director is occupying one of the few police
department offices, there is currently no office space available for the Police
Detective, North Memorial no longer has ambulance crew staging space, the
Police Lieutenant’s Office lacks sufficient space for meeting with two officers (for
example a trainee and his/her trainer), there is insufficient storage space for
event supplies and training equipment, they have been forced to add a temporary
workstation in the training/meeting/conference room, and existing administrative
support workspace is not compliant with FBI, BCA, or CJDN network rules.
Public Works:
• The Public Works Director’s office is undersized and currently located in the
Police Department. There is significant coordination required between all
departments in terms of planning, engineering, accounting, and permitting to
maintain efficient management of the many infrastructure and housing projects
taking place. In addition to an office for the Public Works Director, additional
meeting space is required to allow for the many overlapping groups to keep
services moving forward.
CITY OF CORCORAN
3
Overall:
• The building as it exists today is at capacity. Achieved growth requires
improvements to City Hall to accommodate the new needs of the City.
Anticipated growth will require additional staff that cannot be accommodated
without improvements.
After discussion at the January meeting, the Council authorized staff to engage an
architect for review of existing conditions, needs analysis, preliminary plans, and a draft
budget. After interviewing firms, Wold Architects and Engineers was hired for the
project.
Over the last several months multiple meetings have taken place for the needs analysis
to be completed and is attached to this report. The document includes meeting minutes
as well as a draft plan and budget for a potential remodel to accommodate the needs of
the City for now and into the future.
The proposed plan is broken down into two phases. Phase one includes a fairly
significant remodel which would accommodate the needs of the City for the next several
years. It includes relocating the Council Chambers to the community room to allow for
additional work stations to be moved into the existing Council chambers. This is much
more affordable than adding square foot to the building. Phase one would also allow for
work stations for interns and part-time staff which would allow for incremental staffing
transitions as the City grows.
Phase two assumes that the Police Department transitions out of the existing City Hall
building into a new building. The main goal when working through phase one was to
ensure that nearly all improvements would work within phase two.
Finance:
Page 25 of the needs study estimates the cost of phase one at between $1,001,000 -
$1,168,000. This is a rough number and includes a fairly significant “miscellaneous
project costs” at 25%. It is anticipated that this is on the high end of what a project could
actually cost.
The goal to finance the remodel would be to use revenue from the growth to pay the
project as growth is what is causing the demand. The following is a plausible scenario
for financing the remodel:
Cash in-hand now or in 2019
• 2018-2019 CIP Allocation $125,000
• Long Range Planning Fund: $300,000
• 2018 Building Permit Surplus $50,000
• 2019 Allocation of Transfer $120,000
Sub-total $595,000
CITY OF CORCORAN
4
The remainder would need to come from an inter-fund loan from either the sewer fund
or park dedication fund. Assuming the gap is $405,000 (for a project at $1,000,000) a
six year loan at $67,500/year plus interest could pay for the remainder. This could be
funded through building permit revenue.
It should be noted that the finance plan is very draft and would need further vetting.
It is requested that the City Council discuss the proposed remodel and provide direction
to staff on next steps which could include the following:
1. Formalize and refine finance plan
2. Obtain quote to proceed with plans and specifications; refine plans
3. Draft bidding documents
4. Bid project; select contractor
5. Begin remodel
Staff recommends proceeding with items 1 and 2 as outlined above.
Staff from Wold Architects and Engineers will be available at the meeting to present the
findings. It is requested that City Councilmembers find time to tour City Hall in advance
of the meeting.
Attachments:
1. Space Needs Study
Commission No. 182066
Space Needs Study:
Corcoran City Hall & Police Department
Space Needs and Facility Analysis
City of Corcoran
8200 County Rd 116
Corcoran, Minnesota 55340
Draft: September 13, 2018
City of Corcoran
Space Needs and Facility Analysis
September 13, 2018
Page 2 Commission No. 182066
Table of Contents
Introduction 3
Committee Members 4
Study Methodology 5
Space Needs Committee Meeting Schedule 6
Facility Analysis 7-12
Program – Existing & Proposed 13-17
Options Analysis 18
Recommendation 19
Recommendation Analysis and Diagrams 20-23
Budget Projections 24-25
Appendix A – Meeting Minutes 26-45
City of Corcoran
Space Needs and Facility Analysis
September 13, 2018
Page 3 Commission No. 182066
INTRODUCTION
Wold Architects and Engineers and the City of Corcoran Space Needs Committee are pleased to
submit to the Corcoran City Council, this Space Needs Analysis and Recommendation. The Space
Needs Committee wishes to thank the City Council for authorizing the formation of this
Committee, and to City staff for their efforts in providing the Committee with the information
necessary to aide their study and advance the development of their recommendation.
Thank you for the consideration of this project recommendation.
Joel Dunning, AIA, LEED AP
Wold Architects and Engineers
City of Corcoran
Space Needs and Facility Analysis
September 13, 2018
Page 4 Commission No. 182066
SPACE NEEDS COMMITTEE
Brad Martens, City Administrator
Jessica Beise, City Clerk/Administrative Services Coordinator
Matt Gottschalk, Director of Public Safety
Kevin Mattson, Public Works Director
WOLD ARCHITECTS AND ENGINEERS
Joel Dunning
Jonathan Loose
Derek Gallagher
Zachary Battaglia
City of Corcoran
Space Needs and Facility Analysis
September 13, 2018
Page 5 Commission No. 182066
STUDY METHODOLOGY
To arrive at the conclusions in this report, meetings and discussions occurred among the Wold
team, the Space Needs Committee, and City of Corcoran and Corcoran Police Department staff.
This effort included an analysis of existing facilities and space needs, as well as a study of future
growth.
Existing Space Use Documentation
The Space Needs Committee toured the existing City Hall/Police Department facility with Wold
to gather information about current space use. Wold interviewed staff about current deficiencies
and future needs.
Facility and Building Systems Analysis
In addition to space use and needs, Wold reviewed and documented the existing facility to aid in
planning for future upgrade and replacement projects that could be planned in conjunction with
or between major project phases. This included a review of mechanical and electrical systems, the
condition of existing finishes, and accessibility.
Programming and Phasing
Information gathered during facility tours and staff interviews was organized into a space
program, a document that records how existing space is allocated to certain functions by
department. Future staffing projections were used to establish a future space program which was
organized into phases.
Project Option Development
Using the future space program, Wold developed options for future space use. Project options
included diagrams representing a remodeling and expansion of the existing facility. Options also
included a proposed new Police Department Facility in the long term at an undetermined site.
Wold developed these options with the Space Needs Committee over the course of several
iterations through meetings and correspondence. Through this process, the Space Needs
Committee refined the future space program and the proposed project phases.
Budget Projections
After refining the proposed project phases, Wold developed projected budgets for the two project
phases that were established by the Space Needs Committee. Budget projections were produced
for a range of project start dates to aid the city in planning for project schedules and funding.
City of Corcoran
Space Needs and Facility Analysis
September 13, 2018
Page 6 Commission No. 182066
SPACE NEEDS COMMITTEE MEETING SCHEDULE
Meeting #1 February 8, 2018 Kickoff Meeting
Introductions
Example Project Review
Project Goals/Expectations
Establish Guiding Principals
Review Programmatic Deficiencies
Meeting #2 February 14, 2018 Staff Interviews
Document Corcoran City Hall
Document Corcoran Police Department
Discuss Current Deficiencies
Discuss Projected Staff Growth
Meeting #3 February 28, 2018 Programming
Review Existing Space Program
Establish Phased Future Space Program
Tour Corcoran Public Works Facility
Meeting #4 March 28, 2018 Project Options
Discuss Future Project Options
Refine Space Needs
Refine Project Phases
Meeting #5 May 9, 2018 Project Budgets
Updated Project Options
Review Projected Project Budgets
Meeting #6 June 8, 2018 Building Systems Analysis
Document Mechanical/Electrical Systems
Meeting #7 -TBD- City Council Presentation
City of Corcoran
Space Needs and Facility Analysis
September 13, 2018
Page 7 Commission No. 182066
FACILITY ANALYSIS
Wold Architects and Engineers toured through the existing City Hall and Police facility to assess
the major building systems and components the following is a summary of the findings:
ARCHITECTURAL ANALYSIS
Architectural Issues
• Public toilet facilities in City Hall do not meet current accessibility code and finishes show
signs of wear.
• The asphalt shingle roof on the City Hall portion of the building is likely over 20 years into
a 30 year life. The shingles show signs of staining, but little sign of damage. Based on
current conditions, reroofing is not required in the short-term, though the long-term
projects planned for the facility should take replacement into account.
• A portion of the masonry wall on the north side of the building shows signs of settling.
This has led to cracking and separation of brick mortar joints in the affected area which
could lead to water infiltration. Additionally, a portion of the adjacent sidewalk is
separating from the wall which indicates that the problem is likely caused by a problem
with the foundation.
Recommendations:
• Replace damaged brick, excavate and correct foundation.
o Priority: 1
• Renovate public City Hall toilet facilities.
o Priority: 2
• Replace asphalt shingle roof at City Hall.
o Priority: 3
City of Corcoran
Space Needs and Facility Analysis
September 13, 2018
Page 8 Commission No. 182066
ELECTRICAL SYSTEMS ANALYSIS
Electrical Distribution System:
• 1994 and 2004 Construction
• Electrical service is original to the building. The service is 600A, 240/120V utility service
made up of three separate disconnects feeding electrical panels. The service does not need
upgrading at this time and could accommodate the proposed remodel.
• All panels are original to the building and in good condition. There are some spare
breakers to accommodate additional circuits. The building panels are within their life
expectancy and upgrading is not recommended at this time, but they should be replaced
in the next 10 years. Additional panels may be required to handle additional building
loads.
• There is an existing generator located at the exterior of the building’s electrical service.
This is original to the building and is in good condition. Replacement is not recommended
at this time.
• There is one transfer switch to back up the entire building. This is original to the building
and not recommended for replacement at this time.
Interior Lighting:
• The building fixtures are fluorescent parabolics and lensed troffers. The police fixtures
were updated during the 2004 remodel and the city hall side fixtures are original to the
building. It is recommended that these be upgraded to LED fixtures at the next remodel
requiring ceiling reconfiguration. Dimmed fixtures use less energy than fixtures on at 100
percent. Maintenance cost for LED fixtures is reduced compared to fluorescents due to
LED fixtures not requiring lamp replacement.
o The council chambers lighting is made up of CFL/incandescent fixtures and it is
recommended that they be upgraded to LED at next remodel of council chambers
space.
• The interior of the building is manual only controls via toggle switches. It is recommended
to add automatic occupancy controls at the next lighting fixture upgrade to reduce energy
use.
• Exit lights are original, but in good condition, and are located in all paths of egress.
Upgrading is not recommended at this time.
City of Corcoran
Space Needs and Facility Analysis
September 13, 2018
Page 9 Commission No. 182066
Site Lighting:
• All pole mounted parking lights are LED.
• Building mounted lights are fluorescent floods on motion sensors. It is recommended to
upgrade these to LED.
• Exterior canopy and downlights are compact fluorescent. It is recommended that these be
upgraded to LED.
• Exterior lights are controlled via time clock. All exterior areas are well lit according to the
owner.
Fire Alarm:
• Fire alarm system is in good condition and the owner noted no issues. Replacement is not
recommended at this time.
• System provides coverage in all code required location.
Telecom/Data:
• Category 5e cabling used throughout the building.
Recommendations:
• Replace original panels within 10 years when they are past their life expectancy.
o Priority: 2
• Upgrade Telecom/Data cabling to Category 6a throughout the building.
o Priority: 2
• Upgrade interior fixtures to LED lighting to allow for dimming control of fixtures.
(Fixtures in spaces untouched by other construction)
o Priority: 3
• Upgrade exterior building mounted lights to LED.
o Priority: 2
City of Corcoran
Space Needs and Facility Analysis
September 13, 2018
Page 10 Commission No. 182066
MECHANICAL SYSTEMS ANALYSIS
Heating and Ventilation:
• Existing construction 1994, 2004, 2009
• The building is primarily heated and ventilated through eight(8) packaged central geothermal units
with overhead distribution and underground return ductwork. They are connected to a ground-
source closed-loop well-field. The units are a legacy product manufactured by GeoComfort
installed around 2009. There are two(2) separate internal geothermal loops for each set of four(4)
units. The circulating pumps utilize VFD technology. In general the units are in good condition and
will reach their life expectancy in the next 10 years. The underground distribution ductwork has
been recently cleaned. There have been no major signs of deterioration, but regular inspections are
recommended.
• Venmar plate-and-frame energy recovery units provide tempered fresh air for the geothermal units.
• The garage space includes gas-fired unit heaters for heating as well as an exhaust fan with an
electronic damper wall louver for ventilation.
• The lobby space is a large volume space with vaulted ceilings that could benefit from
destratification fans.
• The building includes NG service and a local LP back-up tank for the garage space.
• The kitchen includes a type 1 hood and exhaust fan that appears to have the proper chemical
suppression systems and ductwork construction. It was noted that the range top/oven is an older
open pilot-light model.
• The exhaust fans in toilet rooms are in need of replacement and may not comply with current code.
Temperature Control:
• Each geothermal unit utilizes its own 7-day programmable thermostat. A combination of this
controls strategy along with the use of existing ductwork in place from the original construction
and the zones being larger, there are common complaints regarding the varying space
temperatures. As a separate item, a more central building automation system could be considered.
•
Air Conditioning:
• Cooling for the building is through the geothermal units. As noted in the TC description, the
combination of several rooms to a single unit does create disparate temperatures during certain
weather conditions.
• The primary server rack for the building is placed in an open storage room with no dedicated
cooling system.
City of Corcoran
Space Needs and Facility Analysis
September 13, 2018
Page 11 Commission No. 182066
Plumbing:
• The building includes three localized water heaters. Two being electric, the other propane. All of
them are at or near their life expectancy. The atmospheric propane-fired heater does not appear to
have proper fresh air intake infrastructure for combustion air.
• A single tank electromechanical softener treats the buildings’ domestic water distribution system.
• The building plumbing fixtures are beginning to show signs of age and eventual scale build-up.
Major renovations should consider replacement with new fixtures utilizing more low-flow options.
Fire Protection:
• The building is not sprinklered.
Recommendations:
• Provide destratification fans for the lobby space.
o Priority: 1
• Replace toilet room exhaust fans.
o Priority: 1
• Replace plumbing fixtures; utilize low flow fixtures where feasible with flow and pressure (This
item accounts for replacement of fixtures not included in the accessibility upgrades to the public
toilet rooms.)
o Priority: 2
• Provide split-system computer room cooling unit for the server area and create separate room.
o Priority 3
City of Corcoran
Space Needs and Facility Analysis
September 13, 2018
Page 12 Commission No. 182066
COST SUMMARY
Deferred Maintenance Construction Costs – Phase 1
• Replace damaged brick, excavate and correct foundation.
o Priority: 1 (Phase 1)……………………………………………………. $18,000
• Renovate public City Hall toilet facilities.
o Priority: 2 (Phase 1)……………………………………………………. $52,000
• Replace original electrical panels.
o Priority: 2 (Phase 1)……………………………………………………. $30,000
• Upgrade Telecom/Data cabling to Category 6a throughout the building.
o Priority: 2 (Phase 1)……………………………………………………. $22,000
• Replace remaining plumbing fixtures throughout building.
o Priority: 2 (Phase 1)................................................................................. $10,000
• Replace toilet room exhaust fans.
o Priority: 1 (Phase 1)…………………………………………………… $15,000
• Provide split-system computer room cooling.
o Priority: 2 (Phase 1)……………………………………………………. $30,000
• Provide destratification fans for the lobby space.
o Priority: 2 (Phase 1)……………………………………………………. $5,000
TOTAL PHASE 1: $182,000
Deferred Maintenance Construction Costs – Phase 2
• Replace asphalt shingle roof at City Hall.
o Priority: 3 (Phase 2)……………………………………………………. $60,000
• Upgrade interior fixtures to LED. (Fixtures untouched by other construction)
o Priority: 3 (Phase 2)……………………………………………………. $36,000
• Upgrade exterior building mounted lights to LED.
o Priority: 2 (Phase 2)…………………………………………………… $11,000
TOTAL PHASE 2: $107,000
City of Corcoran
Space Needs and Facility Analysis
September 13, 2018
Page 13 Commission No. 182066
PROGRAM – EXISTING & PROPOSED
Wold Architects and Engineers reviewed existing building plans with City Hall and Police Department
staff to determine how existing spaces are used. This information was used to produce an Existing
Building Program which was organized by department. Staff also informed Wold about existing spatial
deficiencies and future staff projections. This information was used to generate a Proposed Program. This
program was further refined into two phases through an iterative process of developing layout options.
The Existing Building Program and the final two-phase Proposed Program can be found in the following
pages.
City of Corcoran
Space Needs and Facility Analysis
September 13, 2018
Space Program Summary
Existing
Building
Program
Proposed
Program
Phase 1
Departmental Summary EXISTING NEW
1.10 Council/Community 4,970 s.f.3,635 s.f.3,995 s.f.
2.10 City Hall Shared 724 s.f.922 s.f.1,651 s.f.
2.20 City Admin 474 s.f.597 s.f.833 s.f.
2.30 Building and Inspections 95 s.f.3,635 s.f.3,995 s.f.
2.40 Planning 64 s.f.25 s.f.201 s.f.
2.50 Public Works 64 s.f.135 s.f.135 s.f.
2.60 Code Enforcement 0 s.f.56 s.f.56 s.f.
2.70 Finance 64 s.f.56 s.f.313 s.f.
3.10 Police Administration 615 s.f.984 s.f.2,442 s.f.
3.20 Investigations 0 s.f.120 s.f.770 s.f.
3.30 Patrol 190 s.f.25 s.f.1,148 s.f.
3.40 Booking 80 s.f.80 s.f.1,400 s.f.
3.50 Evidence 100 s.f.210 s.f.1,680 s.f.
3.60 Police Support Spaces 500 s.f.715 s.f.4,466 s.f.
3.70 Police Squad Garage 970 s.f.970 s.f.11,228 s.f.
4.00 Ambulance 245 s.f.120 s.f.245 s.f.
Total USF 9,155 s.f.12,285 s.f.11,179 s.f.23,133 s.f.
x 1.20
Total GSF 12,520 s.f.12,520 s.f.12,520 s.f.28,000 s.f.
1.00 PUBLIC
1.10 Council/Community
Council Chamber 865 s.f.--
Community Room/Council Chamber 2,140 s.f.2,140 s.f.2,140 s.f.
Dais Storage --140 s.f.
A/V Equipment Room -60 s.f.60 s.f.
Conference Room 360 s.f.190 s.f.360 s.f.
Coats 130 s.f.70 s.f.70 s.f.
Table Storage 180 s.f.180 s.f.180 s.f.
Kitchen 235 s.f.235 s.f.235 s.f.
Storage (Elections)140 s.f.140 s.f.190 s.f.
Lobby 920 s.f.620 s.f.620 s.f.
Council/Community Net Area Total:4,970 s.f.3,635 s.f.3,995 s.f.
Net to Usable SF Factor
Council/Community USF Needed
2.00 CITY HALL
2.10 City Hall Shared
Drop-in Workstation 64 s.f.56 s.f.56 s.f.
Drop-in Workstation --56 s.f.
Contract Drop-in (IT)-25 s.f.25 s.f.
Reception Workstation 270 s.f.56 s.f.56 s.f.
Copy 135 s.f.135 s.f.60 s.f.
Kitchen/Break Room 80 s.f.140 s.f.340 s.f.
Storage 175 s.f.200 s.f.200 s.f.
Lobby Conference Room -250 s.f.250 s.f.
Large Conference Room --380 s.f.
Secondary Conference Room --64 s.f.
Supplies Storage --100 s.f.
Quiet Room -60 s.f.64 s.f.
City Hall Shared Net Area Total:724 s.f.922 s.f.1,651 s.f.
Net to Usable SF Factor
City Hall USF Needed
2.20 City Admin
City Administrator Brad Martens 230 s.f.180 s.f.180 s.f.
Assistant City Administrator 140 s.f.180 s.f.
Proposed
Program
Phase 2
s:/Ci-Stillwater/Police/122219/Stillwater Police Space Program.xlsx Comm. No. 182066
City of Corcoran
Space Needs and Facility Analysis
September 13, 2018
Space Program Summary
Existing
Building
Program
Proposed
Program
Phase 1
Proposed
Program
Phase 2
City Clerk Jessica Beise 180 s.f.140 s.f.140 s.f.
Administrative Assistant Michelle Friedrich 64 s.f.56 s.f.56 s.f.
Recreation Coordinator -56 s.f.56 s.f.
Part-Time Admin Assistant -25 s.f.25 s.f.
Administrative Services Director --140 s.f.
Management Analysis --56 s.f.
City Admin Net Area Total:474 s.f.597 s.f.833 s.f.
Net to Usable SF Factor
City Admin USF Needed
2.30 Building and Inspections
Zoning/Code Compliance Mike Pritchard 70 s.f.56 s.f.56 s.f.
Building Inspections (Contract)-25 s.f.25 s.f.
Address Files 25 s.f.--
Building and Inspections Net Area Total:95 s.f.81 s.f.81 s.f.
Net to Usable SF Factor
Building and Inspections USF Needed
2.40 Planning
Planning (Contract)Kendra 64 s.f.25 s.f.25 s.f.
City Planner --56 s.f.
Community Development Coordinator --120 s.f.
Planning Net Area Total:64 s.f.25 s.f.201 s.f.
Net to Usable SF Factor
Planning USF Needed
2.50 Public Works
Public Works Director Kevin Mattson 64 s.f.135 s.f.135 s.f.
Public Works Net Area Total:64 s.f.135 s.f.135 s.f.
Net to Usable SF Factor
Public Works USF Needed
2.60 Code Enforcement
Part-time Employee Wk Stn -56 s.f.56 s.f.
Code Enforcement Net Area Total:0 s.f.56 s.f.56 s.f.
Net to Usable SF Factor
Code Enforcement USF Needed
2.70 Finance
Finance Director --145 s.f.
Deputy Clerk/Accountant Joe Rotz 64 s.f.56 s.f.56 s.f.
Accountant --56 s.f.
Utility Billing Employee --56 s.f.
Finance Net Area Total:64 s.f.56 s.f.313 s.f.
Net to Usable SF Factor
Finance USF Needed
3.00 POLICE
3.10 Police Administration
Public Lobby 60 s.f.60 s.f.300 s.f.
Police Reception Work Area Paula Steelman 145 s.f.150 s.f.240 s.f.
Copy/Work Area 80 s.f.64 s.f.120 s.f.
Supplies/File Storage --80 s.f.
Public Safety Director Matt Cottschalk 230 s.f.220 s.f.230 s.f.
Police Lieutenant Ryan Burns 100 s.f.180 s.f.150 s.f.
Community Service Officer Space -80 s.f.64 s.f.
Interview/Safe Room -150 s.f.180 s.f.
Conf/Secure Interview Room -80 s.f.80 s.f.
Conference Room (14-15)--300 s.f.
s:/Ci-Stillwater/Police/122219/Stillwater Police Space Program.xlsx Comm. No. 182066
City of Corcoran
Space Needs and Facility Analysis
September 13, 2018
Space Program Summary
Existing
Building
Program
Proposed
Program
Phase 1
Proposed
Program
Phase 2
Police Administration Net Area Total:615 s.f.984 s.f.1,744 s.f.
Net to Usable SF Factor x 1.40
Police Administration USF Needed 2,442 s.f.
3.20 Investigations
Drug Taskforce Agent --100 s.f.
Detective (& Case MGMT & Drug Taskforce in short/midterm)-120 s.f.100 s.f.
Detective --100 s.f.
Forensic Office --100 s.f.
Case Management Room --150 s.f.
Investigations Net Area Total:0 s.f.120 s.f.550 s.f.
Net to Usable SF Factor x 1.40
Investigations USF Needed 770 s.f.
3.30 Patrol
Squad Room (Combined w/ EOC)190 s.f.-360 s.f.
Report Writing Room (Combined w/ EOC)--180 s.f.
Reserves Equipment -25 s.f.140 s.f.
Patrol Sergeant Office (Shared by 2)--140 s.f.
Patrol Net Area Total:190 s.f.25 s.f.820 s.f.
Net to Usable SF Factor x 1.40
Patrol USF Needed 1,148 s.f.
3.40 Booking
Vehicle Sally Port --600 s.f.
Booking / Intoxilizer 80 s.f.80 s.f.240 s.f.
Holding Cells (2)--160 s.f.
Booking Net Area Total:80 s.f.80 s.f.1,000 s.f.
Net to Usable SF Factor x 1.40
Booking USF Needed 1,400 s.f.
3.50 Evidence
Evidence Storage Room 100 s.f.110 s.f.800 s.f.
Evidence Processing -100 s.f.100 s.f.
Crime Lab --200 s.f.
Technology Evidence Room 100 s.f.
Evidence Net Area Total:100 s.f.210 s.f.1,200 s.f.
Net to Usable SF Factor x 1.40
Evidence USF Needed 1,680 s.f.
3.60 Police Support Spaces
EOC 370 s.f.425 s.f.400 s.f.
Training Room --600 s.f.
Equipment Room --250 s.f.
Armory/Ammo Storage --80 s.f.
Weapon Cleaning 50 s.f.50 s.f.110 s.f.
Lockers/Changing 80 s.f.170 s.f.750 s.f.
Police Toilet/Shower 70 s.f.70 s.f.
Fitness Facility --600 s.f.
Quiet Room --80 s.f.
Lunchroom --250 s.f.
Police Support Spaces Net Area Total:500 s.f.715 s.f.3,190 s.f.
Net to Usable SF Factor x 1.40
Police Support Spaces USF Needed 4,466 s.f.
3.70 Police Squad Garage
Vehicle Storage 840 s.f.840 s.f.2,000 s.f.
Squad Supplies 130 s.f.130 s.f.130 s.f.
Specialty Vehicle Storage --2,260 s.f.
s:/Ci-Stillwater/Police/122219/Stillwater Police Space Program.xlsx Comm. No. 182066
City of Corcoran
Space Needs and Facility Analysis
September 13, 2018
Space Program Summary
Existing
Building
Program
Proposed
Program
Phase 1
Proposed
Program
Phase 2
Evidence Vehicle Storage --500 s.f.
K9 Unit Kennel --100 s.f.
Police Squad Garage Net Area Total:970 s.f.970 s.f.4,990 s.f.
Net to Usable SF Factor x 2.25
Police Squad Garage USF Needed 11,228 s.f.
4.00 Ambulance
Ambulance Lounge 175 s.f.120 s.f.175 s.f.
Ambulace Toilet/Shower 70 s.f.-70 s.f.
Ambulance Net Area Total:245 s.f.120 s.f.245 s.f.
Net to Usable SF Factor
Ambulance USF Needed
s:/Ci-Stillwater/Police/122219/Stillwater Police Space Program.xlsx Comm. No. 182066
City of Corcoran
Space Needs and Facility Analysis
September 13, 2018
Page 18 Commission No. 182066
OPTIONS ANALYSIS
The Space Needs Committee reviewed several rounds of options. Diagrams for these options are included
with the meeting minutes in Appendix A of this report. Key features of these options, as well as the
rationale behind their elimination are listed below:
• Additions to the existing Police Department to meet long-term space needs. This option is not
recommended as the site is constrained on the south side by an existing septic field.
• Conversion of the police department garage to other Police Department functions to meet mid-term
space needs. This option is not recommended as the it would require a complicated renovation as
well as construction of a new police garage that would face the same space constraints mentioned
previously.
• A three-phase project approach. This option is not recommended as it would be inefficient from a
budget standpoint and would subject stakeholders to prolonged construction.
Additional information about the options reviewed and feedback given by the committee can be found in
the meeting minutes included in Appendix A of this report.
City of Corcoran
Space Needs and Facility Analysis
September 13, 2018
Page 19 Commission No. 182066
RECOMMENDATION
The Space Needs Committee was formed to objectively review space needs and facility options of the
current Corcoran City Hall and Police Station facility. The committee held six meetings over the course of
several months. Wold Architects and Engineers facilitated these meetings to aid in developing goals,
review spatial and maintenance deficiencies of the existing facility, and study future space use options.
The Space Needs Committee recommendation is based on the following rationale:
1. The existing facility is undersized and lacking in essential resources for current Police Department
functions, posing security risks and liabilities for all facility stakeholders.
2. Similarities between the space needs for the Council Chamber and Community Room allow these
functions to be combined.
3. A remodeling project better aligns with mid-term funding resources.
4. Expanding Police Department functions into the City Hall side of the facility could address some
Police Department space needs in the mid-term without the need for construction of additions or a
new facility.
5. Long-term City Hall space needs and staffing projections will fill the existing City Hall/Police
Department facility.
6. Due to the specialized nature of police facilities, the existing building is better suited to City Hall
functions in the long term.
7. Mid-term modifications should incorporate into the long-term use of the existing facility.
Based on the reasons above, the Space Needs Committee recommends the following:
1. Phase 1:
a. A remodeling project of the existing facility addressing current deficiencies by the following
measures:
i. Relocate the Council Chamber, combining it with the Community Room to free
space for other functions in the facility.
ii. Expand City Hall functions into the existing Council Chamber.
iii. Expand Police Department functions into the City Hall side of the facility while
maintaining a clear lockdown point between the two functions.
2. Phase 2:
a. A new Police Department facility at either an adjacent or remote site to the existing facility.
b. A remodeling project which converts the entire existing facility to City Hall functions.
City of Corcoran
Space Needs and Facility Analysis
September 13, 2018
Page 20 Commission No. 182066
RECOMMENDATION ANALYSIS
The Space Needs Committee developed its recommendation through discussions around floor plan
diagrams developed by Wold in conjunction with the space program included in this report. A final draft
of the diagrams are included in the following pages. Included with these diagrams is a floor plan
documentation of the existing facility based on existing drawings, site observations, and staff interviews
conducted by Wold.
VE
H
I
C
L
E
ST
O
R
A
G
E
(8
0
0
S
F
)
AM
B
U
L
A
N
C
E
LO
U
N
G
E
(1
7
5
S
F
)
AM
B
U
L
A
N
C
E
TO
I
L
E
T
(7
0
S
F
)
ME
C
H
(5
0
S
F
)
EO
C
(3
7
0
S
F
)
CO
P
Y
(8
0
S
F
)
PO
L
I
C
E
LI
E
U
T
E
N
A
N
T
(1
0
0
S
F
)
BO
O
K
I
N
G
/
IN
T
O
X
I
L
I
Z
E
R
(8
0
S
F
)
PU
B
L
I
C
S
A
F
E
T
Y
DI
R
E
C
T
O
R
(2
3
0
S
F
)
PU
B
L
I
C
LO
B
B
Y
(6
0
S
F
)
PO
L
I
C
E
RE
C
E
P
T
I
O
N
(1
3
5
S
F
)
PU
B
L
I
C
WO
R
K
S
DI
R
E
C
T
O
R
(6
4
S
F
)
TO
I
L
E
T
(6
4
S
F
)
SQ
U
A
D
RO
O
M
(1
9
0
S
F
)
CH
A
N
G
I
N
G
RO
O
M
(8
0
S
F
)
EV
I
D
E
N
C
E
ST
O
R
A
G
E
(1
0
0
S
F
)
CI
T
Y
AD
M
I
N
I
S
T
R
A
T
O
R
(2
3
0
S
F
)
ME
C
H
(1
0
5
S
F
)
ST
O
R
(1
7
5
S
F
)
KI
T
C
H
E
N
E
T
T
E
(8
0
S
F
)
CO
P
Y
(1
3
5
S
F
)
CI
T
Y
CL
E
R
K
(1
8
0
S
F
)
CO
U
N
C
I
L
CH
A
M
B
E
R
S
(8
6
5
S
F
)
RE
C
E
P
T
I
O
N
(2
7
0
S
F
)
LO
B
B
Y
(9
2
0
S
F
)
JAN (15 SF)MEN'S TOILET (170 SF)WOMEN'S TOILET (200 SF)COATS (130 SF)CONFERENCE (360 SF)TABLE STOR (180 SF)KITCHEN (235 SF)COMMUNITY ROOM (2,140 SF)STOR (140 SF)MECH (140 SF)
AC
C
O
U
N
T
A
N
T
(6
4
S
F
)
DR
O
P
-
I
N
(6
4
S
F
)
ZO
N
I
N
G
/
CO
D
E
C
O
M
P
L
I
A
N
C
E
/
BU
I
L
D
I
N
G
IN
S
P
E
C
T
I
O
N
S
(6
4
S
F
)
PL
A
N
N
I
N
G
(6
4
S
F
)
AD
M
I
N
I
S
T
R
A
T
I
V
E
AS
S
I
S
T
A
N
T
(6
4
S
F
)
AD
D
R
E
S
S
F
I
L
E
S
(2
5
S
F
)
SQ
U
A
D
SU
P
P
L
I
E
S
(1
3
0
S
F
)
EX
I
S
T
I
N
G
F
L
O
O
R
P
L
A
N
EX
I
S
T
I
N
G
P
O
L
I
C
E
D
E
P
A
R
T
M
E
N
T
S
P
A
C
E
S
EX
I
S
T
I
N
G
C
I
T
Y
H
A
L
L
S
P
A
C
E
S
CO
L
O
R
K
E
Y
MA
I
N
EN
T
R
Y
C:
\
U
s
e
r
s
\
d
g
a
l
l
a
g
h
e
r
\
D
o
c
u
m
e
n
t
s
\
C
o
r
c
o
r
a
n
C
i
t
y
H
a
l
l
&
Po
l
i
c
e
(
C
e
n
t
r
a
l
)
_
d
g
a
l
l
a
g
h
e
r
.
r
v
t
9/
6
/
2
0
1
8
1
2
:
1
1
:
5
6
P
M
City of Corcoran Space Needs and Facility Analysis September 13, 2018 Comm No: 182066
\\
W
a
e
-
s
r
v
-
m
n
.
w
o
l
d
a
e
.
c
o
m
\
S
t
P
a
u
l
\
C
I
-
C
o
r
c
o
r
a
n
\
C
i
t
y
H
a
l
l-
P
o
l
i
c
e
\
C
o
r
c
o
r
a
n
C
i
t
y
H
a
l
l
&
P
o
l
i
c
e
(
C
e
n
t
r
a
l
)
.
r
v
t
EXISTING
Pa
g
e
2
1
VE
H
I
C
L
E
ST
O
R
A
G
E
(8
0
0
S
F
)
SQ
U
A
D
SU
P
P
L
I
E
S
(1
3
0
S
F
)
PO
L
I
C
E
LO
C
K
E
R
S
(1
7
0
S
F
)
PO
L
I
C
E
TO
I
L
E
T
(7
0
S
F
)
ME
C
H
(5
0
S
F
)
EO
C
/
S
Q
U
A
D
/
RE
P
O
R
T
R
O
O
M
(4
2
5
S
F
)
PO
L
I
C
E
LI
E
U
T
E
N
A
N
T
(1
8
0
S
F
)
BO
O
K
I
N
G
/
IN
T
O
X
I
L
I
Z
E
R
(8
0
S
F
)
PU
B
L
I
C
LO
B
B
Y
(6
0
S
F
)
PO
L
I
C
E
RE
C
E
P
T
I
O
N
(1
5
0
S
F
)
TO
I
L
E
T
(6
4
S
F
)
ST
O
R
/
AD
D
R
E
S
S
FI
L
E
S
(2
0
0
S
F
)
CI
T
Y
AD
M
I
N
I
S
T
R
A
T
O
R
(1
8
0
S
F
)
ME
C
H
(1
0
5
S
F
)
LU
N
C
H
A
R
E
A
(1
4
0
S
F
)
JAN (15 SF)MEN'S TOILET RENOVATIONS (170 SF)WOMEN'S TOILET RENOVATIONS (200 SF)CONFERENCE (190 SF)TABLE STOR (180 SF)KITCHEN (235 SF)COUNCIL CHAMBERS/COMMUNITY ROOM (2,140 SF)ELECTIONS STORAGE (140 SF)MECH (140 SF)
IN
T
E
R
V
I
E
W
/
SA
F
E
R
O
O
M
(1
5
0
S
F
)
CO
P
Y
/
WK
R
M
(6
4
S
F
)
CO
N
F
/
SE
C
U
R
E
IN
T
E
R
V
I
E
W
RO
O
M
(8
0
S
F
)
EV
I
D
E
N
C
E
PR
O
C
E
S
S
I
N
G
(1
0
0
S
F
)
EV
I
D
E
N
C
E
ST
O
R
A
G
E
(1
9
0
S
F
)
LO
B
B
Y
(6
2
0
S
F
)
PU
B
L
I
C
SA
F
E
T
Y
DI
R
E
C
T
O
R
(2
2
0
S
F
)
CO
N
F
E
R
E
N
C
E
(2
5
0
S
F
)
WK
S
T
N
(5
6
S
F
)
WK
S
T
N
(5
6
S
F
)
WK
S
T
N
(5
6
S
F
)
RE
S
E
R
V
E
S
EQ
U
I
P
(2
5
S
F
)
CS
O
/
RE
S
E
R
V
E
S
AR
E
A
(8
0
S
F
)
DEMOUNTABLE DAIS AND PLATFORM
WK
S
T
N
(5
6
S
F
)
DE
T
E
C
T
I
V
E
/
CA
S
E
M
G
M
T
/
DR
U
G
TA
S
K
F
O
R
C
E
(1
2
0
S
F
)
UNLABELED WORKSTATIONS (9):-ACCOUNTANT -BUILDING INSPECTIONS -CITY PLANNER -CODE COMPLIANCE -DROP-IN -DROP-IN -RECREATION COORDINATOR -UTILITY BILLING -ZONING/BUILDING INSPECTIONS
CO
P
Y
/
WK
R
M
(1
3
5
S
F
)
WK
S
T
N
(5
6
S
F
)
WK
S
T
N
(5
6
S
F
)
WK
S
T
N
(5
6
S
F
)
WK
S
T
N
(5
6
S
F
)
AS
S
I
S
T
A
N
T
C
I
T
Y
AD
M
I
N
I
S
T
R
A
T
O
R
(1
4
0
S
F
)
(2
)
C
O
N
T
R
A
C
T
(5
0
S
F
)
PU
B
L
I
C
WO
R
K
S
DI
R
E
C
T
O
R
(1
3
5
S
F
)
CI
T
Y
CL
E
R
K
(1
4
0
S
F
)
QU
I
E
T
RO
O
M
(6
0
S
F
)
AD
M
I
N
I
S
T
R
A
T
I
V
E
AS
S
I
S
T
A
N
T
(5
6
S
F
)
PA
R
T
-
T
I
M
E
A
D
M
I
N
AS
S
I
S
T
A
N
T
(2
5
S
F
)
(1
)
C
O
N
T
R
A
C
T
(2
5
S
F
)
WE
A
P
O
N
S
CL
E
A
N
I
N
G
(5
0
S
F
)
WK
S
T
N
(5
6
S
F
)
AMBULANCE LOUNGE (120 SF)COATS (70 SF)A/V EQUIP ROOM (60 SF)
PR
O
P
O
S
E
D
F
L
O
O
R
P
L
A
N
-
P
H
A
S
E
1
EX
I
S
T
I
N
G
A
N
D
/
O
R
R
E
P
R
O
G
R
A
M
M
E
D
P
O
L
I
C
E
DE
P
A
R
T
M
E
N
T
S
P
A
C
E
S
R
E
Q
U
I
R
I
N
G
N
O
C
O
N
S
T
R
U
C
T
I
O
N
EX
I
S
T
I
N
G
A
N
D
/
O
R
R
E
P
R
O
G
R
A
M
M
E
D
C
I
T
Y
H
A
L
L
SP
A
C
E
S
R
E
Q
U
I
R
I
N
G
N
O
C
O
N
S
T
R
U
C
T
I
O
N
CO
L
O
R
K
E
Y
RE
N
O
V
A
T
E
D
P
O
L
I
C
E
D
E
P
A
R
T
M
E
N
T
SP
A
C
E
S
O
R
N
E
W
F
U
R
N
I
S
H
I
N
G
S
RE
N
O
V
A
T
E
D
C
I
T
Y
H
A
L
L
S
P
A
C
E
S
OR
N
E
W
F
U
R
N
I
S
H
I
N
G
S
MA
I
N
EN
T
R
Y
C:
\
U
s
e
r
s
\
d
g
a
l
l
a
g
h
e
r
\
D
o
c
u
m
e
n
t
s
\
C
o
r
c
o
r
a
n
C
i
t
y
H
a
l
l
&
Po
l
i
c
e
(
C
e
n
t
r
a
l
)
_
d
g
a
l
l
a
g
h
e
r
.
r
v
t
9/
6
/
2
0
1
8
1
2
:
1
1
:
5
7
P
M
City of Corcoran Space Needs and Facility Analysis September 13, 2018 Comm No: 182066
\\
W
a
e
-
s
r
v
-
m
n
.
w
o
l
d
a
e
.
c
o
m
\
S
t
P
a
u
l
\
C
I
-
C
o
r
c
o
r
a
n
\
C
i
t
y
H
a
l
l-
P
o
l
i
c
e
\
C
o
r
c
o
r
a
n
C
i
t
y
H
a
l
l
&
P
o
l
i
c
e
(
C
e
n
t
r
a
l
)
.
r
v
t
PHASE 1
Pa
g
e
2
2
ST
O
R
/
AD
D
R
E
S
S
FI
L
E
S
(2
0
0
S
F
)
ME
C
H
(1
0
5
S
F
)
BR
E
A
K
RO
O
M
(3
4
0
S
F
)
JAN (15 SF)MEN'S TOILET (170 SF)WOMEN'S TOILET (200 SF)COATS (70 SF)CONFERENCE (360 SF)TABLE STOR (180 SF)KITCHEN (235 SF)COUNCIL CHAMBERS/COMMUNITY ROOM (2,140 SF)DAIS STORAGE (140 SF)MECH (140 SF)
LO
B
B
Y
(6
2
0
S
F
)
CO
N
F
E
R
E
N
C
E
(2
5
0
S
F
)
AD
M
I
N
I
S
T
R
A
T
I
V
E
AS
S
I
S
T
A
N
T
(5
6
S
F
)
WK
S
T
N
(5
6
S
F
)
WK
S
T
N
(5
6
S
F
)
WK
S
T
N
(5
6
S
F
)
PA
R
T
-
T
I
M
E
A
D
M
I
N
AS
S
I
S
T
A
N
T
(2
5
S
F
)
AM
B
U
L
A
N
C
E
LO
U
N
G
E
(1
7
5
S
F
)
DEMOUNTABLE DAIS AND PLATFORM
(2
)
C
O
N
T
R
A
C
T
(5
0
S
F
)
WK
S
T
N
(5
6
S
F
)
CO
P
Y
/
WO
R
K
AR
E
A
(6
0
S
F
)
WK
S
T
N
(5
6
S
F
)
WK
S
T
N
(5
6
S
F
)
WK
S
T
N
(5
6
S
F
)
WK
S
T
N
(5
6
S
F
)
WK
S
T
N
(5
6
S
F
)
A/V EQUIP ROOM (60 SF)
AD
M
I
N
SE
R
V
I
C
E
S
DI
R
E
C
T
O
R
(1
4
0
S
F
)
CO
M
M
D
E
V
CO
O
R
D
I
N
A
T
O
R
(1
2
0
S
F
)
EL
E
C
T
I
O
N
S
ST
O
R
(1
9
0
S
F
)
CO
N
F
E
R
E
N
C
E
(3
8
0
S
F
)
SU
P
P
L
I
E
S
(1
0
0
S
F
)
FI
N
A
N
C
E
DI
R
E
C
T
O
R
(1
5
0
S
F
)
WK
S
T
N
(5
6
S
F
)
WK
S
T
N
(5
6
S
F
)
UNLABELED WORKSTATIONS (11):-ACCOUNTANT -ACCOUNTANT -BUILDING INSPECTIONS -CITY PLANNER -CODE COMPLIANCE -DROP-IN -DROP-IN -MANAGEMENT ANALYSIS -RECREATION COORDINATOR -UTILITY BILLING -ZONING/BUILDING INSPECTIONS
AS
S
I
S
T
A
N
T
C
I
T
Y
AD
M
I
N
I
S
T
R
A
T
O
R
(1
8
0
S
F
)
(1
)
C
O
N
T
R
A
C
T
(2
5
S
F
)
CI
T
Y
AD
M
I
N
I
S
T
R
A
T
O
R
(1
8
0
S
F
)
PU
B
L
I
C
WO
R
K
S
DI
R
E
C
T
O
R
(1
3
5
S
F
)
CI
T
Y
CL
E
R
K
(1
4
0
S
F
)
AM
B
U
L
A
N
C
E
TO
I
L
E
T
(7
0
S
F
)
EQ
U
I
P
M
E
N
T
LO
C
K
E
R
S
(8
0
S
F
)
CI
T
Y
V
E
H
I
C
L
E
/
MI
S
C
S
T
O
R
A
G
E
(1
,
2
5
0
S
F
)
OT
H
E
R
C
O
N
S
T
R
U
C
T
I
O
N
:
NE
W
P
O
L
I
C
E
S
T
A
T
I
O
N
2
8
,
0
0
0
S
F
ME
C
H
(5
0
S
F
)
TO
I
L
E
T
(6
4
S
F
)
QU
I
E
T
RO
O
M
(6
4
S
F
)
CO
N
F
E
R
E
N
C
E
(8
0
S
F
)
EX
I
T
VE
S
T
(6
0
S
F
)
PR
O
P
O
S
E
D
F
L
O
O
R
P
L
A
N
-
P
H
A
S
E
2
EX
I
S
T
I
N
G
A
N
D
/
O
R
R
E
P
R
O
G
R
A
M
M
E
D
C
I
T
Y
H
A
L
L
S
P
A
C
E
S
RE
Q
U
I
R
I
N
G
N
O
C
O
N
S
T
R
U
C
T
I
O
N
CO
L
O
R
K
E
Y
RE
N
O
V
A
T
E
D
C
I
T
Y
H
A
L
L
S
P
A
C
E
S
OR
N
E
W
F
U
R
N
I
S
H
I
N
G
S
MA
I
N
EN
T
R
Y
C:
\
U
s
e
r
s
\
d
g
a
l
l
a
g
h
e
r
\
D
o
c
u
m
e
n
t
s
\
C
o
r
c
o
r
a
n
C
i
t
y
H
a
l
l
&
Po
l
i
c
e
(
C
e
n
t
r
a
l
)
_
d
g
a
l
l
a
g
h
e
r
.
r
v
t
9/
6
/
2
0
1
8
1
2
:
1
1
:
5
7
P
M
City of Corcoran Space Needs and Facility Analysis September 13, 2018 Comm No: 182066
\\
W
a
e
-
s
r
v
-
m
n
.
w
o
l
d
a
e
.
c
o
m
\
S
t
P
a
u
l
\
C
I
-
C
o
r
c
o
r
a
n
\
C
i
t
y
H
a
l
l-
P
o
l
i
c
e
\
C
o
r
c
o
r
a
n
C
i
t
y
H
a
l
l
&
P
o
l
i
c
e
(
C
e
n
t
r
a
l
)
.
r
v
t
PHASE 2
Pa
g
e
2
3
City of Corcoran
Space Needs and Facility Analysis
September 13, 2018
Page 24 Commission No. 182066
BUDGET PROJECTIONS
The Space Needs Committee reviewed budget projections developed by Wold. An explanation of how
these budgets were produced follows below. The complete report is included in the following pages.
Budget information reflects the two recommended project phases. Project total costs are given for each
phase followed by the projected cost over a range of potential construction years accounting for inflation.
These projections are intended as tools to assist in establishing funding goals for future projects, rather
than detailed project estimates. Projects will undergo a rigorous estimation process during project design
phases should the City proceed with them.
Renovations and New Construction
Renovation of the existing building is projected on a cost per square foot basis. This includes costs for
selective demolition, new construction, mechanical and electrical modifications resulting from new
construction, and security upgrades. Low and high cost projections are provided for renovations as this
type of project is inherently less predictable than new construction. The new building construction cost for
the proposed new Police Station was generated using the required square footage identified in the
Proposed Building Program along with a square foot cost based on recent new police station projects
designed by Wold.
Deferred Maintenance
These costs are broken out as a separate line item for each phase. These represent building systems
upgrades and building maintenance costs identified and recommended by the Facility Analysis included
in this report.
Miscellaneous Project Costs
This multiplier represents additional costs incurred outside of the cost of construction. This includes
design fees, contractor fees, testing fees, permit fees, and contingency. Phase 2 miscellaneous costs also
include furniture and equipment for both the new police station and the renovations to City Hall.
Furniture
Phase 1 includes a significant redesign of the open office in City Hall as well as a number of new and
reconfigured private offices. New furniture will be required to accommodate more compact workspaces
throughout. As there is a significant furniture package required for Phase 1, it is represented by a separate
line item in the budget projection. Furnishing costs for Phase 2 are included in Miscellaneous Project Costs.
City of Corcoran
Space Needs and Facility Analysis
September 13, 2018
1.0 Phase 1
1.1 City Hall Renovations LowHigh
Light Renovations 3,600 s.f.x $ 60 /s.f. - $ 80 /s.f. $ 216,000 $ 288,000
Medium Renovations 2,100 s.f.x $ 90 /s.f. - $ 110 /s.f. $ 189,000 $ 231,000
Heavy Renovations 980 s.f.x $ 120 /s.f. - $ 140 /s.f. $ 118,000 $ 137,000
Deferred Maintenance -------------- $ 182,000 $ 182,000
Subtotal 705,000$ 838,000$
Miscellaneous Project Costs25% $ 176,000 $ 210,000
Furniture 120,000$ 120,000$
Project Total Cost (2019 Midpoint of Construction)1,001,000$ 1,168,000$
LowHigh
1,041,000$ 1,215,000$
Projected Budget with an Average Annual 1,083,000$ 1,264,000$
Construction Inflation Rate of 4%1,126,000$ 1,315,000$
1,171,000$ 1,368,000$
1,218,000$ 1,423,000$
2.0 Phase 2
2.1 New Police Station
New Building Construction Cost 28,000 s.f.x $ 275 -- 7,700,000$
Miscellaneous Project Costs35% -- 2,695,000$
Project Total Cost (2019 Midpoint of Construction) -- 10,395,000$
-- 10,811,000$
-- 11,243,000$
-- 11,693,000$
-- 12,161,000$
-- 12,647,000$
Projected Budget with an Average Annual -- 13,153,000$
Construction Inflation Rate of 4% -- 13,679,000$
-- 14,226,000$
-- 14,795,000$
-- 15,387,000$
2.2 City Hall Renovations LowHigh
Light Renovations 800 s.f.x $ 60 /s.f. - $ 80 /s.f. $ 48,000 64,000$
Medium Renovations 800 s.f.x $ 90 /s.f. - $ 110 /s.f. $ 72,000 88,000$
Heavy Renovations 130 s.f.x $ 120 /s.f. - $ 140 /s.f. $ 16,000 18,000$
Deferred Maintenance -------------- $ 107,000 107,000$
Subtotal 243,000$ 277,000$
Miscellaneous Project Costs35%85,000$ 97,000$
Project Total Cost (2019 Midpoint of Construction)328,000$ 374,000$
LowHigh
341,000$ 389,000$
355,000$ 405,000$
369,000$ 421,000$
384,000$ 438,000$
399,000$ 456,000$
415,000$ 474,000$
Projected Budget with an Average Annual 432,000$ 493,000$
Construction Inflation Rate of 4%449,000$ 513,000$
467,000$ 534,000$
486,000$ 555,000$
505,000$ 577,000$
2025
Projected Budget
2028
2020
2030
2026
2027
2020
2021
2022
2023
2024
2026
2027
2029
Year at Midpoint
2021
of Construction
of Construction
Year at Midpoint
2020
of Construction
2025
LowHigh
LowHigh
Projected Budget
2022
2023
2024
2028
2029
2021
2022
2023
2024
Year at Midpoint
Projected Budget
s:/Ci-Stillwater/Police/122219/Stillwater Police Space Program.xlsx Page 25 Comm. No. 182066
City of Corcoran
Space Needs and Facility Analysis
September 13, 2018
Page 26 Commission No. 182066
APPENDIX A – MEETING MINUTES
MEMORANDUM
To: Attendees
From: Derek Gallagher | DG
Date: February 9, 2018
Comm. No: 9999
Subject: City of Corcoran
Space Needs Study Kick-Off Meeting
February 7, 2018 Meeting Minutes
bmartens@ci.corcoran.mn.us
jbeise@ci.corcoran.mn.us
kmattson@ci.corcoran.mn.us
mgottschalk@ci.corcoran.mn.us
jdunning@woldae.com
Attendees:
Brad Martens, City of Corcoran
Jessica Beise, City of Corcoran
Kevin Mattson, City of Corcoran
Matt Gottschalk, City of Corcoran
Joel Dunning, Wold Architects and Engineers
Derek Gallagher, Wold Architects and Engineers dgallagher@woldae.com
The Core Group from the City of Corcoran met with Wold to discuss the Space Needs Study process and
establish preliminary guiding principles.
Discussion Topics:
A.Wold introduced the Space Needs Study Process.
1.Tasks:
a.Organizational Meeting
b.Tour Similar Facilities (Optional)
c.Analysis of Current and Future Requirements
d.Analysis of Existing Buildings
e.Creation of a Square Footage Program
f.Options Analysis
g.Gain Approvals
2.Phases:
a.Needs Assessment (One month Timeframe):
1)Finding Facts – Projection and Needs Determination
2)Review of Resources – Condition of Facilities
3)Criteria – Planning for an Ideal Operational Model
b.Options Development (Timeframe determined by Core Group)
MEMORANDUM
Page 2 of 3
3. Role of the Core Group:
a. High Level Collaboration – Involve all stakeholders.
b. Inclusive Planning Process – Planning needs room by room.
c. Ownership of Decisions – Addressing functional and operational needs.
d. The group will be tasked with consensus building and identifying wants versus
needs.
e. Establishing Guiding Principles: The primary goals and objectives of the project.
4. The Facility Analysis Process explores conditions and deficiencies in the following
areas:
a. Site
b. Exterior
c. Interior
d. Accessibility
e. Life Safety
f. Hazardous Materials
g. Mechanical Systems
h. Electrical Systems
i. Space Summary
j. Technology
k. Expandability
B. The group reviewed a number of example projects to foster conversation about Guiding
Principles:
1. Cottage Grove City Hall/Police
2. Richfield City Hall/Police/Fire
3. River Falls Police
C. In addition to the City’s established Mission Statement, Vision Statement, and Values
Statements, the group discussed a preliminary list of Guiding Principles:
1. Reinforce role as the ‘Gateway to Town Center’.
2. Highlight rural/natural setting.
3. Balance rural character with the needs of a growing community.
4. Prioritize staff approachability but not at the expense of safety.
5. Consider long-term goals with any short-term solutions to space needs.
6. Provide modern staff support spaces.
7. Encourage interaction between departments.
8. Technological efficiency.
9. Provide functional EOC services/facility for community.
10. Address changing support at the county level.
11. Providing facilities for community use (i.e. a community room) was discussed. The
group will discuss this with other stakeholders to determine whether this is an
ongoing priority.
D. The group discussed a number of items that could become Criteria later in the process:
1. Meet the needs of a staff that is projected to grow by an average of one full time
employee per year.
2. Indoor parking facilities are a long-term priority.
3. Expanded evidence storage.
MEMORANDUM
Page 3 of 3
4. Police locker and changing facilities.
5. Improve flow and efficiency for interface between police department and the public.
6. Police interview spaces.
7. Provide city staff support spaces.
8. Security improvements for city administration facilities.
9. Long-term solution to storage deficiency (Expanded, offsite, or digital archives).
10. Balance space sizes with needs of users (e.g. office sizes).
11. Joel explained that some facility improvements such as improved accessibility, life
safety upgrades, lactation rooms, energy efficiency etc. would be required by building
code or OSHA. Wold can provide guidance in planning for these items.
E. The group determined that touring other facilities in the area would be beneficial.
F. Next Steps:
1. Wednesday, February 14, 2018, 1:00 p.m. – Wold will conduct walk-throughs with the
City Staff and Police Departments and gather programming information.
2. Wednesday, February 28, 2018 – Core Group Meeting.
3. Wold will facilitate a time for the engineering team to meet with Public Works
supervisor.
4. Wold will determine appropriate facilities for the group to tour in early March.
cc: Andrew Dahlquist, Wold
CM/MN/Promo/CI_Corcoran/min/2.7.18
MEMORANDUM
To: Attendees
From: Derek Gallagher | DG
Date: February 20, 2018
Revised February 21, 2018
Comm. No: 9999
Subject: City of Corcoran
Space Needs Committee Programming Meeting
February 14, 2018 Meeting Minutes
bmartens@ci.corcoran.mn.us
jbeise@ci.corcoran.mn.us
mgottschalk@ci.corcoran.mn.us
jdunning@woldae.com
Attendees:
Brad Martens, City of Corcoran
Jessica Beise, City of Corcoran
Matt Gottschalk, City of Corcoran
Joel Dunning, Wold Architects and Engineers
Derek Gallagher, Wold Architects and Engineers dgallagher@woldae.com
Representatives from the City of Corcoran met with Wold to tour the City Hall/Police facility and
discuss existing space uses and needs.
Discussion Topics:
A.Police Department
1.The group toured the police department. Wold documented the existing spaces and
determined current program usage.
2.Short and mid-term needs/changes (1-3 years):
a.The Public Works Director is currently housed in the Police Department. The
recently hired Detective will require this office space.
b.More Evidence Storage.
c.Evidence Processing space.
d.Private Locker/Changing Room.
e.Shower adjacent to Changing Room.
f.Garage is short by two (2) stalls for current vehicle fleet.
g.Kennel Space for K9 Unit.
h.Interview Room off Lobby.
i.Community Service Officers space (storage and small workspace).
3.Mid-term Needs/Changes (3-5 years):
a.Adding a Drug Task Force Agent.
b.Case Management Room.
MEMORANDUM
Page 2 of 3
c. One (1) additional Full-time Police Officer.
d. Large Conference Room for 15-20 people quarterly meetings.
e. Dedicated Equipment Room.
f. Lunchroom.
g. Plan for three to five (3-5) additional part-time Patrol Officers.
h. Plan for two (2) additional full-time Patrol Officers.
4. Long-term Needs/Changes (5+ years):
a. Space for three (3) full-time employees at front counter.
b. Office space for two (2) full-time Patrol Sergeants.
c. Sally port.
d. Two (2) Holding Cells.
e. Crime Lab space (depending on changes at county level).
f. Locker Room with properly sized lockers.
g. Armory with space for weapon cleaning/maintenance.
h. Space for extended fleet currently housed at Public Works.
i. Training Room.
j. Fitness Facility.
B. City Hall
1. The group toured City Hall. Wold documented the existing spaces and determined
current program usage.
2. Short and mid-term needs/changes (1-3 years):
a. Space for Public Works Director (moving from Police Department).
b. Adding part-time code enforcement employee.
c. Reconfigure permanent record storage and plan for additional future storage.
d. Another Conference Room.
e. Panic button at front desk.
f. Quiet Room.
g. It was noted that some workstations could be located in the reception area if
security is addressed.
h. A small window for reception to provide more direct customer service to public.
i. It was noted that more functions could be shifted to open office configurations.
j. Accessibility improvements.
k. Security improvements to Dias.
l. Adding Recreation Coordinator.
3. Mid-term Needs/Changes (3-5 years):
a. Adding City Planner.
b. Adding Utility Billing employee.
c. Adding part-time Administrative Assistant.
4. Long-term Needs/Changes (5+ years):
a. Adding Administrative Services Director.
b. Adding part-time Management Analysis employee.
c. Adding Community Development Coordinator.
d. Additional A/V Equipment in City Council Chambers.
e. Staff Lunchroom.
MEMORANDUM
Page 3 of 3
C. Next Steps:
1. The Space Needs Committee will meet on Wednesday, February 28, 2018 to review the
existing program and discuss future needs.
cc: Kevin Mattson, City of Corcoran kmattson@ci.corcoran.mn.us
Andrew Dahlquist, Wold adahlquist@woldae.com
MF/Promo/CI_Corcoran/min/2.14.18
MEMORANDUM
To: Attendees
From: Derek Gallagher | DG
Date: March 6, 2018
Comm. No: 9999
Subject: City of Corcoran
Space Needs Committee Programming Meeting
February 28, 2018 Meeting Minutes
bmartens@ci.corcoran.mn.us
jbeise@ci.corcoran.mn.us
mgottschalk@ci.corcoran.mn.us
kmattson@ci.corcoran.mn.us
jdunning@woldae.com
Attendees:
Brad Martens, City of Corcoran
Jessica Beise, City of Corcoran
Matt Gottschalk, City of Corcoran
Kevin Mattson, City of Corcoran
Joel Dunning, Wold Architects and Engineers
Derek Gallagher, Wold Architects and Engineers dgallagher@woldae.com
Representatives from the City of Corcoran met with Wold to tour the City Hall/Police facility and
discuss existing space uses and needs.
Discussion Topics:
A.The group discussed a space program of the existing City Hall and Police Department as
well as draft versions of future space needs in the short term (1 year), mid-term (3 years),
and long term (5-10 years).
B.The group discussed City Council/Community space needs:
1.The Council Chamber could be combined with the Community Room.
2.The Lobby does not need to be as large as it is currently.
3.Elections Storage is adequately sized.
4.There is a need for a public Coats Room, thought the flow would ideally be reworked.
5.The program should include increased Data Room sizes and a separate A/V
Equipment Room.
C.The group discussed City Hall space needs:
1.City Hall Shared:
a.There will likely be two (2) people who need access to the Reception Desk in the
mid-term, though the Reception Area could still be reduced in size.
b.Add two (2) Contract Drop-in Workstations at 25 SF each.
c.Add another 64 SF Drop-in Workstation for future.
2.City Admin:
a.The City Administrator Office could be reduced to 180 SF.
MEMORANDUM
Page 2 of 3
b. The City Clerk Office could be reduced to 150 SF.
c. The Administrative Services Director Office should be 150 SF.
3. Building and Inspections
4. Planning
5. Public Works:
a. The Public Works Director should have a larger office.
6. Code Enforcement
7. Finance:
a. It was noted that staff organization will eventually include a Finance Department
and that Utility Billing should be reclassified under this department.
D. The group discussed Police Department space needs:
1. Police Administration:
a. The current Copy/Work Area is undersized for booklet-making needs.
b. A Files and Supplies Storage Room should be added adjacent to the Copy/Work
Area.
c. Should plan long-term for a second Interview Room.
d. The Police Lieutenant’s office should increase in size in the mid to late-term
program.
e. The Director of Public Safety Office would ideally be larger, though this could be
supplemented by a conference room.
2. Investigations:
a. Two (2) Detective’s Offices will be required long-term.
b. A Forensic Office will be added to the late-term space needs.
c. The Interview Room(s) should be located near the investigators.
3. Patrol:
a. The program calls for 180 SF for the Report Writing Room which is enough space
for four (4) to six (6) carrels.
b. The Reserves Room should be increased to 140 SF.
c. A single 140 SF office is sufficient for both future Patrol Sergeants.
4. Booking
5. Evidence:
a. The Evidence Processing and Crime Lab spaces should be combined into one (1)
200-250 SF space.
6. Police Support Spaces:
a. It was noted that the EOC is not adequate in size. The EOC and Training Room
would ideally be adjacent and could be combined into one (1) large space
potentially with a movable partition.
b. It was noted that with the correct technology there is often not a need for a
dedicated Video Viewing Room for the Interview Room or an A/V Room for the
EOC. The program should reflect more space for Data though.
c. The short to mid-term Lockers/Changing space listed at 200 SF would allow for
lockers in an enclosed room, but would not be large enough for showers and
toilets.
MEMORANDUM
Page 3 of 3
7. Police Squad Garage:
a. The Specialty Vehicle Storage should be increased to also allow for the two (2)
existing 42-foot trailers.
E. Ambulance:
1. There is no space need for Ambulance Parking in the Police Garage.
2. The existing Ambulance spaces are sufficient as-is.
F. Next Steps:
1. The Space Needs Committee will meet on Tuesday, March 13, 2018 at 10:00 a.m. to
review the updated program and preliminary floor plan diagrams.
cc: Andrew Dahlquist, Wold
MV/Promo/CI_Corcoran/min/2.28.18
MEMORANDUM
To: Attendees
From: Derek Gallagher | DG
Date: March 15, 2018
Comm. No: 182066
Subject: City of Corcoran
Space Needs Committee Meeting
March 13, 2018 Meeting Minutes
bmartens@ci.corcoran.mn.us
mgottschalk@ci.corcoran.mn.us
kmattson@ci.corcoran.mn.us
jdunning@woldae.com
Attendees:
Brad Martens, City of Corcoran
Matt Gottschalk, City of Corcoran
Kevin Mattson, City of Corcoran
Joel Dunning, Wold Architects and Engineers
Derek Gallagher, Wold Architects and Engineers dgallagher@woldae.com
Representatives from the City of Corcoran met with Wold to discuss draft space use options.
Discussion Topics:
A.The group reviewed draft floor plans for each of the three (3) space needs phases discussed
previously. These phases are described generally below and are also attached to these
minutes.
1.Short Term:
a.Council Chambers combined with Community Room.
b.Open workstations relocated to former Council Chambers.
c.Former City Administrator office converted to Kitchen / Breakroom.
d.New Conference Room in City Hall Lobby.
e.Police Department offices and lockers located in former City Hall spaces.
f.Added Interview / Safe Room and modified Public Safety Director Office.
g.Squad Room converted to Evidence Storage.
2.Mid Term:
a.Vehicle Storage relocated to garage addition to the south.
b.Several new and existing Police Department spaces relocated to expanded former
Police Garage.
c.City Hall expanded west to allow for more office space.
3.Long Term:
a.Police Department functions removed from City Hall side of building.
b.Former Police Department replace with new structure between existing City Hall
and Police Garage from mid-term phase.
MEMORANDUM
Page 2 of 2
B. The group reviewed the options and discussed several items.
1. It was noted that the Council Chambers A/V Equipment Room could be shifted to a
later phase.
2. It was noted that an open Conference Room in the City Hall Lobby might be more
feasible due to the vaulted ceiling and need for access to the adjacent gardens.
3. The group discussed potential options to improve the flow to the City Hall Copy
Room.
4. Access to the Mechanical Room and coordination with the existing equipment layout
will need to be considered. Wold will explore other options, potentially with offices
located in the former Council Chamber.
5. Ideally, staff would not have to pass the City Manager’s office to access the Breakroom.
6. The kennel will need to be relocated in order to maintain a space for weapons cleaning
in the Police Garage.
7. It would be preferable to enlarge the Public Safety Director’s Office rather than add a
small conference room. It was also noted that the new orientation would require new
furniture.
8. The current lockers / changing area should be allocated for Reserves Equipment.
9. The CSO Area and Police Copy Work Area should be swapped. Some basic copy
functions should be added to Police Reception as well. The CSO Area should be open
to the EOC / Squad Room.
10. The group discussed the possibility of using the existing Ambulance Lounge as a
Police Department Locker Room and relocating the Ambulance lounge. Wold will
explore options.
11. It was noted that expanding to the South might not be ideal due to the location of the
Septic Drain Field.
12. Two (2) construction phases are probably more feasible than the current three (3) phase
plan. Ideally, all major construction (e.g. additions or a new building) would take place
in a single phase.
C. Next Steps:
1. The group will further review the options presented at the meeting and provide
additional feedback about the ideal number and scope of construction phases before
the next meeting.
2. The group will note any missing / extra workstations currently shown on the plans.
3. Wold will refine the short-term floor plan diagram based on feedback given at the
meeting and will incorporate feedback about the mid and long term space needs as it
becomes available.
4. The group will meet again on Wednesday, March 28, 2018 at 1:00 p.m. to discuss
revised drawings.
cc: Andrew Dahlquist, Wold
CM/MN/CI_Corcoran/182066/min/3.13.18
MEMORANDUM
To: Attendees
From: Derek Gallagher | DG
Date: May 15, 2018
Comm. No: 182066
Subject: City of Corcoran
Space Needs Committee Meeting
May 9, 2018 Meeting Minutes
bmartens@ci.corcoran.mn.us
mgottschalk@ci.corcoran.mn.us
kmattson@ci.corcoran.mn.us
Attendees:
Brad Martens, City of Corcoran
Matt Gottschalk, City of Corcoran
Kevin Mattson, City of Corcoran
Joel Dunning, Wold Architects and Engineers jdunning@woldae.com
Derek Gallagher, Wold Architects and Engineers dgallagher@woldae.com
Representatives from the City of Corcoran met with Wold to review updated bubble diagrams and
discuss preliminary budget projections.
Discussion Topics:
A.The group reviewed bubble diagrams for the two proposed project phases. The diagrams
have been updated to reflect the feedback below and are attached to these minutes.
1.The Drug Taskforce Agent should be at a drop-in workstation in the Detective
Office/Case Management Room in order to provide the Police Lieutenant Office with
enough space.
2.The group discussed the possibility of shifting the Interview Room south to align with
the reception area and create a more usable Conference Room in the second
construction phase. This option is reflected on the attac hed plans, though the exact
layout of this space can be determined in more detail during design.
B.Wold will conduct a cursory Building Analysis to determine whether any building systems
should be updated along with the proposed construction.
C.It was noted that there is no fire suppression in the existing building. However, code
requirements for exiting are unlikely to change significantly since the proposed project
would eliminate some assembly space in the building. The group would like to reach out
to the Fire Marshal about the proposed changes.
D.The building will be occupied during construction, which will affect cost and will require
phasing coordination. This will occur later in the process.
MEMORANDUM
Page 2 of 2
E. The group discussed preliminary budget projections, which are attached to these minutes.
1. It was noted that the numbers presented are based on average cost per square foot for
similar projects, and therefore, represent conservative budget numbers as opposed to
detailed estimates.
2. Wold could conduct a more detailed analysis or have an in-depth estimate conducted
by a third party if the group determines this in necessary.
3. A discussion among city staff is required to determine if scope could be reduced or
shifted to a later phase before the group reports to City Council.
4. It was noted that a decision will need to be made about modifying/adding utility
services with the proposed projects.
5. The first construction phase should include renovations of the public toilet rooms
including new partitions and sinks at a minimum.
Next Steps:
A. Wold’s engineers will conduct a cursory building analysis.
B. City staff will reach out to the Fire Marshal with information about the project.
C. City staff will discuss potential scope and phasing changes as well as determine whether
additional budget projections/estimates are necessary.
D. Brad Martens will determine whether additional existing construction documents are
available and send them to Derek at Wold.
Attachments
cc: Andrew Dahlquist, Wold