Loading...
HomeMy WebLinkAboutResolution 2018-52 Fehn Meadows 2nd Addition PUD Plan - REVISEDCity of Corcoran County of Hennepin State of Minnesota RESOLUTION NO. 2018-52 Motion By: LaFave Seconded By: Bottema June 28., 2018 APPROVING PRELIMINARY PLANNED UNIT DEVELOPMENT (PUD) PLAN FOR "FERN MEADOWS 2nd ADDITION" FOR RAINS PROPERTIES, LLC ON THE 62.7-ACRE SITE AT (PID 03-119-23-13-0002) (CITY FILE 18-017) WHEREAS, Rains Properties, LLC ("the applicant") has requested approval of a preliminary plat for 14 single family homes on a 62.7-acre parcel legally described as: Outlot A, Fehn Meadows, according to the recorded plat thereof, Hennepin County, Minnesota. WHEREAS, the Planning Commission has reviewed the plan at a duly called, Public Hearing and recommends approval, and; NOW, THEREFORE, BE IT HEREBY RESOLVED BY THE CITY COUNCIL OF THE CITY OF CORCORAN, MINNESOTA, that it should and hereby does approve the request for a preliminary PUD development plan, subject to the following conditions: 1. A preliminary PUD development plan is approved to allow the creation of 14 lots for single family homes, in accordance with the application materials and plans received by the City on April 17, 2018 and revisions received May 2, 2018, June 11, 2018 and June 14, 2018, except as amended by this resolution. 2. Approval is contingent upon City Council approval of the requested rezoning and preliminary plat. 3. The applicant shall comply with all conditions in the City Engineer's memo dated May 30, 2018. 4. The approval is subject to the review and approval by the Elm Creek Watershed Management Commission. The applicant shall comply with any conditions of approval from the watershed. 5. The applicant shall address the comments in the Hennepin County memo dated May 23, 2018. 6. The preliminary PUD development plan is approved based on the finding that the proposed project is consistent with the City's Comprehensive Plan. 7. All platted residential lots shall comply with the standards in Section 940 of the City Code, except that PUD flexibility is granted for the following: a. The minimum lot width is 160 feet where 200 feet is typically allowed. b. A minimum setback of 50 feet is required where OS&P plats are required to meet a 75-foot build-to (maximum setback) line. Page 1 of 3 City of Corcoran County of Hennepin State of Minnesota IN " Cs]ki I _kT' rel N Pill F011E � Yj June 281 2018 8. Residential Lots 8 through 12 shall comply with the standards in Section 1050.020 of the City Code, except that PUD flexibility is granted to allow a maximum building height of 35 feet where 25 feet is typically allowed, provided that: a. For Lots 8 through 11, the building pad shall not be located in the Shoreland Overlay boundary. b. For Lot 12, the lot does not allow construction of the home outside of the Shoreland Overlay District, therefore, two additional trees shall be planted between the building and Rush Creek. Parking 9. Parking shall be permitted on one side of the local streets and shall be signed in accordance with city standards. Landscaping 10. The landscape plan shall be revised to provide no more than 33% of a single tree species, as required by Section 1060.070 of the Zoning Ordinance. 11. The HOA shall be responsible for maintenance of all common lots and trails within the open space. 12. The HOA declaration shall be reviewed and approved by the City Attorney prior to final plat. 13. A preservation, restoration and management plan for all open space land shall be provided with the final plat for review and approval. 14. The developer must prepare a stormwater maintenance easement for review and approval by the City and the easement will be recorded with the final plat. Streets 15. All streets within the development shall be public streets. 16. A temporary cul-de-sac easement shall be submitted with final PUD development plan for review and approval by the City. Wetlands/Shoreland 17. Wetland buffer monuments shall be shown on the plans and installed prior to issuance of building permit. 18. Shoreland buffer monuments shall be installed prior to issuance of building permit. 19. Drainage and utility easements must be provided over all wetlands, wetland buffers and ponds. 20. Drainage easements shall be dedicated on each side of the centerline of any wetland, body of water, watercourse or drainage channel. Page 2 of 3 City of Corcoran County of Hennepin State of Minnesota RESOLUTION NO. 2018 -52 Park Dedication June 28, 2018 21. Park dedication shall be cash in lieu of land in accordance with the park dedication policy in place when the plat is released for recording. Miscellaneous 22. A final PUD development plan must be submitted with the final plat for review and approval. 23. No signage is proposed or approved at this time. Any signage will require a sign permit and compliance with Chapter 84 of the City Code. VOTING AYE ® Thomas, Ron ® Bottema, Jon ❑ Dejewski, Brian ❑ Keefe, Mike ® LaFave, Tonya VOTING NAY ❑ Thomas, Ron ❑ Bottema, Jon ❑ Dejewski, Brian ❑ Keefe, Mike ❑ LaFave, Tonya Whereupon, said Resolution is hereby declared adopted on this 28th day of June 2018. Ron Thomas - Mayor ATTEST: City Seal ssica Beise — City Clerk/Administrative Services Coordinator Page 3 of 3