Loading...
HomeMy WebLinkAboutResolution 2018-48 Encore CC PUB PlanCity of Corcoran County of Hennepin State of Minnesota RESOLUTION NO. 2018 -48 Motion By: Bottema Seconded By: LaFave June 28, 2018 APPROVING PRELIMINARY PLANNED UNIT DEVELOPMENT (PUD) PLAN FOR "ENCORE" FOR PULTE HOMES OF MINNESOTA LLC ON THE 225.9 -ACRE SITE LOCATED AT 9975 COUNTY ROAD 101 (PIDS 12- 119 -23 -12 -0001, 01- 119 -23 -43 -0002, 01- 119 -23 -44 -0001 AND 01- 119 -23 -41 -0001) (CITY FILE 18 -007) WHEREAS, Pulte Homes of Minnesota, LLC ( "the applicant ") has requested approval of a preliminary PUD development plan for 398 single family homes on 225.9 -acres legally described as: The North Half of the Northeast Quarter of Section 12, Township 119, North Range 23, West of the Fifth Principal Meridian, Hennepin County, Minnesota; Except that part of the Northeast Quarter of the Northeast Quarter of Section 12, Township 119, Range 23, described as follows: Commencing at the Northeast corner of said Northeast Quarter; thence South along the East line of said Northeast Quarter of the Northeast Quarter a distance of 514 feet; thence at right angles West a distance of 618.65 feet; thence at right angles North a distance of 514 feet to the North line of said Northeast Quarter of the Northeast Quarter; thence East along the said North line to the point of beginning. Also, the Northeast Quarter of the Northwest Quarter of Section 12, Township 119, Range 23, Hennepin County, Minnesota. :1% The South Two - thirds (2/3) of the Southeast Quarter (SE114) except road, Section 1, Township One Hundred Nineteen (119), Range Twenty -three (23), Town of Corcoran, Hennepin County, Minnesota. 'm►D The south 292.70 feet of the west 595.12 feet of the north 113 of the East 112 of the Southeast Quarter, Section 1, Township 119, Range 23, Hennepin County, Minnesota. WHEREAS, the Planning Commission has reviewed the plan at a duly called Public Hearing and recommends approval, and; NOW, THEREFORE, BE IT HEREBY RESOLVED BY THE CITY COUNCIL OF THE CITY OF CORCORAN, MINNESOTA, that it should and hereby does approve the request for a preliminary PUD development plan, subject to the following conditions: 1. A preliminary PUD development plan is approved to allow the creation of 398 lots for single family homes and 18 outlots, in accordance with the application materials and plans received by the City on April 17, 2018 and revisions received May 5, 2018, May 17, 2018, May 24, 2018, and June 20, 2018 except as amended by this resolution. Page 1 of 7 City of Corcoran County of Hennepin State of Minnesota RESOLUTION NO. 2018-48 June 281 2018 2. Approval is contingent upon City Council approval of the requested rezoning and preliminary plat. 3. The applicant shall comply with all conditions in the City Engineer's memo dated May 25, 2018. 4. The approval is subject to the review of the City Public Safety Committee. The applicant shall work with the City to address any comments from the committee. 5. The approval is subject to the review and approval of wetland delineation and mitigation plans by the Elm Creek Watershed Management Commission. The applicant shall comply with any conditions of approval from the watershed. 6. The application is subject to review and approval by Hennepin County. The applicant is required to obtain permits and approvals from the County as needed. 7. The application is subject to review and approval by the Minnesota Department of Natural Resources (DNR). The applicant is required to obtain permits and approvals from the DNR as needed. 8. The extension of sanitary sewer and municipal water is required to serve this site. Approval of this PUD is contingent upon extension of these services by the developer to the site. The initial phase will include the construction of the primary project infrastructure, roadway improvements on County Road 101 at the main entrance and other key public infrastructure improvements. 9. The preliminary PUD development plan is approved based on the finding that the proposed project is consistent with the City's Comprehensive Plan. 10. Approval is subject to compliance with the mitigation strategies outlined in the EAW and identified in the record of decision. 11. The applicant shall provide gross density, pre-development density, and post density calculations for land, parks, and trails prior to their final PUD development plan submittal. 12. The final plat and final PUD plan shall be revised to be consistent with the site plan submitted to the City on May 17, 2018. Page 2 of 7 City of Corcoran County of Hennepin State of Minnesota 13. All platted residential lots shall comply with the following: June 28, 2018 14. Mechanical equipment (including air conditioning units) must be located in the side or rear yard. 15. Driveways may not encroach in the drainage and utility easements on the side yards. 16. All garages must have a minimum 22-foot parking area in front of the garage that does not overlap into sidewalks, drives or streets. 17. The applicant shall provide details of the driveway, house pads, and setbacks as part of their final PUD Plan application that demonstrate compliance with the approved PUD standards. Architectural and Design standards 18. The applicant shall provide elevations and architectural styles for the 34-foot wide homes for review and approval by staff prior to final plat and final PUD plan application. 19. Any changes or updates to the architectural elevations or plans provided to the City must be approved by City staff to ensure compliance with PUD approvals. 20. The applicant will be required to provide variation in the combination of color of siding accent and roofing materials, consistent with Section 1040.040, Subd. 8.A.4 of the Zoning Ordinance. 21. All Design Requirements for the RSF-3 district described in Section 1040.050 shall be met, except that PUD flexibility shall be provided to a. Allow the garages on the 34-foot wide homes on the 44-foot and the 50-foot wide homes on the 60-foot lots to exceed more than 55 percent of the viewable ground floor street- Page 3 of 7 Single Family Detached Minimum Lot Area 5,000 sq. ft. (for flexibility- -the smallest lot shown is 5,718) Minimum lot width (measured at front building setback) 44 feet Minimum Principal Structure Setbacks Front, County Road 101 100 feet Front, From all other streets 20 feet Front Porch (5 120 square feet) 15 feet Side (living) 5 feet Side (garage)** 5 feet Rear 25 feet Maximum Principal Building Height 35 feet Driveway setback 5 feet 14. Mechanical equipment (including air conditioning units) must be located in the side or rear yard. 15. Driveways may not encroach in the drainage and utility easements on the side yards. 16. All garages must have a minimum 22-foot parking area in front of the garage that does not overlap into sidewalks, drives or streets. 17. The applicant shall provide details of the driveway, house pads, and setbacks as part of their final PUD Plan application that demonstrate compliance with the approved PUD standards. Architectural and Design standards 18. The applicant shall provide elevations and architectural styles for the 34-foot wide homes for review and approval by staff prior to final plat and final PUD plan application. 19. Any changes or updates to the architectural elevations or plans provided to the City must be approved by City staff to ensure compliance with PUD approvals. 20. The applicant will be required to provide variation in the combination of color of siding accent and roofing materials, consistent with Section 1040.040, Subd. 8.A.4 of the Zoning Ordinance. 21. All Design Requirements for the RSF-3 district described in Section 1040.050 shall be met, except that PUD flexibility shall be provided to a. Allow the garages on the 34-foot wide homes on the 44-foot and the 50-foot wide homes on the 60-foot lots to exceed more than 55 percent of the viewable ground floor street- Page 3 of 7 City of Corcoran June 28., 2018 County of Hennepin State of Minnesota RESOLUTION NO. 2018-48 facing linear building frontage. The 40-foot wide homes on the 50-foot lots shall comply with the garage standards. In exchange for this flexibility: i. Garage door colors shall be compatible with the building colors. ii. Architectural elements shall be added above the garage to de-emphasize the garage doors where possible. iii. Garage doors shall be architecturally styled to match the exterior of the home. b. Allow flexibility from the standard that requires architectural upgrades to all four sides of the building, based on the following conditions: i. The applicant shall provide equal architectural treatment on the elevations of a home that face a public right-of-way or park at the locations shown in the exhibit titled "Approved Locations of Architectural Upgrades" (shown as Figure 3 in the Council staff report). The applicant will be allowed flexibility for materiality on those areas identified for "upgraded trim only". For example, if three sides of the home face a public right-of-way or park, then equal architectural treatment shall be provided on those three sides of the building as at the level described in the exhibit. ii. The applicant shall provide staff with elevation details for all current home styles prior to submittal of the final PUD development plan. 22. The applicant shall provide copies of the final HOA documents/covenants for City review as part of the final plat application. 23. The developer shall provide centralized mailbox locations. A mailbox plan shall be provided for City review and approval. Parking 24. Parking shall be permitted on one side of the local streets and shall be signed in accordance with city standards. Landscaping and Lighting 25. The applicant shall work with staff to determine the final placement of trees in compliance with the Engineering Standard Detail Plates. A revised landscape plan shall be provided for City Council review prior to approval of the final plat and PUD final plan. Plans shall show details of proposed landscaping in all cul-de-sacs and wetland vegetative buffers. 26. Plans shall be revised to show proposed lighting as well as existing lighting. 27. The applicant shall finalize the fixtures proposed in the submittal and provide detailed specifications that demonstrate compliance with 1060.040 (Lighting) of the Zoning Ordinance. 28. Lawn sprinklers/irrigation systems (if provided) shall all have rain sensors to limit unnecessary watering. Page 4 of 7 City of Corcoran County of Hennepin State of Minnesota IN, • 19 16IM110-INK01 June 28., 2018 29. The HOA shall be responsible for maintenance of all common lots, cul de sac landscaping and ponds. 30. The applicant shall work with the City to finalize the design of the decorative lighting that will be installed. The applicant shall provide street lights in compliance with City Policy. Wetlands 31. The applicant is granted PUD flexibility for alternative wetland buffer setbacks for Wetland #8 on Outlot E as shown on the Wetland Buffer Average exhibit received by the City on June 21, 2018. As part of the final plat and final PUD submittal, the applicant shall be required to demonstrate compliance with 1050.010 Subd. 6 (E-H) of the Zoning Ordinance. 32. The plans shall be revised to identify wetland buffers, buffer setbacks, and monuments as required by Section 1050.010 of the Zoning Ordinance. 33. Wetland buffer monuments shall be installed prior to issuance of building permit. 34. Landscape plans shall be revised to incorporate wetland buffer vegetation strips in compliance with Section 1050.10, Subd.8 of the Zoning Ordinance. 35. The developer must install wetland buffer monuments prior to issuance of building permits for adjacent buildings. 36. Trails shall not be located in the wetland buffer areas, except when providing access to the boardwalk and as shown in the Wetland Buffer Trail Encroachment Exhibit received by the City on June 20, 2018. 37. The applicant must obtain any necessary permits from other agencies to install the boardwalk. Drainage/Stormwater Management 38. Drainage and utility easements must be provided over all wetlands, wetland buffers and ponds. 39. A 10 -foot drainage & utility easement shall be provided along the perimeter of all lots. 40. Plans shall be revised to show any known drain tiles located on the property. 41. The applicant shall continue to work with the City to address drainage on the northeast portion of the site. Streets, Parking and Utilities 42. All streets within the development shall be public streets. 43. The developer will work with City staff to finalize street names, in compliance with the City's street naming policy. Page 5 of 7 City of Corcoran County of Hennepin State of Minnesota RESOLUTION NO. 2018-48 June 28, 2018 44. Utilities shall be stubbed to the property lines for future extension to adjacent properties. The stubs shall be at the developer's expense. 45. All utility facilities shall be located underground. 46. Temporary turnarounds shall be provided on stubbed streets more than 150 feet in length. 47. Barricades and signage indicating future extension shall be installed, consistent with Section 945.010, Subd. 19 of the Subdivision Ordinance. 48. The applicant shall work with staff to provide the appropriate terminus for Jack Pine Lane south of proposed Schober Park. Park Dedication 49. Park Dedication has been satisfied through contribution of land, construction of the private amenity facility and associated land shown on plans, pavement of trails, and construction of the boardwalk, subject to the following conditions: a. The applicant shall provide a final calculation of the net and gross acreage of land, open space and trails to staff prior to final plan and final PUD plan submittal. b. The developer shall dedicate the open space park as shown on plans. c. The developer shall dedicate the land for the neighborhood park as shown on plans d. The developer shall be given full credit for the private amenity center (20% of Park Dedication requirement) as shown on plans. Additionally: i. The applicant shall provide details for ownership and maintenance to the City prior to approval of final plat and final PUD plan of Phase 1 of the development, ii. The applicant shall record covenants that run with the land in favor of the future owners of property within the subdivision that restrict the use of the land and building to park and recreation purposes. The covenants cannot be modified without the written consent of the City Council. e. The developer shall dedicate 20-foot easements for all off-road trails and shall be given land dedication credit for the net area of these easements f. The developer shall construct all trails shown on the plan, except the on-road trails on County Road 101 and Stieg Road. g. The developer shall construct the boardwalk. Final design shall be developed with city staff and may include a railing. h. The developer shall adjust trail and sidewalk alignment and provide connections as recommended by staff. Page 6 of 7 City of Corcoran June 28, 2018 County of Hennepin State of Minnesota RESOLUTION NO. 2018 -48 i. If the cost for paving the trails and constructing the boardwalk exceeds the amount of required cash -in -lieu of land, the City shall give a credit to the developer based on the actual cost. j. Park dedication shall only be granted for trail easement areas as shown on the Comprehensive Plan and will not be given for trails located within public right -of -way. Miscellaneous 50. A final PUD development plan must be submitted with the final plat for review and approval, consistent with the Site Plan submitted to the City on May 17, 2018. 51. No signage is proposed or approved at this time. A master signage plan with sign details shall be included as part of the final PUD plan submittal. Any signage will require a sign permit and compliance with Chapter 84 of the City Code. VOTING AYE ® Thomas, Ron ® Bottema, Jon F-1 Dejewski, Brian F-1 Keefe, Mike ® LaFave, Tonya VOTING NAY ❑ Thomas, Ron ❑ Bottema, Jon Ej Dejewski, Brian ❑ Keefe, M i ke [:] LaFave, Tonya Whereupon, said Resolution is hereby declared adopted on this 28th day of June 2018. Ron Thomas - Mayor ATTEST: City Seal J ssica Beise —City Clerk/Administrative Services Coordinator Page 7 of 7