HomeMy WebLinkAboutResolution 2018-16 Approving Final Planned Unit Development for Ravinia 9th AdditionCity of Corcoran County of Hennepin State of Minnesota RESOLUTION NO. 2018-16 Motion By: -Dejewski Seconded By: Botterna February 22,, 2018 APPROVING FINAL PLANNED UNIT DEVELOPMENT (PUD) PLAN AND PUD AMENDMENT FOR "RAVINIA 9TH ADDITION" FOR THE LENNAR CORPORATION (PID 36-119-23-24-0002 AND 36-119-23-13-0012) (CITY FILE 17-042) WHEREAS, The Lennar Corporation ("the applicant") has requested approval of a preliminary plan for 49 single family homes and one outlot on property legally described as: Outlot A, RA VINIA 7TH ADDITION. Except that part of said Outlot A, RA VINIA 7TH ADDITION, described as commencing at the northwest comer of Lot 5, Block 4, said RA VINIA 7TH ADDITION; thence North 70 degrees 31 minutes 28 seconds East along the northwesterly line of said Block 4 a distance of 128.59 feet to an angle point of said Block 4; thence North 55 degrees 25 minutes 36 seconds East a distance of 113.79 feet to an angle point of said Block 4; thence North 04 degrees 55 minutes 33 seconds East a distance of 19.48 feet to the north comer of Lot 1, said Block 4, RA VINIA 7TH ADDITION, being the point of beginning; thence North 04 degrees 55 minutes 33 seconds East a distance of 4.11 feet; thence North 86 degrees 40 minutes 58 seconds East a distance of 156.93 feet; thence South 03 degrees 19 minutes 02 seconds East a distance of 48.58 feet to an angle point in the west right of way line of Primrose Court; thence South 03 degrees 19 minutes 02 seconds East along said west right of way line of Primrose Court a distance of 18.03 feet to the northeast comer of said Lot 1; thence North 71 degrees 39 minutes 36 seconds West along the northeast line of said Lot I a distance of 169.48 feet to the point of beginning. Also, except that part of said Outlot A, RA VINIA 7TH ADDITION, described as commencing at the north comer of Lot 7, Block 2, said RA VINIA 7TH ADDITION; thence South 56 degrees 24 minutes 07 seconds West along the northwest line of said Lot 7 and Lot 8, said Block 2, RA VINIA 7TH ADDITION a distance of 149.69 feet to the northwest comer of said Lot 8, being the point of beginning; thence South 21 degree 42 minutes 05 seconds West a distance of 66.18 feet.- thence South 14 degrees 20 minutes 32 seconds East a distance of 121.78 feet to the northwesterly right of way line of Primrose Lane; thence northeasterly a distance of 17.39 feet along said northwesterly right of way line of Primrose Lane being a curve concave to the northwest, having a radius of 250.00 feet, a central angle of 3 degrees 59 minutes 09 seconds and a chord that bears North 54 degrees 31 minutes 59 seconds East a distance of 17.39 feet to the south comer of Lot 9, Block 2, said RA VINIA 7TH ADDITION; thence North 21 degrees 14 minutes 49 seconds West along the southwest line of said Lot 9 a distance of 99.62 feet to the west comer of said Lot 9; thence North 11 degrees 58 minutes 56 seconds East along the northwest line of said Lot 9 and Lot 8 a distance of 78.24 feet to the point of beginning. For the purpose of this description, the north line of Outlot A, RA VINIA 7TH ADDITION is assumed to bear South 88 degrees 34 minutes 20 seconds East. Page 1 of 5 City of Corcoran County of Hennepin State of Minnesota RESOLUTION NO. 2018-16 February 22, 2018 WHEREAS, the Planning Commission has reviewed the plan at a public meeting and recommends approval, and; NOW, THEREFORE, BE IT HEREBY RESOLVED BY THE CITY COUNCIL OF THE CITY OF CORCORAN, MINNESOTA, that it should and hereby does approve the request for a final PUD development plan, subject to the following conditions: 1. A final PUD plan is approved to allow the creation of 49 single family lots and one outlot in accordance with the application materials and plans received by the City on December 19, 2017 and revisions received on January 9, 2018 and February 1, 2018, except as amended by this resolution. 2. Approval is contingent upon City Council approval of the final plat and development contract. 3. The development contract must be amended and executed by the developer and the City and must be filed with the final plat. 4. The development shall be subject to all conditions of the "Ravinia" preliminary PUD development plan approval and all amendments. 5. The application shall comply with all conditions in the City Engineer's memo dated January 22, 2018. 6. PUD Amendments are approved for the following: a. Signage. The sub-monument sign is approved as shown on the December 19, 2017 submittal for a smaller sub-monument sign in the previously approved locations. b. Landscaping. The applicant requested a number of modifications to the approved landscape plan. i. The request to remove gingkoes and sugar maples varieties from the approved planting list and substitute elm varieties for ginkgoes and red maple varieties for sugar maples is approved with the condition that tree diversity within the project must still meet diversity standards per City Code. Section 1060.070 of the Zoning Ordinance simply states, "No more than 33 percent of the required number of trees shall be of one species." ii. The request to modify the planting details is approved with conditions. University of Minnesota Extension continues to recommend tree wrap for, "young trees, newly planted trees, and thin-barked trees... in order to prevent sub scald". Tree wrap may be implemented at the discretion of the Owner's Project Landscape Architect of Record with the caution that trees suffering sun scald at the end of the warranty period will be subject to replacement or additional mitigation measures to correct the damage. City approval of mitigation measures will be required if any are proposed. Page 2 of 5 City of Corcoran County of Hennepin State of Minnesota February 22., 2018 iii. The request to change staking to an option at contractor discretion is approved with conditions. Tree staking is not required unless necessary to maintain trees in a plumb condition where vandalism, soil or wind conditions are a problem. Tree staking shall be maintained during warranty period and removed after one year. Out of plumb trees shall be corrected in a timely manner such that damage to the tree or public safety is avoided. Lack of attention to this issue by the Owner or their representative in a timely manner will not release them from correction of the issue if the tree becomes established in an out of plumb condition. iv. The request to remove notes requiring inspection of root ball, but maintaining note requiring tree to be planted at the correct height, regardless of installation method used is approved with conditions. Trees must continue to meet industry standards for quality. ANSI A300 standards are the generally accepted industry standards for tree care practices. American Standard for Nursery Stock (ANSI 260.1-2004) provides guidance related to terminology and measurements of nursery stock. Both are suitable reference standards in serving to define quality for the purposes of this request. v. The request to allow contractor discretion in leaving twine and burlap in place if biodegradable is DENIED. The means and methods detailed on the approved plans and specifications should remain. Rope, twine, burlap and wire baskets must be removed per the approved plans and specifications. This is also consistent with the City of Corcoran detail plates. 7. The PUD is hereby approved to allow 65-foot wide lots in this plat. All platted residential lots shall comply with the following: 8. The site plan sheet (Sheet 1 of 24) shows different setbacks and should be corrected. 9. All garages must have a minimum 22-foot parking area in front of the garage that does not overlap into sidewalks, drives or streets. 10. The plans show centralized mailbox locations. These mailbox locations shall be approved by the US Postal Service and proof of the approved locations shall be provided to the City, prior to issuance of building permits. Page 3 of 5 65-foot lots Front, From County Road 101* 100 feet Front, From all other streets 20 feet Front Porch ( <_ 120 square feet) 15 feet Side (living) 5 feet Side (garage) (Minimum separation between structures on adjacent parcels shall be 10 feet.) 5 feet Rear 25 feet Maximum Principal Building Height 35 feet 8. The site plan sheet (Sheet 1 of 24) shows different setbacks and should be corrected. 9. All garages must have a minimum 22-foot parking area in front of the garage that does not overlap into sidewalks, drives or streets. 10. The plans show centralized mailbox locations. These mailbox locations shall be approved by the US Postal Service and proof of the approved locations shall be provided to the City, prior to issuance of building permits. Page 3 of 5 City of Corcoran February 22,, 2018 County of Hennepin State of Minnesota RESOLUTION NO. 2018-16 11. The project is subject to the PUD standards, which were amended to allow flexibility in building materials and were granted PUD flexibility to allow the face of the garage to exceed 55% of the building face, subject to certain standards as outlined in the PUD approvals. 12. Park dedication is based on the development of the entire Ravinia site and shall be land dedication totaling 32.12 net acres, due at the time of final plat for the phases that include public park dedication. With this phase, no park dedication is proposed. a. A north south trail is planned along the east side of Outlot A. This trail will be constructed when Outlot A is planned for development and the Tabor driveway issue is resolved. If the Tabor driveway is not relocated, the location of the trail must be relocated. 13. All permanent wetland buffer monument signs must be erected along the wetland buffer line as required by Section 1050.010, Subd. 7 of the Zoning Ordinance. a. The wetland buffer signs must be relocated to comply with ordinance requirements as the current plan does not comply. The revised plan must be submitted for City review and approval. b. Wetland signs shall be purchased from the City. c. The final locations must be inspected and approved by City staff. d. Monuments and signs shall be installed prior to approval of the building permit. 14. The development shall comply with the City's requirements regarding fire access, fire protection and fire flow calculations, the location of fire hydrants, fire department connections and fire lane signage. 15. The full extent of the project plat limits must be shown on the plan sheets. The plan sheets should all be updated. 16. The existing Tabor driveway must be shown on all plan sheets that include this area. a. The plans must show the existing conditions and the planned future improvements. b. Access must be maintained to the Tabor property throughout construction. A plan for access must be provided to the City and the Tabors. c. The Tabor/Lennar lawsuit and the underlying dispute regarding easement rights on the property is a civil issue that must be resolved prior to the commencement of any project action on the property which interferes with any existing easement rights. 17. An easement for the temporary cul de sac must be submitted for City review and approval and must be recorded at Hennepin County. 18. The following conditions be met prior to issuance of building permits: a. The applicant must record the approving resolutions and associated documents at Hennepin County and provide proof of recording to the City. Page 4 of 5 City of Corcoran February 22, 2018 County of Hennepin State of Minnesota RESOLUTION NO. 2018 -16 b. The applicant shall provide proof of recording the final plat and related documents at Hennepin County. c. The applicant shall provide the approved preliminary and final plan drawings to the City in an electronic (AutoCAD) format. VOTING AYE ® Thomas, Ron ® Bottema, Jon ® Dejewski, Brian ® Keefe, Mike ❑ LaFave, Tonya VOTING NAY F-1 Thomas, Ron [:] Bottema, Jon ❑ Dejewski, Brian ❑ Keefe, Mike F-]LaFave,Tonya Whereupon, said Resolution is hereby declared adopted on this 22nd day of February 2018. Ron Thomas -Mayor ATTEST: City Seal Je ".-ca Beise — City Clerk/Administrative Services Coordinator V Page 5 of 5