HomeMy WebLinkAboutResolution 2017-28 Approving PUD Bass Lake CrossingCity of Corcoran
County of Hennepin
State of Minnesota
RESOLUTION NO. 2017 -28
Motion By: Keefe
Seconded By: Dejewski
June 22, 2017
APPROVING PRELIMINARY PLANNED UNIT DEVELOPMENT (PUD) PLAN FOR "BASS
LAKE CROSSING" FOR MI HOMES OF MINNEAPOLIS LLC ON THE 51.26 -ACRE SITE AT
COUNTY ROAD 10 AND MAPLE HILL ROAD (PID 25- 119 -23 -13 -00039 25- 119 -23 -13 -0002)
(CITY FILE 17 -012)
WHEREAS, MI Homes of Minneapolis, LLC ( "the applicant ") has requested approval of a
preliminary PUD development plan for 97 single family homes on 51.26 -acres legally described
as:
PARCEL 1:
The Southwest Quarter of the Northeast Quarter; that part of the West Half of the
Southeast Quarter of the Northeast Quarter lying West of a line drawn from the
Southeast corner thereof to the Northeast corner thereof all in Section 25, Township
119, Range 23, Hennepin County, Minnesota, except therefrom the following described
property.
The East 266.98 feet of that part of the Southwest Quarter of the Northeast Quarter of
Section 25, Township 119, Range 23, Hennepin County, Minnesota, which lies West of
the following described line: Commencing at the Northwest corner of said Southwest
Quarter of the Northeast Quarter; thence South 89 degrees 17 minutes 26 seconds
East, assumed bearing, along the North line of the said Southwest Quarter of the
Northeast Quarter a distance of 898.88 feet to the beginning of the line to be described;
thence South 1 degree 27 minutes 39 seconds West to South line of said Southwest
Quarter of the Northeast Quarter and there terminating. North line of said Southwest
Quarter of the Northeast Quarter a distance of 898.88 feet to the beginning of the line to
be described; thence South 1 degree 27 minutes 39 seconds West to the South line of
the said Southwest Quarter of the Northeast Quarter and there terminating. And which
lies South of the North 467.19 feet, and which lies Northerly of the centerline of
Hennepin County State Aid Road No. 10 as shown by survey line on Highway Plat No.
8.
The East 266.98 feet of that part of the Southwest Quarter of the Northeast Quarter of
Section 25, Township 119, Range 23, lying South of the North 467.19 feet thereof,
Northerly of the center line of Hennepin County State Aid Highway No. 10 as shown by
survey line of Highway Plat No. 8 and a West of a line described as follows:
Commencing at the Northwest corner of said Southwest Quarter of the Northeast
Quarter; thence South 89 degrees 17 minutes 26 seconds East, assumed bearing, along
the North line of said Southwest Quarter of the Northeast Quarter, a distance of 898.88
feet to the beginning of the line to be described; thence South 1 degree 27 minutes 39
Page 1 of 6
City of Corcoran June 221 2017
County of Hennepin
State of Minnesota
RESOLUTION NO. 2017-28
seconds West to the South line of said Southwest Quarter of the Northeast Quarter and
there terminating. Hennepin County, Minnesota.
WHEREAS, the Planning Commission has reviewed the plan at a duly called Public Hearing
and recommends approval, and;
NOW, THEREFORE, BE IT HEREBY RESOLVED BY THE CITY COUNCIL OF THE CITY OF
CORCORAN, MINNESOTA, that it should and hereby does approve the request for a
preliminary PUD development plan, subject to the following conditions:
1. A preliminary PUD development plan is approved to allow the creation of 97 lots for single
family homes and six outlots, in accordance with the application materials and plans
received by the City on April 18, 2017 and revisions received May 17, 2017, except as
amended by this resolution.
2. Approval is contingent upon City Council approval of the requested Comprehensive Plan
Amendment, rezoning and preliminary plat.
3. The applicant shall comply with all conditions in the City Engineer's memo dated May 22,
2017.
4. The approval is subject to the review of the City Public Safety Committee. The applicant
shall work with the City to address any comments from the committee.
5. The approval is subject to the review and approval by the Elm Creek Watershed
Management Commission. The applicant shall comply with any conditions of approval from
the watershed.
6. The application is subject to the review and approval by Hennepin County. The applicant is
required to obtain permits and approvals from the County as needed.
7. The extension of sanitary sewer and municipal water is required to serve this site. Approval
of this PUD is contingent upon extension of these services to the site.
8. The preliminary PUD development plan is approved based on the finding that the proposed
project is consistent with the City's Comprehensive Plan.
9. The applicant shall provide gross density, pre-development density, and post density
calculations prior to their final PUD development plan submittal.
10. Prior to the final PUD development plan submittal, the applicant shall split PID # 25- 119 -23-
14 -0002 to bring the land that proposed Road B (Fir Lane) crosses into the final plat and
final PUD plan.
Page 2 of 6
City of Corcoran
County of Hennepin
State of Minnesota
RESOLUTION NO. 2017-28
11. All platted residential lots shall comply with the following:
June 22, 2017
12. Mechanical equipment (including air conditioning units) must be located in the side or rear
yard.
13. All garages must have a minimum 22-foot parking area in front of the garage that does not
overlap into sidewalks, drives or streets.
Architectural and Design standards
14. All Design Requirements for the RSF-3 district described in Section 1040.050 shall be met,
except that PUD flexibility shall be provided to allow with 3-car garages to exceed more than
55 percent of the viewable ground floor street-facing linear building frontage, based on the
following conditions:
a. Not more than 33% of the homes in the development shall have garages that exceed
the standard.
b. There shall be no more than three homes contiguous to each other that exceed the
55% requirement.
c. The garages shall not be more than 62% of the front elevation.
d. Three car garages shall be prohibited on the 50-foot wide lots.
e. The third stall garage must be offset two feet from the main portion of the garage to
provide visual relief.
15. Prior to the final PUD plan submittal, the applicant shall provide fully dimensioned building
elevations for all four sides of the building.
16. The applicant shall provide copies of the final HOA documents/covenants for City review as
part of the final plat application.
Single Family Detached
Minimum Lot Area
5,000 sq. ft.
(for flexibility--the smallest lot shown is 6,, 500)
Minimum lot width (measured at
front lot line)
50 feet
Minimum Principal Structure
Setbacks
Front, From all other streets
20 feet
Front Porch (5 120 square
feet)
15 feet
Side (living)
5 feet
Side (garage)**
5 feet
Rear
25 feet
County Road 10
50 feet
Maximum Principal Building
Height
35 feet
Driveway setback
5 feet
12. Mechanical equipment (including air conditioning units) must be located in the side or rear
yard.
13. All garages must have a minimum 22-foot parking area in front of the garage that does not
overlap into sidewalks, drives or streets.
Architectural and Design standards
14. All Design Requirements for the RSF-3 district described in Section 1040.050 shall be met,
except that PUD flexibility shall be provided to allow with 3-car garages to exceed more than
55 percent of the viewable ground floor street-facing linear building frontage, based on the
following conditions:
a. Not more than 33% of the homes in the development shall have garages that exceed
the standard.
b. There shall be no more than three homes contiguous to each other that exceed the
55% requirement.
c. The garages shall not be more than 62% of the front elevation.
d. Three car garages shall be prohibited on the 50-foot wide lots.
e. The third stall garage must be offset two feet from the main portion of the garage to
provide visual relief.
15. Prior to the final PUD plan submittal, the applicant shall provide fully dimensioned building
elevations for all four sides of the building.
16. The applicant shall provide copies of the final HOA documents/covenants for City review as
part of the final plat application.
City of Corcoran June 22, 2017
County of Hennepin
State of Minnesota
RESOLUTION NO. 2017-28
17. The developer shall provide centralized mailbox locations. A mailbox plan shall be provided
for City review and approval.
Parking
18. Parking shall be permitted on one side of the local streets and shall be signed in accordance
with city standards.
Landscaping and Lighting
19. A revised landscape plan shall be provided for City Council review prior to approval of the
final plat and PUD final plan. The revised plan shall incorporate additional understory
plantings between the housing and Maple Hill Road and County Road 10.
20. A final tree preservation plan in compliance with Section 930.010, Subd. 6 D of the
Subdivision Ordinance.
21. Plans shall be revised to show proposed lighting as well as existing lighting.
22. The applicant shall finalize the fixtures proposed in the submittal and provide detailed
specifications that demonstrate compliance with 1060.040 (Lighting) of the Zoning
Ordinance.
23. Lawn sprinklers/irrigation systems (if provided) shall all have rain sensors to limit
unnecessary watering.
24. The HOA shall be responsible for maintenance of all common lots.
25. The applicant shall work with the City to finalize the design of the decorative lighting that will
be installed. The applicant shall provide street lights in compliance with City Policy.
Streets, Parking and Utilities
26. All streets within the development shall be public streets.
27. Utilities shall be stubbed to the property lines for future extension to adjacent properties.
The stubs shall be at the developer's expense.
28. All utility facilities shall be located underground.
29. Public streets must have sidewalks on both sides of the street.
Wetlands
30. An approved wetland delineation and wetland replacement plan for all parcels included in
the development and shall be provided to the City prior to the PUD final development plan
submittal.
31. The plans shall be revised to identify wetland buffer monuments as required by Section
1050.010 of the Zoning Ordinance.
Page 4 of 6
City of Corcoran
County of Hennepin
State of Minnesota
RESOLUTION NO. 2017-28
June 22., 2017
32. Wetland buffer monuments shall be installed prior to issuance of building permit.
33. Landscape plans shall be revised to incorporate wetland buffer vegetation strips in
compliance with Section 1050. 10, Subd.8 of the Zoning Ordinance.
34. The developer must install wetland buffer monuments prior to issuance of building permits
for adjacent buildings.
Drainage/Stormwater Management
35. Drainage and utility easements must be provided over all wetlands, wetland buffers and
ponds.
36. A 10 -foot drainage & utility easement shall be provided along the perimeter of all lots.
37. Plans shall be revised to show any known drain tiles located on the property.
38. The applicant shall continue to work with the City to address drainage on the northeast
portion of the site.
Park Dedication
39. Park dedication shall be a combination of land and cash. The final dedication requirements
shall be determined with the final plat shall generally be as follows:
a. Dedication of a trail on the east side of the site shall be either:
i. Option A — A trail in the public right-of-way of Fir Lane and wrapping east to the
north side of the wetland with the addition of at least one look out area with
benches or
ii. Option B — an off road-trail. Trails shall be 8 feet wide in 20-foot easements and
credit will be given for the net acreage of the easement.
iii. If Option B is the preferred option of the City and the developer, the developer shall
be responsible for obtaining easements from the adjacent property for the off-site
portions of the trail.
b. The remainder of the park dedication shall be cash in lieu of land.
C. Park dedication shall only be granted for trail easement areas as shown on the
Comprehensive Plan and will not be given for trails located within public right-of-way.
d. In exchange for PUD flexibility, the developer is required to provide finished grading,
paving and ground cover for all trails within their developments. The developer shall
also provide a scenic overlook in the NE portion of the site. No credit toward the
required dedication shall be given for this work.
Miscellaneous
City of Corcoran
County of Hennepin
State of Minnesota
RESOLUTION NO. 2017 -28
June 22, 2017
40. A final PUD development plan must be submitted with the final plat for review and approval.
41. No signage is proposed or approved at this time. Any signage will require a sign permit and
compliance with Chapter 84 of the City Code.
VOTING AYE
® Thomas, Ron
® Bottema, Jon
® Dejewski, Brian
® Keefe, Mike
® LaFave, Tonya
VOTING NAY
❑ Thomas, Ron
❑ Bottema, Jon
❑ Dejewski, Brian
El Keefe, Mike
❑ LaFave, Tonya
Whereupon, said Resolution is hereby declared adopted on this 22nd day of June 2017.
Ron Thomas - Mayor
ATTEST:
City Seal
Jes ma Beise - City Clerk/Administrative Services Coordinator
Page 6 of 6