Loading...
HomeMy WebLinkAbout2013-10-10 - Council Agenda PacketAgenda Corcoran City Council October 10, 2013 - 7:00 PM 1. Call to Order/ Roll Call 2. Pledge of Allegiance 3. Agenda Approval 4. Open Forum 5. Presentations a. Laura Landis — Home Free* b. Paul Durand — Rockford Area Schools* 6. Consent Agenda a. Draft Minutes of September 26, 2013 Council Meeting* 7. Claims as Presented * a. Escrow Claims (Fund #500) b. All Other Financial Claims 8. Staff Reports / Memos /Commissions a. Medina Police Department Letter* 9. Planning Business / Landform -None 10. Unfinished Business a. Sanitary Sewer and Water Services* 11. New Business a. Survey Reimbursement Request* b. Trunk Fee Adoption -New Fees* c. 2014 Fee Schedule* d. 2010 -2012 Benefit Withholding Error* e. Home Free Funding Request* f. City Administrator Priorities* 12. Unscheduled Items 13. Closed Meeting a. To review proposed settlement agreement related to 19400 Co Rd 10 14. Review of Upcoming Council Meeting Agenda a. November and December meeting schedule* 15. Council Calendar Planning Commission 10/3/13 11/7/13 12/5/13 Thomas Guenthner Asleson Parks and Trails Commission 10/15/13 11/19/13 12/17/13 Guenthner Asleson Asleson 16. Adjournment *Includes Materials - Materials relating to these agenda items can be found in the House Agenda Packet by Door. STAFF REPORT Document No. 5a. Council Meeting: October 10, 2013 Prepared By: Brad Martens Topic: Home Free Action Required: None Summary: Laura Landis, Program Coordinator for Home Free will be speaking about her organization and presenting a request for funding. The specific request for funding will be discussed under new business (11e.). More information can be found in a separate staff report. STAFF REPORT Document No. 5b. Council Meeting: October 10, 2013 Prepared By: Brad Martens Topic: Paul Durand — Rockford Area Schools Action Required: None Summary: Paul Durand, Superintendent of Rockford Area Schools will present the proposed baseball field project along with his vision for the school owned property in Corcoran. The formal Land Use application along with Conditional Use Permit request will be brought to the City Council after it has been reviewed by the Parks and Trails Commission and the Planning Commission. 1. 2. 3. 4. 5. 6. 7. 8 a City of Corcoran City Council Meeting Minutes September 26, 2013 - 7:00 PM The Corcoran City Council met on September 26, 2013, at City Hall in Corcoran, Minnesota. Present were, Mayor Guenthner, Councilor Asleson, Councilor Cossette, Councilor Lynch, and Councilor Thomas. Also present were City Administrator Martens, City Attorney Carson, City Planner Lindahl, City Engineer Torve, Lieutenant Hamilton, and City Clerk Heinecke. Mayor Guenthner called the meeting to order at 7:00 pm Call to Order / Roll Call Pledge of Allegiance Agenda Approval Open Forum Presentations Consent Agenda a. Draft Minutes of September 12, 2013 Council Meeting b. Draft Minutes of September 12, 2013 Budget Meeting c. Accepting Donation NW Area Jaycees — Resolution 2013 -45 Motion: made by Cossette, seconded by Thomas to approve the consent agenda items b and c as presented. Voting Aye: Guenthner, Asleson, Cossette, Lynch, and Thomas (Motion carried 5:0) Motion: made by Cossette, seconded by Asleson to approve Draft Minutes of September 12, 2013 Council Meeting with the change "Council discussed, shared feedback with applicant and found it acceptable for the applicant to proceed." Voting Aye: Guenthner, Asleson, Cossette, Lynch, and Thomas (Motion carried 5:0) Claims as Presented a. Escrow Claims (Fund #500) Motion: made by Thomas, seconded by Asleson to approve the escrow claims as presented. Voting Aye: Guenthner, Asleson, Cossette, Lynch, and Thomas (Motion carried 5:0) b. All Other Financial Claims Motion: made by Cossette, seconded by Thomas to approve all other claims as presented. Voting Aye: Guenthner, Asleson, Cossette, Lynch, and Thomas (Motion carried 5:0) Staff Reports / Memos /Commissions a. Planning Project Report received, no action required. b. Code Compliance Report received, no action required. c. Financial Performance Report received, no action required. Planning Business / Landform a. Lennar EAW for Gleason Road properties (city file 13 -007) report presented by Planner Lindahl. Council discussed. Motion: made by Thomas, seconded by Lynch to approve Resolution 2013 -44 "A RESOLUTION DECLARING FINDING OF "NO NEED" FOR AN ENVIRONMENTAL IMPACT STATEMENT (EIS) BASED UPON THE REVIEW OF THE ENVIRONMENTAL ASSESSMENT WORKSHEET (EAW) DATED JULY 25, 2013 FOR THE PROJECT PROPOSED BY LENNAR CORPORATION (CITY FILE NO. 13- 007)" as presented. Voting Aye: Guenthner, Asleson, Cossette, Lynch, and Thomas City of Corcoran City Council Meeting Minutes September 26, 2013 - 7:00 PM (Motion carried 5:0) b. Downtown Design Guidelines /Plan Proposal report and options presented by Administrator Martens. Council discussed Motion: made by Asleson, seconded by Cossette to accept the work proposal as presented contingent on modification of the TIF budget to allocate $20,000 toward this project. Voting Aye: Guenthner, Asleson, Cossette, Lynch, and Thomas (Motion carried 5:0) 10. Unfinished Business a. PW Facility update from Administrator Martens. Motion: made by Thomas, seconded by Asleson to approve the following change proposals as presented. CCD 001 CMPR 011 CMPR 012 CMPR 013 CMPR 014 *4, CMPR 015 Voting Aye: Guenthner, Asleson, Cossette, Lynch, and Thomas (Motion carried 5:0) Motion: made by Thomas, seconded by Asleson to direct staff to proceed with developing fuel island proposal and authorizing staff to maintain the project schedule. Voting Aye: Guenthner, Asleson, Cossette, Lynch, and Thomas (Motion carried 5:0) i. Ebert Construction Pay #9 Motion: made by Cossette, seconded by Asleson to approve Ebert Construction Pay #9 as presented. Voting Aye: Guenthner, Asleson, Cossette, Lynch, and Thomas (Motion carried 5:0) b. Sanitary Sewer and Water Services report presented by Administrator Martens. Council discussed. Staff to prepare a survey document for council members to give focused input on major policy /ordinance items. c. Maple Hill Community Center report presented by Administrator Martens. Council discussed and directed staff to meet with all interested parties. 11. New Business a. TIF Modification Plan report presented by Administrator Martens. Council discussed. Motion: made by Thomas, seconded by Lynch to approve Resolution 2013 -46 "Approving modification to the TIF Plan for TIF District #1" as presented. Voting Aye: Guenthner, Asleson, Cossette, Lynch, and Thomas (Motion carried 5:0) b. MS4 Permit Renewal report presented by Administrator Martens. Council discussed. Motion: made by Cossette, seconded by Asleson to approve Wenck Associates MS4 Permit renewal proposal as submitted. Voting Aye: Guenthner, Asleson, Cossette, Lynch, and Thomas (Motion carried 5:0) 12. Unscheduled Items -None City of Corcoran City Council Meeting Minutes September 26, 2013 - 7:00 PM MOTION: made by Thomas, seconded by Asleson to adjourn. Voting Aye: Guenthner, Asleson, Cossette, Lynch, and Thomas. (Motion carried 5:0) Meeting adjourned at 9:28 pm Jeanie Heinecke — City Clerk FINANCIAL CLAIMS CHECK RANGE 21164 - 21203 Agenda Item Agenda Item Date 9/19/13 9/20/13 9/20/13 9/23/13 9/23/13 9/23/13 9/24/13 9/19/13 9/24/13 9/30/13 7a Paid to Carson, Clelland & Schreder Wenck Associates Inc Wenck Associates Inc Total to Agenda Item 7 a -b. Council Meeting Date: 10/10/2013 Prepared By: jheinecke FUND #500 Escrow Claims Amount Project name 140.00 Schmids Hidden Valley 12 -06 2,280.70 Lennar Feasibility 12 -025 2,931.80 Lennar PUD /EAW 13 -007 Total Fund #500 (See attached Check Detail Register) ALL OTHER FINANCIAL CLAIMS (See attached Check Detail Register) TOTAL AUTO DEDUCTIONS TOTAL EXPENDITURES FOR APPROVAL Auto Deductions / Electronic Fund Transfer / Other Disbursements Paid to Amount Net Payroll PR19 34,207.11 Payroll Taxes 13,239.39 Paychex Fee 261.54 PERA 8,312.44 Citi Street - 457 Deferred Comp 1,574.60 Citi Street - Health Care Saving 2,129.15 US Bank - H S A 1,451.51 Bank fee 4.00 MN Dept Rev -Fuel Tax 92.06 Blue Cross Blue Shield 10,462.50 Total 71,734.30 Total amount not reflected in Cash Balances Report $ (102,019.46) $ 5,352.50 $ 88,906.72 $ 71,734.30 $ 165,993.52 HACity Hall Inform ation\C ITY GOVERNMENT \Council, Commissions & Committees \Council Information \Council Claims \2013 Claims Cash GENERAL RESERVES DONATION FUND POLICE DONATION FUND FIREARMS SAFETY DWI FORFEITURE FUND DRUG FORFEITURE FUND TRUCK SAFETY ASPHALT MAINTENANCE POLICE CAPITAL FUND D /S- EQUIPMENT CERTS CO. RD. 19 IMPROVEMENT 2012B PUBLIC WORKS BOND TAX INCREMENT FINANCING INFRASTRUCTURE PLANNINC FACILITY EXPANSION D/S PW CAPITAL FUND PUBLIC WORKS FACILITY PARK CAPITAL FUND- DEDICA CAPITAL- EQUIPMENT CERTS SHANNON LANE ESCROW HOLDING FUND CIVIC ORGANIZATIONS WATER SEWER INVESTMENT CONTROL Total Cash CITY OF CORCORAN CASH BALANCE REPORT OCTOBER 3, 2013 G 100 -10100 G 201 -10100 G 202 -10100 G 204 -10100 G 205 -10100 G 206 -10100 G 207 -10100 G 305 -10100 G 308 -10100 G 309 -10100 G 310 -10100 G 311 -10100 G 401 -10100 G 402 -10100 G 407 -10100 G 410 -10100 G 411 -10100 N G 415 -10100 G 416 -10100 G 417 -10100 G 500 -10100 G 501 -10100 G 601 -10100 G 602 -10100 G 999 -10100 $359,519.07 $12,629.66 $1,601.15 - $22.12 $12,411.18 $1,168.62 $5,575.12 $71,453.56 $10,278.55 $43,841.98 - $2,333.60 $34,125.00 $1,694,925.54 - $62.448 -$13,341.00 $4.32 $2,280,883.40 $338,104.86 $13,503.87 $1,765.00 $57,448.00 $6,000.09 - $17,208761 - $9,765.14 $3,334.93 4,905,840.95 - $337,142.16 $25,237.55 $1,595.89 - $170.73 $11,592.68 $1,169.06 $3,348.97 $71,480.50 $39,760.84 $30,371.58 $134,195.51 $0.00 $1,872,801.48 - $768.33 - $15,693.30 $5.28 $0.00 $332,388.50 - $309,756.57 $1,639.89 $16,336.20 $6,000.09 $0.00 $0.00 $6,247.87 1,890,640.80 Farmers Savings Acct PARK CAPITAL FUND - MEMORIAL G 415 -10102 1 10,679,831 1 10,656.03 Change in Market Value GENERAL FUND IG 100 -10105 (2,415.42) 6,168.30 Grand Total Cash 4,914,105 36 1,907,465.131 Due to Other Funds INFRASTRUCTURE PLA SHANNON LANE G 402 -20700 G 417 -20700 177,632.76) (96,782.09) (176, 992.76) (100,305.06) Total Due to Other Funds (274,414.85) (277,297.82) CORCORAN, MN 10/03n3 1:19 PM Page Detail — Register@ October 2013 s100-4z100-131 Employer Paid Health $102.78 100113 Insurance Premium E1U0-413O8131 Employer Paid Health $58.27 100113 Insurance Premium E18O-414UO181 Employer Paid Health $37.08 100113 Insurance Premium e1UO'421O2'131 Employer Paid Health $13.*0 100118 Insurance Premium E1O&431OO-131 Employer Paid Health $07.41 108113 Insurance Premium E1OO'4192O'131 Employer Paid Health $14.18 100113 INSURANCE PREMIUM Total ASSURAwT EMPLOYEE BENEFITS —'-------- $373.12 E1o8-41130-354 Web Site $70OOU 33449 ANNUAL HOSTING Total AVENET, LLC $700.00 E1OO-4D1m0-130 Employer Paid pGA $35000 F8AREUNB2O2813FGAREIMBURSEMENT Tmu| BECHTOLD CLYDE --------' E1OO-431O0-81O Refunds/Reimbursements $80.00 2013RE|MB MAILBOX REIMBURSEMENT Total 8U8wO�n�N -------- . $60.00 EOO1-434OO-304 Legal Fees E1UU-41O00-300 Professional Gwo(3ENERAL) s8Oz-*S4uO'JO4 Legal Fees E1OO-41OOO'3VO Professional S*s<GENERAL> GuO&2O2o4 Gohmidn Hidden Valley 2nd 12'0 E 100-42100-304 Legal Fees E1OO-41000'308 Professional 8nm(GENERAL) E 100-*1800'300 Professional Onm(GENERAL) Total CARSON, CLELLANo&SCHReoER $80500 092813 UTILITY POL|CYK}RD|NANCE $1.120.00 092013 MAPLE HILL ESTATES $805.00 093013 UT|L|TYPOL|CYK}RD|N8NCE $70.00 092613 TODMEY $40.00 092018 LEGAL $1.772.00 092613 CRIMINAL-LEGAL $280.00 092813 CIVIL-LEGAL $rO.0u__0y2813 $29.99 RYAN WETLAND TURNBACK $5,062.80 E18O4182O'21D Operating Supplies (GENERAL) E41O-4u100-55U Motor Vehicles $22.75 100213 SQUAD TITLE #558 E 100-42108-208 Training and Instruction $54.21 100213 RANGE SUPPLIES E1OO-421O0-20O Office Supplies (GEmER8L) $42.09 100213 SUPPLIES E 100-42100'228 Building Repair Supplies $32.79 100213 BUILDING REPAIR E 10042100'321 Telephone $29.99 180218 CELL PHONE E18O4182O'21D Operating Supplies (GENERAL) $25.00 100213 VEHICLE TITLE CORCORAN, MN 10/03U3 1:19 pm Page 2 *Check Detail Register@ October 2013 Check Amt Invoice Comment E 100-42100-300 Professional Srvs (GENERAL) $30.00 100213 TOBACCO CHECKS Total CASH $236.83 Paid 66 '6�ii7i­" i 0/2013 CENTURY LINK E1OU452n8-321 Telephone $54.43 -------- 092113 LAND LINE Total CENTURY LINK $54.43 PaidChk# U2l1���- 1<�10�810- - ..... -~~------~- e415452O0-3OO Professional Sms(GENERAL) $400.00 092513 MEMORIAL GARDEN MAINTENANCE E 10041941-*00 Repairs &Maint Cont (GENERAL $275.00 082513 CITY HALL LANDSCAPE MAINTENANCE Total C*ELSauCAYE $705,00 PaiUChk#D�l174-lO/10i2n10-"CImT4j-47n-~-�^��~~^~~~~-�'���`~~~~~~'�~�~-~-~~~~'~�~-~~�~~~^-~'~--~^-~-~�-�~~^-�~�~-'~~---~^'�--~--~ e1OU'^21O0-223 Building Repair Supplies $38.09 470299143 FLOOR MATS E 100'41941'210 Operating Supplies (GENERAL) $154.18 470289144 City Hall Scraper Mat E1U0-431O0-417 Uniforms $11731 470299145 PVVUniforms E 100-*2100-223 Building Repair Supplies $33.09 470302384 FLOOR MATS E100-41e41'21O Operating Supplies (GENERAL) $47.83 470302395 City Hall Scraper Mat E1OO'431O0-z1V Operating Supplies (GEwERAL) $31.42 470302388 PVVTowels E 100-43100-417 Uniforms $8806 *70302388 PVVUniforms Total C/wTAS-4ro $584.49 Pai Cf��# 021175 10/10/2013 CO M CAST- 902943336 E1UU-431OU-321 Telephone $118.97 28688250 LAND LINE E1OU-4z1OO-321 Telephone $118.97 26683250 LAND LINE s1OD^1S41'321 Telephone $110.88 28683250 LAND LINE Total COMCAGT'oVu843J36 -------- $356.92 id Chk# 021176 10/10/2013 COON RAPIDS APPLIANCE E1OO-41941-4UU Repairs &Mahnt Cont (GENERAL $278.78 092513 CIVIC CENTER REFRIGERATOR REPAIR Total COON RAPIDS APPLIANCE -------- $276.78 aid Chk# 021177 10/10/2013 CRABTREE COMPANIES INC E10O-41S51-2O7 Computer Supplies $2.028.67 118319 ANNUAL LICENSE SUPPORT Total CnABTRss COMPANIES INC -�------ E 100-419*1-352 General Notices and Pub |mh $47.88 25802 TRIDEN 13-019 s1O0-41941-352 General Notices and Pub Info *47.96 25803 MEADOW CREEK 18-02U E 100-419*1'852 General Notices and Pub Info $41.98 25804 ORDINANCE/DENSITY Total ECM PUBLISHERS INC --x�------ � r.n0 E10O-418O0-38O Professional Sws(3ENERAL) $14508 r/u KREPG WETLAND VIOLATION a| ELM CREEK WATERSHED MGMTCOMM $145.80 E 100-41841-201 Postage/Shipping $3.04 R101093932 FINAL EXPIRED CONTRACT CORCORAN,MN 10/03n3 1:19 PN Page 3 *Check Detail Reg^ster@ October 2013 Check Amt Invoice Comment at FP MAILING SOLUTIONS $9.04 E100-41941-210 Operating Supplies (8ENER8L) $74.33 9245286480 SUPPLIES Total GRAINGER $74.33 E 100-42100-301 Prisoner $1.156.50 100083*757 BOOKING FEE E 100-42100-323 Radio Units $48.08 1008035243 RADO FEES Total HEwNCDSHER|FpMC1z9 -------- E1U0-421UO-22U Ropair/Naint Supply (GENERAL) $75.10 340101302 PRE PAID CAR WASH Total HOLIDAY STATION STORES -------- $75.10 EOO2-48*5O-3O4 Legal Fees $504.00 083113 UOL|TYPOL|CYv]RD|NANCE EUO1-494OV-384 Legal Fees $nO4�O 083118 UTILITY POL|CYK]RD|NANCE Total KENNEDY & GRAVEN, CHARTERED $1.Uoazm - E 100-42100-220 Rnpair/Maknt Supply V3ENEnAL Total nUSTOM SIGNALS, INC. pamChk# U211G0 1o/lUdU18� - s1O0-41951-oO7 Computer Supplies E 100-41851'500 Professional Gws(8ENERAL) Total LOFFLER '021187 10/10/2013 MARTENS BRAD $340.41 488002 #554 READ OUT UNIT REPAIR $3*O,41 s75.00 1520187 3PAMF|LTEx|NG $300.00_162O187 MONTHLY MAINTENANCE $375.00 E 100-41300-210 Operating Supplies (GENERAL) $1T52 098013 MILEAGE E1OO-4138U-210 Operating Supplies (3ENERAL) $50.00 093013 CELL PHONE REIMBURSEMENT o1OO'2170S Dependent Care F8AWithhold $660.00 093013 DEPENDENT CARE REIMBURSEMENT Total MARTENS BRAD $727.52 E 100-43108-210 Operating Supplies (GENERAL) $4.87 24745 SUPPLIES E1V0-431OO-223 Building Repair Supplies $11040 24808 SUPPLIES E1UO-431O0-228 Building Repair Supplies $23*.10 25057 SUPPLIES E 100-42100'200 Office Supplies (GENERAL) %4224 25108 SUPPLIES E 100-48100'223 Building Repair Supplies 25224 SUPPLIES Total MENxRDS MAPLE GROVE __$1o�7r $S5441---- Paid Chk# 021109 i E 100-43100-220 Repair/Maknt Supply V3ENERAL $184.47 912734 SUPPLIES E 10042100-220 Ropair/moin, Supply (GENERAL) $19�38 818818 0UA|RRLTER s1O0-48180-21U Operating Supplies (GENERAL) __$35.10 914185 SUPPLIES Total NAPA AUTO PARTS - CORCORAN $248-.95 CORCORAN, MN 10m3n3 1:19 Pw Page 4 *Check Detail Reg^ster@ October 2013 E1OO-4810n-2l0 Operating Supplies (GENERAL ) $148.24 118139 PUBLIC WORKS GARBAGE E10&452O0-3DO Utility & Services V3ENERAL $179.88 110399 PARKS GARBAGE s1OO-452UO'3OO Professional 8nm(GENERAL) $6*135 110398 COUNTRY DAZE E 100-419*1'380 Utility & Services (GENERAL) $192.52 128035109 CITY HALL GARBAGE E 100-43282'300 Professional Cnm(GENER8L) $5.495,05 128035109 MONTHLY RECYCLING E411'431V0-21U Operating Supplies (GEmERAL) $269.00 1854726 CONSTRUCTION WASTE Total RANDYSSAN|TAT|Ow *0.928.96 E10O-4155V-3OO Professional 8nmV3sNERAL E 100-41550-210 Operating Supplies (GENERAL Total ROLFER|onSUw ENTERPRISES INC E205-42100-210 Operating Supplies y3sNER*L Total SHI $4.10710 0e2413 MONTHLY ASSESSING FEE $152.80 082418 FORMS AND SUPPLIES ---------- $4,259,86 $8*2.18 B01327135 MDC DOCKING STATION $842.18 E1U0-48100-321 Telephone s1OO-4z1OO-321 Telephone E 100-43100-210 Operating Supplies (3ENERAL) Total SPRINT 6i`195 10/10/2013 STEELMAN, PAULA $39.64 3912833151*2 CELL8ERVICE $20.00 391283315142 CELLSERVCE $85,48 391283315142 CHARGERS E1O8-421O1-13O Employer Paid FSA $350.00 FOxRBMo202018F8AREIMBURSEMENT Total STEELMAN PAULA --------' . $350.00 E415-41SOOeaU Improvements Other Than 8ldgs $07.00 2*50 MEMORIAL BRICK Total STOwE& STEEL -------- $67.00 E100-42100-200 Office Supplies (GENERAL) $123,56 237881388 COPIER CORCORAN,MN 10/03n3 11ePm Page 5 *Check Detail ����~����� __' -_��- ---.~ October 2013 Check Amt Invoice Comment otal US BANKCORP EQUIPMENT FINANCE $123.56 E10O-421OO-321 Telephone $52.70 8711520818 CELL SERVICE Tom/ VsRIZDNVNRELESG --------- E1OO-48170-3O0 PmfeuionoSnm(GENERAL ) $6050 1304195 PAVEMENTMGMT/C|P s10O-43170-3U8 Professional Snm(GENERAL) $121.00 1304185 HENNEP|N COUNTY TRAFFIC s1UO-43170~3OO Professional Gmo(GENsRAL) %1.585.50 1304185 MNo0T STATE AID E1OU-431rO-J08 Professional 8nm(GENER^L) $210,00 1304195 MUN| STATE AID E1O0-43170-30U Professional Smo(GENERAL) $582.00 1304195 STORMVVATER8WCAGENERAL E 100-43170-300 Professional 8mo(GENER8L) $242.00 1304195 COUNCIL MEETINGS E 100-*3170'800 Professional Omn(GENERAL) $308.70 1304195 8ENER8LENG E4O1'*1888'30V Professional Smo(GENERAL) $6.649.00 1304190 SEVVcR8AATERPLANN|NG E411-431O0'3O3 Engineering Fees $3.478.85 1304197 ENGINEERING G50O'zU8OO Lannar Family ufBuilders $2.280,70 1504198 ENGINEERING G5VO'2O508 LennarPVD/EAVV *2.831.80 1304198 ENGINEERING EOOz'4V4b8-303 Engineering peo° $302.50 1304200 SOUTHEAST GEVVERxNATERPLANNING E0U1'48*OO-3V3 Engineering Fees $302.50 130*200 SOUTHEAST SEWER/WATER PLANNING E 602-49450'303 Engineering Fees _ $302.50 1304201 SOUTHWEST SEWER PLANNING Total VYENCK ASSOCIATES, INC. $19.418.15 E100w1941-21O Operating Supplies (GENERAL) $85.30 100113 OFFICE WATER Total WILLMAR WATER& SPAS $85.30 E 100-41941-380 Utility & Services y3ENERAL $201.07 092013 Total WRIGHT HENNEPIN SECURITY $201.67 10100 Farmers State Bank $94,259.22 Fund Summary 10100 Farmers State Bank 1OO GENERAL FUND *28,80084 zoo DWI FORFEITURE FUND $842.18 noo D0'EQU|PMENTCERTG $*4.815.80 401 TAX INCREMENT FINANCING $0.648.60 411 PUBLIC WORKS FACILITY $3.747.85 415 PARK CAPITAL FUND $*97.00 41O CAPITAL-EQUIPMENT CERTS $22J5 5O0 ESCROW HOLDING FUND $5.352�50 601 WATER $1.811.50 602 SEWER $1.314.00 $94.259.22 FIRE ALARM MONITORING City of Corcoran Consultant Summary 10/10/2013 Name Invoice Date Check # Amount Due Carson, Clelland & Schreder 09/26/13 21170 5,062.50 Kennedy & Graven 08/31/13 21184 1,008.00 Rolf Erickson Enterprises 09/24/13 21192 4,259.86 Wenck Associates Inc 10/03/13 21201 19,416.15 Total 29,746.51 HACity Hall Inform ation\CITY GOVERNMENT\Council, Commissions & Committees\Council Information\Council Claims\2013 Claims CARSON, CLELLAND &SCHREDER Attorneys o1Law 6300 SHINGLE CREEK PARKWAY STE 305 MINNEAPOLIS, N1N55430'219R (763)'581-2800 September 26, 2013 CITY OFCDRCORAN 820000RD118 CORCORAN.MN 55340 Professional Services Amount 9/5/2013 Conference with Brad regarding miscellaneous items: open meeting law issues, etc. 46.07 9/12/2013 Kreps: Review amended Complaint and Answer 98.33 Haglund Vehicle Violation: Conference with Attorney John Thames (pvnsooutohregarding 70.00 issues relating tnproperty 9/23/2013 Review ordinance 2O01'261 and comment to Jeanie 70.00 SUBTOTAL: [ 280.00 .Maple Hill Estates 8/28C2013 Review of file and prepare for meeting on 8/28/13 regarding Mobile Hope 140.00 8/29/2013 Mobile Hope: Staff meeting and conference with Brad Martens 350.00 8/30/2013 Mobile Hope: Review correspondence from Brian and Brad; review CD8GApplication 180.87 9/4/2013 Review information from Brad (CDBG) eligibility and revieiw definitions of inherently 238.33 na|iy|oua activity 9/18/2013 Mobile Hope/Maple Hill Agreements: revisions and send to Brad 210.00 SUBTOTAL: 1,120.001 .Ryan Companies Gift Letter Agreement 9/4/2013 Review file and send originals to title for recording 70.00 SUBTOTAL: 1 70.001 9/18/2013 Review documents from Attorney Larson and call hoKendra 140.00 CITY OF CORCORAN Page 2 Amount SUBTOTAL: 140.00] .Sewer and Water 9/3/2013 Prepare for staff meeting regarding policy and ordinance; review note for telephone call with 490.00 Tammy onS/4/13 9/4/2013 Review agreement with Maple Grove; conference with Fifield regarding TIF memorandum 93.33 and conference with Brad 9/5/2013 Review correspondence from Brian regarding Mobile Hope/CD8Geligibility 70.00 9/9/2013 Work nn ordinance update 140.00 8/1U/2O13 Amend ordinance and forward toBrad 210.00 9/12/2013 Work on amendment to Maple Hope Agreement; send to Brad with correspondence 326.67 9/18/2013 Revisions to ordinance and correspondence toBrad 140.00 9/23/2013 Prepare for 9/24/13 meeting 140.00 SUBTOTAL: 1,610.00] .Toomey/1 9400 Cty. Rd. 10 9/18/2013 Receipt and review Agreement and send to Brad with comments 70,00 SUBTOTAL: 1 70.00] Criminal 8/26C2013 Review discovery; review motion documents; review files in preparation for 8/27/13 31.67 calendar; memorandums to the files and instructions to legal assistant 8/27/2013 Prepare for and attendance at Arraignment, Pretrial and Court Trials calendar 142.50 Preparation for 8/28/13 calendar; review and note files; instructions to legal assistant 15.83 8/28/2013 Correspondence with defense attorneys and Court Administration; review discovery; review 47.50 criminal histories; note offers; prepare disposition letters; review files; preparation of correspondence to witnesses and victims; note files; jury trial preparation; instructions to legal assistant and memorandums to the files Attend Arraignment and Pretrial calendar 47.60 8/29/2013 Correspondence with probation officer, defense attorneys and Court Administration; review 31.67 discovery; review files in preparation for 9/3/13 calendar; nnha files and instructions to legal assistant 8/30/2013 Finish disposition letter; review files; correspondence to victims and instructions to legal 2375 assistant; select witnesses for upcoming contested matters; subpoena victims and prepare witness letters 0/3/2013 Attend Arraignment, Pretrial and In custody calendar 47.50 Pnapen* for 9/4/13 calendar; review and note files; instructions to legal assistant 39.58 9/4/2013 Assist with Arraignment, Pretrial and In Custody calendar 47.50 Attend Arraignment and Pretrial calendar 83.33 3/9/2013 Review discovery; review motions; review files in pnapenahnn for 9/1U/13 Arraignment and 47.50 Pretrial calendar CITY OF CORCORAN Page 3 Amount 9/9/2013 Prepare disposition letter regarding S/4/13 calendar; review files; correspondence hovictims 47.50 and instructions to legal assistant; selected witnesses for upcoming Rasmussens and jury trials; subpoena victims; prepare memorandums tn the files 9/10/2013 Attend Arraignment, Pretrial, Court Trials and In custody calendar 05.00 Prepare for 8/11/13 calendar; review/nohe0ee; instructions to legal assistant 47.50 9/11/2013 Preparation of one complaint 40.00 Attend Arraignment and Pretrial calendar 47.50 8/12/2013 Correspondence with defense attorneys, defendants, Court Administration; review 47.50 discovery; prepare disposition letter; review files; correspondence to victims and witnesses; note file and jury trial preparation; instructions to legal assistant Review voice mails regarding criminal cases 31.07 0/13/2013 Correspondence with defense attorneys, defendants and Court Administration; review 47.50 discovery; review motion documents; n*sennoh suppression issues and note files Complete 9/11/13 disposition letter; prepare memorandums to the files; prepare follow up 47.50 instructions for instructions to legal assistants; subpeona witnesses and prepare co/reapondanoetnvvitneaoes 9/17/2013 Correspondence with defendants, defense attorneys, Court Administration; review 47.50 discovery; note files; review files in preparation for 9/18/13 calendar; instructions to legal assistant Attend Arraignment and Pretrial calendar 47.50 8/18/2013 Attend Arraignment, Pretrial and In custody calendar; correspondence with witnesses and 95.00 victims 9/20/2013 PnapenoUon of one complaint 40.00 9/23/2013 Open criminal files, preparation of criminal complaints; preparation of cases for court 122.50 calendars, including court and jury trials; contact and notice to witnesses for trial testimony, prepare outgoing discovery requonts, complete incoming discovery requests for monthly period Open criminal files, preparation of criminal complaints; preparation of cases for court 14875 calendars, including court and jury trials; contact and notice to witnesses for trial testimony, prepare outgoing discovery nequeatn, complete incoming discovery requests for monthly period Open criminal files, preparation of criminal complaints; preparation of cases for court 28.25 ce|mndnro' including court and jury trials; contact and notice to witnesses for trial testimony, prepare outgoing discovery requests, complete incoming discovery requests for monthly period Open criminal files, preparation of criminal complaints; preparation of cases for court 72.80 calendars, including court and jury trials; contact and notice to witnesses for trial testimony, prepare outgoing discovery requests, complete incoming discovery requests for monthly period Review cases for charging and prepare decline letters 05.00 Preparation of one complaint 40.00 SUBTOTAL: [ 1.772,80] For professional services rendered $5'062.80 Previous balance $16'612.76 0/0/2013 Payment - thankyou ($7.900.02) CITY OF CORCORAN 9/16/2013 Payment - thank you Total payments and adjustments Balance due Page 4 Amount ($8.712.74) (816.61276) $5'OG2.8O I hereby declare under the penalties of perjury that the foregoing statement for legal services ks just and correct and that nn part thereof has beenpaid. Jeff A. Carson, City Attorney Kennedy & Graven, Chartered 200 South Sixth Street Suite 470 Minneapolis, MN 55402 (612) 337 -9300 September 20, 2013 Statement No. 116248 \ City of Corcoran, MN. 8200 County Road 116 Corcoran, MN 55340 -9303 Through August 31, 2013 CR100 -00004 General 1,008.00 Total Current Billing: 1,008.00 I declare, under penalty of law, that this account, claim or demand is just and correct and that n of it has been ONid. Signature of Claimant City nf Corcoran, MN. August 31.2O13 CR100-00004 General Through August 31.2O13 For All Legal Services AeFollows: Page:1 Kennedy & Graven, Chartered 200 South Sixth Street Suite 470 Minneapolis, MN 55402 Hours Amount 8/21/2013 MN| Phone conversation with J Carson regarding use oftiered 1.00 connection charges inCity; research same, 8%22/2013 K8N| Draft memo on connection charges; research on whether 2.10 city can charge higher connection charges for water and sewer within downtown area; office conferences with S Bubu[ CLoFewena regarding same. 8/23/2013 K4N| Draft memo regarding connection charges; circulate. 2,50 Total Services 180.00 378.00 450.00 Total Services and Disbursements: $ 1,008.00 / STATEMENT 24- Sep -13 ROLF ERICKSON ENTERPRISES, INC. SOUTWEST ASSESSING P O BOX 47841 PLYMOUTH, MN 55447 CITY OF CORCORAN 8200 Co. Rd. 116 CORCORAN, MN 55340 SEPTEMBER 2103 ASSESSING FEE COUNTY DATA FEE REVALUATION NOTICE POST CARDS POSTAGE FOR REVALUATION POST CARDS $4,107.00 $14.19 $39.67 $99.00 TOTAL $4,259.86 Wenck Engineers • Scientists Business Professionals October 3, 2013 Mr. Brad Martens City Administrator City of Corcoran 8200 County Road 116 Corcoran, MN 55340 Dear Brad: Wenck Associates, Inc. 1800 Pioneer Creek Center P,CI. Box 249 Maple Plain, MN 55359 -0249 (800) 472 -2232 (763) 479 -4200 Fax(763)479 -4242 wenckmp @wenck.com www.wenck.com Enclosed are our invoices for September 2013. Unbilled time for council meetings, travel, etc. totaled 12.3 hours last month and includes meeting time over an hour, travel time, and mileage costs. A few notes as we move forward on sewer. The costs for Southeast Sewer (Lift Station wetland and coordination work, etc.) is invoiced separately since it is part of the construction project and is not development related. The Southwest Sewer is for the Medina /Corcoran /Loretto work and should be charged to a utility fund, or transferred later as we get our accounts established. The summary table on the next page separates city expenses from escrow amounts. More details about each line item can be found on individual invoices. If you have any questions as you review this letter or our invoices, please feel free to contact me. Sincerely, WENCK ASSOCIATES INC. & Kent Torve, P.E. Principal TA2294- Corcoran \Invoices and Budget Tracker etc\2013 \September 2013 \September 2013 in•oice corer leuer.doca City of Corcoran September 2013 Invoices City Projects Invoice # Wenck project # Phase # Project name Amount Total 1304195 2294 -01 General Engineering Services 500 -01 General $366.70 500 -02 Council Meetings and Engineering Administrative $242.00 600 -01 Stormwater /WCA General Tasks $582.00 700 Municipal State Aid $210.00 700 -01 MnDOT State Aid $1,585.50 700 -02 Hennepin County Traffic Items $121.00 700 -05 Pavement Management and CIP $60.50 SUBTOTAL $3,167,70 1304196 2294 -10 Sewer and Water Planning 05 Preliminary /Special Survey $981.50 10 Project Closeout $103.30 17 Regional Development Engineering $5,564.80 SUBTOTAL $6,649.60 1304197 2294 -13 Public Works Building 18 Preconstruction Engineering & Permitting $290.40 20 2013 Construction Survey $3,188.45 SUBTOTAL $3,478.85 1304200 2294 -18 Southeast District Sewer and Water Project 100 Wetland Delineation and Application $605.00 SUBTOTAL $605.00 1304201 2294 -19 Southwest District Sewer Planning NA Southwest District Sewer Planning $302.50 SUBTOTAL $302.50 CITY PROJECTS TOTAL $14,203.65 SEPTEMBER 2013 TOTAL $19,416.15 T:\ 2294- Corcoranllnvoices and Budget Tracker etc \2013 \September 2013\ September 2013 in,oice cover leuer.docr -s V V enck Engineers • Scientists Business Professionals City of Corcoran September 2013 Invoices Invoice # Wenck Phase # project # s Project name Amount V Total 1304195 2294 -01 General Engineering Services 500 -01 General $366.70 Total project # 500 -02 Council Meetings and Engineering Administrative $242.00 NA Lennar Development (500- 20030) $2,28Q.70 600 -01 Stormwater /WCA General Tasks $582.00 $2,931.80 ESCROW PROJECTS SUBTOTAL $5,212.50 700 Municipal State Aid $210.00 700 -01 MnDOT State Aid $1,585.50 700 -02 Hennepin County Traffic Items $121.00 700 -05 Pavement Management and CIP $60.50 SUBTOTAL $3,167.70 1304196 [ 2294 -10 Sewer and Water Planning 05 Preliminary /Special Survey $981.50 10 Project Closeout $103.30 17 Regional Development Engineering $5,564.80 SUBTOTAL $6,649.60 1304197 2294 -13 Public Works Building 18 Preconstruction Engineering & Permitting $290.40 20 2013 Construction Survey $3,188.45 SUBTOTAL $3,478.85 1304200 2294 -18 Southeast District Sewer and Water Project 100 Wetland Delineation and Application $605.00 SUBTOTAL $605.00 1304201 ` 2294 -19 Southwest District Sewer Planning NA Southwest District Sewer Planning $302.50 SUBTOTAL $302.50 CITY PROJECTS TOTAL $14,203.65 1 ij _`T C r - y L:, ✓ ff', Y �(./�atppt�yr)� ydys. 1 ✓;alJh t�� g;r nN `t Z ,,// Zc c,SC"L; ix ✓ 15� -'' rr`r z ,�v�yUryryt ;: Invoice # Wenck Phase # Project name (Escrow Number) Total project # 1304198 2294 -17 NA Lennar Development (500- 20030) $2,28Q.70 1304199 2294 -17 -1 NA Lennar EAW (500 - 20308) $2,931.80 ESCROW PROJECTS SUBTOTAL $5,212.50 SEPTEMBER 2013 TOTAL $19,416.15 T:\2294- Corcoran \Invoices and Budget Tracker etc\2013 \September 2013 \September 2013 imoice covcr leucr.ducx Wene k Engineers • Scientists Business Professionals City of Corcoran - k-j 1,7­4 e-mail: acwLmbng@wwck,com 8200 County Road 116 Corcoran, MN 55340 Project 2294-01 Corcoran General Engineering Services Professional Services Through September 30, 2013 Phase 500-01 General Professional Personnel Hours Rate Amount Nelson, Susan 4.70 60.00 282.00 Torve, Kent .70 121.00 84.70 Totals 5.40 366.70 Total Labor 366.70 Phase Total $366.70 -------------------------------------------------- Phase 500-02 Council Meetings and Engineering Administrative Professional Personnel Hours Rate Amount Torve, Kent 2.00 121.00 242.00 Totals 2.00 242.00 Total Labor 242.00 Phase Total $242.00 - - - - - - - - - - - - - Phase 600-01 - - - - - - - - - - - - - - Stormwater/WCA General Tasks - - - - - - - - - - - - - - - - - - - - - - - Professional Personnel Hours Rate Amount Nelson, Susan 9.70 60.00 582.00 Totals 9.70 582.00 Total Labor 582.00 Phase Total $582.00 -------------------------------------------- Phase 700 MUNICIPAL STATE AID - - - - -- Professional Personnel Hours Rate Amount Terhaar, Edward 1.40 150.00 210.00 Totals 1.40 210.00 Total Labor 210.00 Phase Total $210.00 -------------------------------------------------- Phase 700-01 MnDOT State Aid INVOICES ARE DUE UPON PRESENTATION, Invoice balances not paid within 30 days of invoice are subject to 1-1/2% 18% annum interest/finance charge. Please reference the invoice number when sending payment. Federal Tax ID #41-1520095 Project 2294-01 Corcoran General Engineering Services Invoice 1304195 Professional Personnel Hours Rate Amount Claridge, Dale 10.50 151.00 1,585.50 Totals 10.50 1,585.50 Total Labor 1,585.50 Phase Total $1,585.50 ---------------------------------------------- Phase 700-02 Hennepin County Traffic Items Professional Personnel Hours Rate Amount Torve, Kent 1.00 121.00 121.00 Totals 1.00 121.00 Total Labor 121.00 Phase Total $121.00 — — — — — — — — — — — — — Phase 700-05 — — — — — — — — — — — — — — Pavement Management and CIP — — — — — — — — — — — — — — — — — -- Professional Personnel Hours Rate Amount Vander Top, Vincent .50 121.00 60.50 Totals .50 60.50 Total Labor 60.50 Phase Total $60.50 Total Invoice Amount $3,167.70 INVOICES ARE DUE UPON PRESENTATION. Invoice balances not paid within 30 days of invoice are subject to 1-1/2% 18% annum Page 2 interest/finance charge. Please reference the invoice number when sending payment. Federal Tax ID #41-1520095 INVOICES ARE DUE UPON PRESENTATION. Invoice balances not paid within 3O days of invoice are subject mz-z/2%z8%annum interest/finance charge. Please reference the invoice number when sending payment. Federal Tax IP#4z'152009S Wenck September 3U,2O13 Wand Amciates, Inc, Invoice No: 1304196 1800 Pioms Creek center P.n. Box mm Maple Plain, ww5smomo Brad Martens Fay (76a) e-rnall: accowfing@wenck^om City ufCorcoran 82OO County Road 116 Corcoran, MN 55340 Project 2394'10 Sewer and Water Planning Professional Services Through September 30, 2013 Phase 05 PRELIMINARy/SPEClALSURVEY Professional Personnel Hours Rate Amount Claridge, Dale 9/19/2013 6.50 151.00 981.50 Wetland monitoring report, review filed, photos, write up draft report, prepare photo documentation Totals 6.50 981.50 Total Labor 981.50 Phase Total $981.50 - - - - - - - - - - - - - Phase 10 - - - - - - - - - PROJECT CLOSEOUT - - - - - - - - - - - - - - - - - - - - - - - - - - -' Professional Personnel Hours Rate Amount Schmidt, Rowdy 9/5/2013 1.00 92.00 92.00 Meeting Totals 1.00 92.00 Total Labor 92.00 Reimbursable Expenses Mileage ' Reimbursable 11.30 Total Re|mbunsab|es 11.30 11.30 Phase Total $103.30 - - - - - - - - - - - - - - Phase 17 - - - - - - - - - - - - - Regional Development Engineering - - - - - - - - - - - - - - - - - - - - - -' Professional Personnel Hours Rate Amount Gehhart,Brandon 9/9/2013 1.00 125.00 125.00 Modeling Gebha¢Bmndon 9/10/2013 2.00 125.00 250.00 Modeling Gebhart,Bmndon 9/12/2013 3.00 125.00 250.00 Modeling Gehhart,Brandun 9/13/2013 2.00 125.00 250.00 Modeling Libby, Heather 9/4/2013 2.50 105.00 262.50 technical review INVOICES ARE DUE UPON PRESENTATION. Invoice balances not paid within 3O days of invoice are subject mz-z/2%z8%annum interest/finance charge. Please reference the invoice number when sending payment. Federal Tax IP#4z'152009S Project 2294-10 Sewer and Water Planning Invoice 1304196 Libby, Heather 9/6/2013 5.00 105.00 525J0 technical review Libby, Heather 9/10/2013 1.00 105.00 420.00 technical review Libby, Heather 9/13/2013 2.00 105.00 218.00 technical review Libby, Heather 9/17/2013 6.50 105.00 682.50 finalize regional deve|opementplan Libby, Heather 9/18/2013 2.00 185.00 210.00 regional devstudy Libby, Heather 9/26/2013 1.00 105.00 105.00 review maple grove agreement Torve, Kent 9/3/2013 2.50 121.00 302.50 Meeting, preparation of draft policy and hoUw*uptasks Tbme,Kent 9/9/2013 2.50 121.00 302.50 Pressure modeling review and tank needs byacreage Tumo,Ken1 9/17/2013 2.80 121.00 338.80 Water modeling results tank sizes and cost review Tnme,Kent 9/102013 3.50 121.00 123.50 Final report review, edits, costs and 0m City for council packet Toma,Kont 9/20/2013 3.50 121.00 423.50 Policy and Ordinance review edits and meeting Tome, Kent 9/27/2013 2.50 121.00 302.50 Cost review and survey nfCouncil Tome,Kont 9/30/2013 1.50 121.00 181.50 Policy draft 7 and survey Totals 48.80 5,564.80 Total Labor 6.664.80 Phase Total $5.564.80 Total Invoice Amount $6.649.60 INVOICES ARE DUE UPON PRESENTATION. Invoice balances not paid within ]Odays of invoice are subject to 1-1/2% 18% annum Page interest/finance charge. Please reference the invoice number when sending payment. Federal Tax ID #41-1520095 September 3C\2O13 Invoice No: 1304197 Brad Martens City of Corcoran 820U County Road 110 Corcoran, MN 55340 Project 2294-13 Public Works Building __ WV ITI "I Wend Agwiates, Inc. 1800 Pioneer Creek Center nu Box 249 Maple Plain, MN 55359-0249 (763) 479-4200 Ftx (763) 479-4242 Professional Services Through September 30, 2013 — — — — — — — — — — — — — — — — — — — — — — — — — — —' Phase 18 ENGINEERING &PERMITTING Professional Personnel Torve, Kent Totals Hours Rate Amount 2.10 121.00 290.40 2.40 290.40 Total Labor 290.40 Phase Total $290.40 -------------------------------------------------' Phase 20 2O13 CONSTRUCTION SURVEY Professional Personnel Mattson, Kevin 0uisborg,Jamn Totals Total Labor Reimbursable Expenses Equipment Rental Field Supplies -Reimbursable Mileage 'Reimbursable Total Reimbunaab|ms Hours Rate Amount 1.50 96.00 432.00 17.50 137.00 2,397.50 22.00 2,829.50 2,829.50 270.00 72.00 16.95 358.95 358.95 Phase Total $3.188.45 Total Invoice Amount $3.478.85 INVOICES ARE DUE UPON PRESENTATION, Invoice balances not paid within 30 days mr invoice are subject m1-1/2%z8%annum interest/finance charge. Please reference the invoice number when sending payment. Federal Tax lD#4z-1SZ0095 Invoice September 30, 2013 Invoice No; 1304198 Brad Martens City of Corcoran 8200 County Road 116 Corcoran, MN 55340 Project 2294 -17 Lennar Development Professional Services Through September 30, 2013 Professional Personnel Wen Ck Wenck Associates, Inc. 1800 pioneer Creek Center P.O. Box 249 Maple Plain, MN 55359 -0249 (763) 479.4200 Fax (763) 479.4242 e-mail: accountinliftenck.com INVOICES ARE DUE UPON PRESENTATION. Invoice balances not paid within 30 days of invoice are subject to 1 -1/2% 18% annum interest /finance charge. Please reference the invoice number when sending payment. Federal Tax ID #41- 1520095 Hours Rate Amount Heckman, Micah .50 78.00 39.00 Noreen, Adam .50 96.00 48.00 Terhaar, Edward 3.00 150.00 450.00 Torve, Kent 7.70 121.00 931.70 Ward, Jared 7.00 116.00 812.00 Totals 18.70 2,280.70 Total Labor 2,280.70 Total Invoice Amount $2,280.70 INVOICES ARE DUE UPON PRESENTATION. Invoice balances not paid within 30 days of invoice are subject to 1 -1/2% 18% annum interest /finance charge. Please reference the invoice number when sending payment. Federal Tax ID #41- 1520095 September 3C\2O12 -A.MdWenck Wend Amiates, Inc. Invoice No: 1304199 W) Pioneer Creek Center P.O. Box 249 Maple Plain, MN 55359-0249 Brad Martens Fax (763) e-rnaoacmunmwww"cUorn City ofCorcoran 8200 County Road 116 Corcoran, MN 55340 Project 2294'17-1 LennarEAW Professional Services Through September 30, 2013 Professional Personnel INVOICES ARE DUE UPON PRESENTATION, Invoice balances not paid within 30days of invoice are subject m1-1/2% 18% annum interest/finance charge. Please reference the invoice number when sending payment. Federal Tax lD#4/-z520095 Hours Rate Amount Denz Amy 12.50 106.00 1,325.00 Made1oyk,]effrey 4.50 114.00 513.00 Terhaar,Edwan] 1.00 150.00 150.00 Tome Kent 7.80 121.00 943.80 Totals 25.80 2,931.80 Total Labor 2.931.80 Total Invoice Amount $2.931.80 INVOICES ARE DUE UPON PRESENTATION, Invoice balances not paid within 30days of invoice are subject m1-1/2% 18% annum interest/finance charge. Please reference the invoice number when sending payment. Federal Tax lD#4/-z520095 Invoice September 30, 2013 Invoice No: 1304200 Brad Martens City of Corcoran 8200 County Road 116 Corcoran, MN 55340 Project 2294-18 Southeast District Sewer and Water Project Professional Services Through September 30, 2013 Phase 100 Wetland delineation and application Professional Personnel �Wend< Wenck Associates, Inc. 18D0 Pioneer Creek Center P.O. Box 249 Maplee Plain, MN 55359-0249 (763) 479.4200 Fox (763) 479-4242 e-mail: accounting0wenck.com Hours Rate Amount Torve, Kent 5.00 121.00 605.00 Totals 5.00 605.00 Total Labor 605.00 Phase Total $605.00 Total Invoice Amount $605.00 INVOICES ARE DUE UPON PRESENTATION, Invoice balances not paid within 30 days of invoice are subject to 1-1/2% 18% annum interest/finance charge. Please reference the invoice number when sending payment. Federal Tax ID #41-1520095 I invoice—] September 30,ZU13 Invoice No: 1304201 Brad Martens City of Corcoran O2OO County Road 116 Corcoran, MN 55340 Project 2294-19 Southwest District Sewer Planning Professional Services Through September 30, 2013 Professional Personnel Hours Rate Tome Kent 2.50 121.00 Totals 2.50 Total Labor 1!1�m'111M� i rim I Wenck Azodabts, Inc. 18W Pioneer Creek Center poBox 249 Maple Plain, MN 55359-0249 (763) 479-4200 Fax (763) 479-4242 Amount 302.50 Total Invoice Amount $302.50 INVOICES ARE DUE UPON PRESENTATION. Invoice balances not paid within 30 days of invoice are subject to 1-1/2% 18% annum interest/finance charge. Please reference the invoice number when sending payment. Federal Tax ID #41-1520095 STAFF REPORT Document No. 10a. Council Meeting: October 10, 2013 Prepared By: Brad Martens Topic: Sanitary Sewer and Water Services Action Required: Direction Summary: At the September 26, 2013 City Council meeting staff presented a draft policy and ordinance for sanitary sewer and water services. The City Council had a long discussion and directed staff to develop a survey with some of the key decisions and options available for the Council to review. That survey was sent to the Council on Wednesday, October 2" and is attached to this report. Completed surveys are not due until Monday, October 7th so are not included in this report. Staff will present the results at the City Council meeting and facilitate a discussion. Also attached to this report is a memo from City Engineer, Kent Torve that includes a brief financial analysis of extending service to neighborhoods near the proposed Lennar development. The main takeaway is that the Lennar development would be self - sustaining financially and connecting additional neighborhoods is not required to cash flow the system. Financial /Budget: The policy and ordinance outline requirements for properties within the City to pay availability fees and connection fees for the use of the sanitary sewer and water system. These fees offset the expenditures needed to develop and maintain the system. Revenues and expenditures for the system will be separate from the general fund and not be a part of the property taxes paid to the City. Options: 1. Comment on the proposed policy and ordinance related to sanitary sewer and water services. Recommendation: Comment on the proposed policy and ordinance related to sanitary sewer and water services. Council Action: Comment on the proposed policy and ordinance related to sanitary sewer and water services. Page 2 Attachments: 1. Sanitary Sewer and Water Services Survey 2. October 1, 2013 Memo from Kent Torve — Financial Analysis for Defining Trunk Availability CITY OF CORCORAN 8200 COUNTY ROAD 116, CORCORAN MN 55340 763.420.2288 — OFFICE 763.420.6056 — FAX E -mail — general &i.corcoran.mmus / Web Site — www.ci.corcoran.mn.us Please complete this survey and return to Brad by end of day Monday, October 7th Council discussed draft policies and ordinances at the meeting on September 26th. The discussion tackled numerous issues and staff offered to develop a survey in order to receive Council input on various options for requirements within the policy and ordinance. Council members should read through the requirement options described below and agree or disagree with the statements. Staff will then summarize the data and present to Council at the October 10th meeting. Section 1: New Construction Toxic 1. Immediate Connection for New Construction Any new property constructed (residential or commercial) must connect immediately to the water and sewer system if available. Agree_ Disagree_ Topic 2. Availability Charges Paid at Final Plat Any new property constructed (residential or commercial) where water and sewer service is available must pay Trunk Line Availability Charges (TLAC) at the time of final plat. Agree_ Disagree Topic 3. Connection Charges Paid at Building Permit Any new property constructed (residential or commercial) where water and sewer service is available must pay connection fees at time of building permit. Agree_ Disagree Section 2: Existing Structures Topic 1. Are both water and sewer required at same time? Any property receiving either water or sewer shall be required to connect to both utilities at the same time. Agree_ Disagree Topic 2. Are existing wells allowed to remain in service? Properties will have existing wells in place after water service is available. Options for requirements are outlined below. Residential Option A (lenient) Any residential property with an existing well that is also connected to City water can continue to utilize the well for lawn, landscaping or other animal or property uses "forever ". Agree_ Disagree Option B (triggering event) Residential properties with an existing well that are connected to City water can continue to utilize the well for lawn, landscaping or other animal or property uses until a triggering event. 1. Well fails Agree_ Disagree_ 2. Well head protection program in place Agree_ Disagree_ 3. City infrastructure in place (water tower, treatment facility) Agree_ Disagree_ Commercial Option A (lenient) Any commercial property with an existing well that is also connected to City water can continue to utilize the well for "forever ". Agree_ Disagree Option B (triggering event) Commercial properties with an existing well that are connected to City water can continue to utilize the well until a triggering event. • Well fails Agree_ Disagree • Well head protection program in place Agree_ Disagree • City infrastructure in place (water tower, treatment facility) Agree_ Disagree Topic 3. TLAC Charges for Different Parcel Types Some development is fairly straightforward on how TLAC will be charged. These include the current approach that "new development is per buildable acre" and "existing house" is per parcel. Some variations will occur as the City moves forward with utilities. Farmland It may help to visualize 40 acres of farmland in hay or row crops without a residence for following input. • Farmland parcel should be charged one TLAC (not per acre) Agree_ Disagree • Farmland parcel should be charged per acre Agree_ Disagree • Farmland parcels should be exempt Agree _ Disagree_ Existing Commercial It may help to visualize 3 acres of existing industrial /commercial in Downtown which is a low user of sewer. • Commercial parcel should be charged one TLAC (not per acre) Agree_ Disagree_ • Commercial parcel should be charged per acre Agree_ Disagree_ If a Commercial parcel is only charged one TLAC initially, the following triggers should be considered for charging the remaining TLAC. • No trigger. The parcel TLAC is considered paid in full Agree_ Disagree CITY OF CORCORAN 8200 COUNTY ROAD 116, CORCORAN MN 55340 763.420.2288 — OFFICE 763.420.6056 — FAX E -mail — general &i.corcoran.mmus / Web Site — www.ci.corcoran.mn.us • Any site modifications requiring a grading or building permit Agree_ Disagree • Only significant building modifications that expand operations Agree_ Disagree • Only a complete tear down and redevelopment Agree_ Disagree Topic 4. Define Availability for Trunk Charges This topic of when utilities become "available" was a significant discussion for existing residences and parcels. A range of choices from a strict interpretation (contact with lot line) to loose interpretation (sewer district) has been summarized for input below. Option A (lenient) Existing properties should not be charged TLAC until physical connection, even if trunk line abuts property and is not utilized for many years. Agree_ Disagree Option B (abutting trigger) Charge TLAC when physically abuts a property (not dependent on connection) Agree_ Disagree Potential Exemotion Farmstead on parcel over 20 acres would be exempt since house could be located significant distance away from trunk line. Agree_ Disagree Option C (similar to B but adds public ROW) Charge TLAC when physically abuts a property, or when trunk line is located within public property connected to subject property (i.e. in street ROW next to a property) Agree_ Disagree Option D (abuts a neighborhood) Properties are charged TLAC when located close enough to their parcel where lateral could be reasonably extended with a standalone project. Example, when Lennar extends to touch Hunter neighborhood, should TLAC be charged to entire Hunter neighborhood? Agree_ Disagree Modification to D Staff should set a physical distance, (such as one manhole distance from a trunk line (500 feet) as a criteria for determining availability. From example above, only those properties within Hunter neighborhood within 500 feet from end of pipe shall be charged TLAC. Agree_ Disagree Option E (expansive) All properties within a trunk line service area should be charged upon trunk line construction. (All the area serviced by Lions Park lift station will be charged TLAC for sewer, regardless of location). Agree_ Disagree Topic 5 — Requiring individual connections in existing residential neighborhoods Option A (lenient) Only require connection when requested by homeowner. Therefore, even with a failing system, a resident could utilize a containment tank and pumping to forego hookup. Agree_ Disagree Option B (strict) Require a set deadline to connect an individual house, regardless of need. • Must connect within 5 years Agree_ Disagree • Must connect within 10 years Agree_ Disagree • Must connect within 15 years Agree_ Disagree • Must connect within 20 years Agree_ Disagree Option C (event based) Require individual house connection upon a defined need or triggering event. • Sale of property Agree_ Disagree • Failing septic Agree_ Disagree • Modification to house requiring septic modification Agree_ Disagree Potential Exemption for septic failure or modification • Farmstead on parcel over 20 acres would be exempt since additional property for septic is presumably available Agree_ Disagree_ Financing Financing Options for Connection Charges • Require payment within 6 months of connection Agree_ Disagree • Allow deferral of costs for 5 years Agree_ Disagree • Allow deferral of costs for 7 years Agree_ Disagree Financing Options for deferrals • Charge residents the current City bond rate for financing Agree_ Disagree • Charge current bond rate + 1% for 10 year financing Agree_ Disagree • Charge current bond rate + 2% for 10 year financing Agree_ Disagree CITY OF CORCORAN 8200 COUNTY ROAD 116, CORCORAN MN 55340 763.420.2288 — OFFICE 763.420.6056 — FAX E -mail — general &i.corcoran.mmus / Web Site — www.ci.corcoran.mn.us Topic 6 — Requiring entire neighborhoods to hookup Existing neighborhoods will have different amount of properties with failing septics. Therefore, a framework should be established to guide existing residents and staff. Option A City will not initiate a project unless a majority of the neighborhood requests project. Properties with failing septic could 'go it alone' (see Topic 7). Agree_ Disagree Option B City will initiate a project when 33% of properties have failing systems within a serviceable neighborhood. Agree_ Disagree Option C City will initiate a project when 50% of properties have failing systems within a serviceable neighborhood. Agree_ Disagree Option D City will initiate a project when the street reconstruction occurs. Agree_ Disagree Financing Financing Option A City will assess 100% of utility costs to bring service to property line. Street costs will be discussed separately in policy document. Agree_ Disagree Financing Option B City will assess 70% of utility costs to bring service to property line. (Streets again separate). Agree_ Disagree Financing Option C City Council will set percentage assessed at time of project Agree_ Disagree Topic 7 -- Outlier property hookup for sewer Council discussion included a hypothetical scenario of a single parcel within a neighborhood that was removed from the service line. Physical Location A most northerly parcel on Hunter requests sewer service, however the closest service line is in Hackamore (hypothetical layout). Engineering Option Service can be provided with a low pressure system which is a tank, pump, and small diameter pressure line usually directionally bored in easement adjacent to street. This requires minimal or no street repair and homeowner retains has pump ownership. Eventually the gravity system would be installed and the owner would abandon the low pressure system and connect with gravity. Option A (strict) City requires installation of low pressure service based on the triggering events. Agree_ Disagree Option B (collaborative) City offers installation of sewer service based on the triggering events. Agree_ Disagree Option B (lenient) City does not offer this option, requires pumping until gravity system. Agree_ Disagree Financing Financing Option A The system is viewed as temporary until gravity is installed, however, the system costs for construction, will be 100% assessed (i.e. $15,000 cost = $15,000 assessment) Agree_ Disagree Financing Option B Costs will be 70% assessed or another lesser value. Agree_ Disagree Financing for Future Gravity System Option A (no relief) Costs for the ultimate gravity system will be assessed again to the property owner. (Gravity system = $20,000 + previous low pressure $15,000 = $35,000 ultimate homeowner costs). Agree_ Disagree Financing for Future Gravity System Option B (future relief) Costs for the ultimate gravity system will be credited to the parcel for the low pressure assessment. (Gravity system = $20,000 - low pressure $15,000 = $5,000 gravity additional to the $15,000 previous low pressure cost paid. This option equals ultimate $20,000 homeowner costs). Agree_ Disagree g��Z Wenck TO: Brad Martens, City Administrator FROM: Kent Torve, P.E. DATE: October 1, 2013 SUBJECT: Financial Analysis for Defining Trunk Availability Wenck Associates, Inc. 1800 Pioneer Creek Ctr. P.O. Box 249 Maple Plain, MN 55359 -0249 (763) 479 -4200 Fax (763) 479 -4242 E -mail: wenckmp @wenck.com Background At last Thursday's Council meeting a policy discussion occurred on defining "availability" of sewer and water. The definition of this term will guide staff on what properties will be charged as trunk systems are extended towards, and by, existing residences. Current Approach New development is charged Trunk Line Availability (TLAC) on a per acre basis, since these fees represent cost recovery and additional capital funding of the major components of the system and are designed on full use of the developable property. The developer can include the costs in the financial pro forma and new development benefits from higher density of urbanized development. Existing residences are charged "each parcel" since the typical large lots for ISTS / well development would be burdensome for a per acre charge. Revenue Analysis A simplified revenue analysis was performed which consists of: • Attached figure showing areas served by Southeast Trunk system • Lot count of existing parcels in areas that could be served by extending laterals off the trunk • Lot count of Lennar development per the concept plan. Results The system buildout and financial results show the following: • Additional fees are not required to complete the Lennar project. Lennar is contributing offsite funds and building trunk system through its development in addition to per acre fees. • Connection fees and revenues from water and sewer sales are not required to complete the system or fund initial operations. • Expanding TLAC charges to existing neighborhoods could add 99 units to the 212 acres from Lennar. • A definition of "availability" could include some, none or all of the 99 units shown on the attached figure. More detail and analysis can be provided for the October 24 `h meeting if requested. Table 1. Basic Financial Projection of Revenues for for "Availability" As Lennar Utilities are Extended Neighborhood Sewer Water $3,075 $4,450 Total Acre Lennar 212 $651,900 $943,400 $1,595,300 Existing Neighborhoods Each Sturbridge 21 $64,575 $93,450 $158,025 Country Seasons Est. 20 $61,500 $89,000 $150,500 Hunter 41 $126,075 $182,450 $308,525 101 /Hackamore 6 $18,450 $26,700 $45,150 CR 101 11 $33,825 $48,950 $82,775 99 $304,425 $440,550 $744,975 Totals 311 $956,325 $1,383,950 $2,340,275 SE -W SE -AV SE -Y N a SE -AC Fuguru Co Elm Crreel STAFF REPORT Document No. 11 a. Council Meeting: October 10, 2013 Prepared By: Mike Pritchard Topic: Survey Reimbursement Request Action Required: Direction Summary: Mr. Henry, 19701 Jackie Lane, requested that the City compensate him for costs incurred for a property survey. The survey cost is $1,050. It is Mr. Henry's position that the City did not clearly identify to him that he could not complete his project, a "lot split,' and that had he been aware, he would not have sustained these costs. The City disagrees with Mr. Henry's claim. In order to assist with the discussion the following timeline has been developed: Late August: Mr. Henry's Realtor called to inquire about the process for "splitting" and selling a portion of this property to the abutting neighbor. A brief summary was given. Late August / early September: Mr. Henry stopped in City Hall to discuss his property. The assumption was that he would be adjusting lot lines to sell property to his neighbor. Mr. Henry stated that he had combined the lots in 1992 and he would like to "split" (re -plat) and sell the second parcel as a buildable lot. I asked for time to review this further and involve the City Planner. September 3: We could not locate a planning project file. I confirmed with Planner Lindahl that typically, unless building rights are specifically reserved, building rights are given -up during lot combination. On September 3 a voice message was left for Mr. Henry at 763- 428 -4850. September 6: With the suggestion of Planner Lindahl, we were able to locate the resolution for the lot combination: Resolution 1992 -49. In this resolution, it clearly states that a re- division would not be allowed. A message explaining this was left for Mr. Henry on September 6, at 612- 270 -9709. September 26: We did not receive any more correspondence from Mr. Henry until September 26 when Mr. Henry's wife contacted the City to start the application process. It was stated that Page 2 they were not aware of any of the City's findings or voice mails. A meeting was set for October 2 to discuss the issue. A meeting was held on Wednesday, October 2, 2013. In attendance were: Mr. Paul Henry; City Administrator Brad Martens; City Planner Kendra Lindahl; and Code Compliance Official Mike Pritchard. At that meeting Mr. Henry stated that he never received any voicemails. He also stated that Mike Pritchard never told him he could not split the property and later said that Mike Pritchard told him he could split the property. Staff feels strongly that the voicemails were left and has phone records attached showing the number dialed and duration of the phone call. Furthermore staff disagrees that Mr. Henry was never told he could split his property. Mr. Henry was informed that in order to receive any reimbursement Council approval would be required and that the staff recommendation would be to deny the request. Mr. Henry asked that the City Council consider his request at the October 10, 2013 City Council meeting and stated he would be present. Financial /Budget: Mr. Henry is requesting the City reimburse him for $1,050. Options: 1. Deny the reimbursement request from Mr. Paul Henry. 2. Approve the reimbursement request from Mr. Paul Henry. 3. Send back to staff for further review. Recommendation: Deny the reimbursement request from Mr. Paul Henry. Council Action: Consider a motion to deny the reimbursement request from Mr. Paul Henry. Attachments: 1. Aerial view of property 2. Resolution 1992 -49 3. Phone call records Interactive Map}�q;' Welcome Results Links Tax Information View oblique imagery (Bins maps) Survey Documents Find a PID or ar aWrass on L o asp PID: 0111923220024 19701 Jackie La Corcoran, MN 55374 OwneriTaxpayer Owner: Paul J & Marguerite M Henry PAUL & MARGUERITE Taxpayer: HENRY 19701 JACKIE LA ROGERS MN 55374 Tax District School Dist: 877 Sewer Dist: Watershed Dist: 0 Parcel Parcel Area: 3.02 acres 131,369 sq k Torrens[Abstract: Abstract Addition: Gordons Country Estates Lot: 010 Block: 003 Metes & Bounds: Lots 1 O And 11 Blk 3 Tax Data (Payable 2013) Market Value: 5227,001) Total Tax: 53,209.50 Property Type: Residential Homestead: Homestead Year Built: 1975 Saks Sale Code: Sale Price: Legend Measure V 45r 1782 -- q1 FILE COPY Search Map Advanced Searcl 1 W V21 9, ?,l'? l.'33Jx4 RESOLUTION 1992 - 49 COPY A RESOLUTION APPROVING THE PAUL HENRY LAND COMBINATION NO. 92 -02, THE COMBINATION OF LOTS 10 AND 11, BLOCK 3, GORDON'S COUNTRY ESTATES, INTO A SINGLE PARCEL, LOCATED AT 19701 JACKIE LANE, PID #01- 119 -23 22 0022 AND PID #01- 119 -23 21 0017. WHEREAS, Paul Henry has made application to combine Lots 10 and 11, Block_ 3, Gordon's Country Estates into one single parcel, located at 19701 Jackie Lane; and WHEREAS, on May 7, 1992, the Planning Commission recommended approval of the land combination with condition. NOW, THEREFORE, BE IT RESOLVED by the City Council of the City of Corcoran that Land Combination No. 92 -02, a request by Paul Henry to combine Lots 10 and 11, Block 3, Gordon's Country Estates, into on single parcel is hereby approved with the following condition: 1. That the owner acknowledges that a re- division of these lots would not be allowed under the current provisions of the Corcoran Zoning Ordinance. Moved by member Schleif, seconded by member Kluck. The following voted in favor of said resolution: Schutte, Schleif, Kluck, Ruppert. The following voted against the same: Becker. Whereupon said Resolution was declared carried. Dated this 14th day of May, 1992. Mayor i MWi V' I I 1411 fie, , Windows Dial Call Tools View Help I% Primary Phone - 4 Ina Meeting - In Windows - °I& Brad M f, Jill S & Jeanie Mike 0 Kendra M Metro West M Jeff Carson lid Wenck ! Assessor Kendra Metro West Jeff Carson '"Venck Assessor ! Make's Cell �I& Conf Room Paula S Sean S John •tp Ryan I& Steve & Josh S Jesse ^S Duane °b Brian F t Dan D ifb Joe ZZ x:46 Kevin 6S Roxanne Brian D i& Jim K +f6 Gregg F # HCSr7 Disp Tran HC Disp ! HC Clerk l Shop ! Pat M ! Brandon ! Jeff S ! Clyde ! Eric Tran Pat M Tran Brandon Tran Jeff S Tran Clyde Tran Eric lEnter a name or number There are no active calls at this time ,10 7634284850 R./To — Name Phone Nuni r Stmt T,rr,e Duration CA Note Tnnic ' Ace t Code ■ Transferred Paul & Marguerite Henry (763) 428-4850 912512013 3:.43 PM 01 :00 Con-cast PRI ... To Paul & Marguerite Henry (76 -3) 428 -4850 91312013 1:35 PM 00:56 Comcast PRI ... I� Windows Dial Call Tools View Help qPrimary Phone- A& Ina. Meeting- lin Wind.ows- I Brad M ''(L Jill S Jeanie !dike B Kendra ER Metro West a Jeff Carson M Wenck M Assessor Kendra Metro West Jeff Carson Venck= essr_.r ! Mike's Cell ((b Conf Room Paula % Sean John Aa_� Ryan ,IL Steve & Josh '& Jesse I& Duane Brian F ILDanD -jb Joe Z Ik Kevin rIb Roxanne '•k Brian D * Jim K fi Gregg F $ HCSO Disp IShop L7� Pat M vY Brandon S Jeff S M Clyde S Eric Tran Pat M Tran Brandon Tran Jeff S Tran Clyde Tran Erie There are no active calls at this time History P 612-270-9709 FromlTo Name To Phone Number 5ffirtTime Duration Call Note Trunk AocountCode {612) 277 -9109 916/2013 3:02PM 01:33 Comcast PRI ... Tran HC Dip M HC Clerk Wenck Associates, Inc. 1800 Pioneer Creek Ctr. P.O. Box 249 Maple Plain, MN 55359 -0249 479-4 Wenck Fax ( 763) 479-4242 E -mail: wenckmp @wenck.com TO: Brad Martens, City Administrator FROM: Kent Torve, P.E. City Engineer RE: Regional Development Study -- Final DATE: September 18, 2013 Council Action Requested • Motion to approve the report which includes per acre development charges for sewer and water Summary The Regional Study is submitted for adoption. The draft was provided in June 6, 2013 and utilized for financial pro forma for the 5 -year plan and the Lennar Development discussions. A final review was performed that modified the report as follows: Water • Upgraded a line to 24 -inch water main for the Maple Grove connection o The Master Water Plan did not have any 24 -inch water main in the SE area • Upgraded the CR 116 water main from St. Thomas location to the south to the west edge of Lennar to 12- inch o Originally a 10 inch main the upgrade resulted from pressure and fire flow modeling • Added easement costs to the water system. o Draft report assumed costs were covered in sewer fee, however it was determined the water main will travel independently of sewer. • Decreased the required future City water supply from 1.0 MGD to 0.7 MGD o The City will require 5.7 MGD at ultimate buildout, with 5 MGD from Maple Grove. The original report had listed 1.0 MGD as the City requirement. Sewer Increased a few sewer pipe sizes Updated the sewer costs to include the Lions Park location Transportation The transportation effort was minor for this revision since the approach will be to calculate impacts in the future on a subdistrict and /or per development basis. This "per project approach" is being utilized on Hackamore Drive for Lennar. Transportation costs are difficult to justify on a large area basis if charges are made "per acre" over several years. Developable Acres The text also notes (for future reference) that developable acres for trunk charges are calculated on pre- development basis, not the post development basis that will be utilized to calculate net density (see page 3 -1). Results Overall the trunk charge change was minor, water was decreased $150 per acre from $4,600 to $4,450 and sewer increased $75 per acre from $3,000 /acre to $3,075 /acre. - Wenck Wenck File #2294 -10 SEPTEMBER 2013 Engineers • Scientists Business Professionals unmatched Service trateqic Regional Development Study Prepared for: CITY OF CORCORAN 8200 County Road 116 Corcoran, MN 55340 Prepared by: WENCK ASSOCIATES, INC. 1800 Pioneer Creek Center P.O. Box 249 Maple Plain, Minnesota 55359 -0249 (763) 479 -4200 Table of Contents 1.0 EXECUTIVE SUMMARY .................................................................. ............................1 -1 2.0 INTRODUCTION ............................................................................ ............................2 -1 3.0 LAND AREA REVIEW ...................................................................... ............................3 -1 4.0 SANITARY SEWER ......................................................................... ............................4 -1 4.1 Flow generation ...................................................................... ............................4 -1 4.2 Cost Estimate and Trunk Charge ............................. Error! Bookmark not defined. 5.0 WATER ......................................................................................... ............................5 -1 5.1 General .................................................................................... ............................5 -1 5.2 Cost Estimate .......................................................................... ............................5 -1 6.0 TRANSPORTATION ........................................................................ ............................6 -1 6.1 City street system ................................................................... ............................6 -1 6.2 Cost Estimate .......................................................................... ............................6 -1 TABLES 1 Sanitary Sewer Trunk Cost Estimate 2 Trunk Water System 3 Transportation System Trunk Cost Estimate 1 Trunk Sanitary Sewer System 2 Trunk Water System and SE District Study Boundary 3 City Street Subdistrict System APPENDICES A Trunk Sanitary Sewer Figures and Design Data (2030 Comprehensive Plan) B Trunk Water System Figure (2030 Comprehensive Plan) C Subdistrict Areas for Sewer and Water and Transportation (2030 Comprehensive Plan) D Distribution Model T: \2294- Corcoran \10 -Sewer and Water Planning (TIF Districts) \2013 Engineering and Planning \final report \final Regional Development Study.docx i September 2013 1.0 Executive Summary The Regional Development Study was conducted to analyze and present infrastructure costs for the sewer, water, and City transportation system in southeast Corcoran. This area will be the first to receive municipal services and implement the 2030 Comprehensive Land Use Plan. The study reviewed costs for wastewater collection systems, water supply storage and distribution systems, and transportation costs for the major City roadways. It is recommended the Council review this report and utilize these costs in setting area and access charges for new development. The report is of significant use in setting policy and can be updated over the years as development occurs. 1 -1 T: \2294- Corcoran \10 -Sewer and Water Planning (TIF Districts) \2013 Engineering and Planning \final report \final Regional Development Study.dou September 2013 2.0 Introduction Corcoran's 2030 Comprehensive Plan (June 2011) identifies the land use for the south east portion of the City. The land use in this area was first identified as being served by municipal sewer service in the 2020 plan and the first installation of trunk sewer and water via Tax Increment Financing was completed in 2012. This TIF project has modified the overall system, also a result of Metropolitan Council Environmental Services (MCES) locating a lift station in Corcoran, rather than a gravity sewer system. The 2030 guided land use is the basis for calculating flows and density for sizing of infrastructure facilities to accommodate for Corcoran's growth. This calculation was first approached in 2005 with the completion of the "Comprehensive Utility Plan." An update of the calculation and costs of the infrastructure in the area known as "Southeast (SE) Corcoran" was the focus of this report. 2 -1 T: \2294- Corcoran \10 -Sewer and Water Planning (TIF Districts) \2013 Engineering and Planning \final report \final Regional Development Study.dou September 2013 3.0 Land Area Review The 2030 Plan proposed land uses are shown in Appendix A. There are eighteen (18) proposed land uses however, each land use does not generate a sewer flow or water demand (i.e. wetlands, ROW, etc.) therefore the land uses were compiled into four groups. • Public (Semi Public, Open Space, and Golf Course) • Existing Residential • Undevelopable (wetlands, areas below 100 -year water elevation and right -of -way or easements for existing public streets) • Developable (Rural /Ag Residential, Ag Preserve, Low Density Residential, Med Density Residential, High Density Residential, Mixed Residential, Light Industrial, Business Park, Commercial, and Mixed Use) The purpose of this categorization is to quantify the developable area for the SE district as this land base will generate sewer flows, water demand, and transportation trips for needed infrastructure. Note: Council recently modified the description of developable area for net density calculation, however for utility fee purposed the developable area calculation remains as described above. The SE service boundary for this report (sewer and water) is shown as the red boundaries on Figures 1 and 2. The SE district was further divided into sub - districts for sewer (Appendix A), which allowed for more detailed analysis of land use to create wastewater flows. It should be recognized that the SE boundary in this report does not include the farthest southwest nodes SE 29 and 5E -30 (Appendix A) which could be added at a later date. 3 -1 T: \2294- Corcoran \10 -Sewer and Water Planning (TIF Districts) \2013 Engineering and Planning \final report \final Regional Development Study.dou September 2013 The subdivision of the SE service area was based on several factors including: • Topography /natural features • Transportation corridors and • Proposed Land Uses The "developable area" was determined by subtracting the areas identified in the 2030 Plan as undevelopable, public, and existing residential from the overall total area. Existing residential properties were excluded from the calculations since timing for future connection to the system and /or redevelopment is unknown. Over time these parcels may connect and the benefit received by these parcels will be addressed by City policy. The total acreage for land use in the SE service area (for sewer and water) is as follows (Figure 1 and Appendix C): Total Area 4,600 acres Minus Undevelopable 1,094 acres Public 163 acres Existing Residential 443 acres Total Developable 2,900 acres Transportation utilized a smaller analysis area for reasons discussed in Section 6. Future updates to this report will be warranted and necessary as the system is built out and the densities /demands and construction costs change over time with development of the SE area. T: \2294- Corcoran \10 -Sewer and Water Planning (TIF Districts) \2013 Engineering and Planning \final report \final Regional Development Study.dou 3 -2 September 2013 4.0 Sanitary Sewer 4.1 FLOW GENERATION The trunk sanitary sewer proposed to serve SE Corcoran into the Elm Creek Interceptor through Maple Grove is shown as a red boundary on Figure 1. As noted previously, the primary MCES system connection was planned to be a gravity interceptor at the City border south of Lions' Park. The connection location was modified in 2011 to the proposed MCES lift station north of CR 10. The collection system assumed in this report is based on the MCES lift station connection point. Options to modify the collection system for areas south of Lions' Park are included. The average wastewater flows generated within each of the sewer subdistricts were based on the corresponding land use from the 2030 Plan (Appendix A). The estimated average flows (see summary table on next page) were then multiplied by the developable acreages for each land use category. The table also incorporates acreages enabling a flow summary for SE Corcoran. 4.2 COST ESTIMATE AND TRUNK CHARGE The proposed trunk sanitary sewer system is shown in Figure 1. The current plan includes a total of two City lift stations (City Hall /Downtown LS — node 5E -14; Lennar LS — node 5E -24), which ultimately connect into the MCES lift station at Node SE -21. The costs for the approved lift station to service Lennar (at Lions Park) are included in this study. The total collection system cost estimate was based on linear feet of trunk pipe, estimated depths (greater depth is a higher cost), and assumed manhole spacing of approximately 300'. Right of way or easement costs were included for 10% of the length, assuming some trunk line is out of street ROW. The development of a typical trunk system is within public right of way or 4 -1 T: \2294- Corcoran \10 -Sewer and Water Planning (TIF Districts) \2013 Engineering and Planning \final report \final Regional Development Study.dou September 2013 an easement adjacent to roadways. It is assumed other ROWS and easements will be dedicated as part of platting processes. Summary Table of Wastewater Generation per Land Use Category Landuse in Southeast Corcoran Unit Rate (Gallon /Acre /Day) Southeast Corcoran (acres) Estimated Wastewater Flow (MGD) Ag Preserve 0 135 0.000 Business Park 1,000 0 0.000 Commercial 1,000 71 0.071 Existing Residential 270 443 0.120 Golf Course 50 74 0.004 High Density Residential 2,000 219 0.438 Light Industrial 1,000 79 0.079 Low Density Residential 750 1,796 1.347 Medium Density Residential 1,050 114 0.120 Mixed Residential 1,200 332 0.398 Mixed Use 1,500 152 0.228 Parks/ Open Space 0 63 0.000 Public/ Semi Public 250 26 0.007 Rural /Ag Residential 0 2 0.000 Undevelopable 0 1,094 0.000 Total 4,600 2.81 The cost to construct the trunk sanitary sewer system to serve the developable areas of SE Corcoran is given in Table 1 (see the Tables section) and is summarized below: Estimated Cost: $8,900,000 Developable Acres: 2,900 Trunk Charge per acre: $3,075 Unit Price $165 per LF T: \2294- Corcoran \10 -Sewer and Water Planning (TIF Districts) \2013 Engineering and Planning \final report \final Regional Development Study.docx 4 -2 September 2013 A enick 5.0 Water 5.1 GENERAL The municipal water system to serve Corcoran consists of the following components: • Distribution System Trunk system and lateral water mains • Pressure Booster station to increase system pressures • Storage Elevated tanks to provide volume for peak demand and fire protection. • Supply Wells and cross connection to adjacent cities • Treatment Iron and manganese removal is a resident expectation A detailed report of the modeling conducted is included as Appendix D. The results of these model analyses show that the proposed distribution layout shown in Figure 2 will adequately supply the anticipated population in year 2030 with the following components; o A 5.7 MGD water supply (maximum day demand) • Maple Grove will supply 5 MGD • Corcoran wells and treatment for 0.7 MGD o A booster pump station to create a hydraulic grade line to 1,156 feet 0 21,600 LF of 10" pipe 0 39,000 LF of 12" pipe 0 1,500 LF of 16" pipe 0 1,900 LF of 24" pipe o Two 1.0 million gallon storage tanks Complete results of all model runs are included under separate cover. T: \2294- Corcoran \10 -Sewer and Water Planning (TIF Districts) \2013 Engineering and Planning \final report \final Regional Development Study.dou September 2013 Pick 5.2 COST ESTIMATE The estimated cost to construct the water storage and distribution system, including pipes, connections, and storage is summarized below. An "ultimate charge" was calculated since the demand side of the analysis shows 0.7 MGD of wells and treatment will need to be provided to supplement the 5.0 MGD Maple Grove supply. A detailed breakout of costs is included in Table 2. Estimated Cost with wells and treatment $12,900,000 Developable Land: 2,900 acres Ultimate charge per acre (with wells and treatment) $4,450 T: \2294- Corcoran \10 -Sewer and Water Planning (TIF Districts) \2013 Engineering and Planning \final report \final Regional Development Study.docx September 2013 Pick 6.0 Transportation 6.1 CITY STREET SYSTEM One of the initial engineering efforts for the TIF District was a layout of the City network of significant streets within developable area. The City system is based off of spacing requirements for the adjacent County roads of CR 10, CR 110 and CR 116. Within this framework a "grid" of City streets was overlaid to show the ultimate system. Figure 3 shows the overall proposed layout. It can be noted that the "City grid" is only in the area east of CR 116, whereas sewer and water also included areas west of CR 116. 6.2 COST ESTIMATE The transportation cost estimate involved both roadway construction costs and right of way (ROW) costs. ROW is a necessary consideration since existing roads will need to be widened and connection will need to be made through adjacent properties. ROW for new roads that support adjacent development will be dedicated as part of the platting process. The total costs for the entire area were calculated for 33,200 lineal feet of street to be constructed. These are further divided into three areas (see Figure 3). Each area will build necessary collector streets and street grid to support the guided land use within that area. Costs per acre for transportation systems have been estimated. Costs will need to be supported by new development and may be supplemented by county, state, and federal transportation funds if available and projects are eligible. The cost per lineal foot of $500 was used for the new construction of the proposed streets on raw land. The proposed street section was determined by existing City standards. T: \2294- Corcoran \10 -Sewer and Water Planning (TIF Districts) \2013 Engineering and Planning \final report \final Regional Development Study.dou September 2013 Pick For the proposed roadways an 80 -foot ROW was assumed. The total estimated ROW required for all future streets is 34.5 acres. The estimated value per acre of the proposed ROW is $30,000 for a total cost of $1,035,000. Overall City Grid System Improvement Cost Additional ROW Cost Total Cost Developable Acreage Transportation Cost $22,423,500 $1,035,000 $23,458,500 1,018 $23,000 The value above is representative of the overall costs, however transportation costs are more localized and therefore this value needs to be further divided into subdistricts. The subdistrict cost for each area shown on Figure 3 can be calculated in further detail on an as- needed basis. T: \2294- Corcoran \10 -Sewer and Water Planning (TIF Districts) \2013 Engineering and Planning \final report \final Regional Development Study.docx September 2013 Pick Tables T: \2294- Corcoran\ 10 -Sewer and Water Planning(TIF Districts) \2013 Engineering and PlanningVinaI report\fina l Regional Development Study.docx September 2013 iWenck Table 1 Sanitary Sewer Trunk Cost Estimate Item Qty Unit Unit Price Total Price Lift Station 3 EA $ 150,000 $ 450,000 6" PVC 0 -12' 730 LF $ 25.00 $ 18,250 8" PVC 0 -12' 3100 LF $ 25.00 $ 77,500 8" PVC 12 -20' 1725 LF $ 30.00 $ 51,750 8" PVC 20'+ 2635 LF $ 100.00 $ 263,500 10" PVC 0 -12' 805 LF $ 35.00 $ 28,175 10" PVC 12 -20' 2775 LF $ 40.00 $ 111,000 10" PVC 20'+ 6015 LF $ 100.00 $ 601,500 12" PVC 0 -12' 3250 LF $ 40.00 $ 130,000 12" PVC 12 -20' 3560 LF $ 45.00 $ 160,200 12" PVC 20'+ 6655 LF $ 100.00 $ 665,500 15" PVC 12 -20' 2000 LF $ 65.00 $ 130,000 15" PVC 20'+ 4110 LF $ 100.00 $ 411,000 18" PVC 0 -12' 630 LF $ 70.00 $ 44,100 18" PVC 12 -20' 4115 LF $ 75.00 $ 308,625 18" PVC 20'+ 2315 LF $ 100.00 $ 231,500 21" PVC 0 -12' 600 LF $ 80.00 $ 48,000 21" PVC 12 -20' 3270 LF $ 85.00 $ 277,950 21" PVC 20'+ 3230 LF $ 100.00 $ 323,000 24" PVC 12 -20' 1100 LF $ 95.00 $ 104,500 24" PVC 20'+ 1020 LF $ 100.00 $ 102,000 Air Release Manhole -- LS -- $ 30,000 4' Dia MH, 8' Deep, Incl casting & rings 220 EA $ 5,000.00 $ 1,100,000 4' Dia MH, overdepth, Incl casting & rings 2000 LF $ 150.00 $ 300,000 Improved Pipe Foundation 53640 LF $ 2.00 $ 107,280 Comp Plan /Easement/Restoration 1 LS $ 300,000.00 $ 300,000 Rounded Subtotal +10% contingencies +25% Engineering, Financial, and Legal Easements and Legal for non - ROW line Total $ 6,375,330 $ 637,533 $ 7,012,863 $ 1,593,833 $ 250,000 $ 8,900,000 T: \2294 - Corcoran \10 -Sewer and Water Planning (TIF Districts) \2013 Engineering and Planning \final report \cost estimates HSL 090613 /Table 1 sewer costs Table 2 Watermain Trunk Cost Estimate Item Qty Unit Unit Price Total Price PVC 10" Watermain 21,600 L. F. $45 $972,000 PVC 12" Watermain 39,000 L. F. $55 $2,145,000 PVC 16" Watermain 1,500 L. F. $75 $112,500 PVC 24" Watermain 1,900 L.F. $85 $161,500 Water Towers (2, 1 M G D towers) 2,000,000 1 L.S. I 2$ /gal $4,000,000 Future Needs Wells and Treatment, 0.7 MGD @ $4 per gallon $2,800,000 Ultimate Cost $ 12,900,000 T: \2294 - Corcoran \10 -Sewer and Water Planning (TIF Districts) \2013 Engineering and Planning \final report \cost estimates HSL 090613 /Table 2 water costs Rounded Subtotal $7,400,000 +10% contingencies $ 740,000 $ 8,140,000 +25% indirects $ 1,850,000 Easements and Legal for non - ROW line $ 125,000 Rounded Total $ 10,100,000 Future Needs Wells and Treatment, 0.7 MGD @ $4 per gallon $2,800,000 Ultimate Cost $ 12,900,000 T: \2294 - Corcoran \10 -Sewer and Water Planning (TIF Districts) \2013 Engineering and Planning \final report \cost estimates HSL 090613 /Table 2 water costs Table 3 Transportation System Trunk Cost Estimate Segment Length Unit Unit Cost Total Price 1 1320 L. F. $500 $660,000 2 1320 L. F. $500 $660,000 3 1320 L. F. $500 $660,000 4 1320 L. F. $500 $660,000 5 1320 L. F. $500 $660,000 6 1320 L. F. $500 $660,000 7 1320 L. F. $500 $660,000 8 1320 L. F. $500 $660,000 9 1320 L. F. $500 $660,000 10a 1115 L. F. $500 $557,500 10b 205 L. F. $500 $102,500 11 1450 L. F. $500 $725,000 12 1060 L. F. $500 $530,000 13 1320 L. F. $500 $660,000 14 770 L. F. $500 $385,000 15 460 L. F. $500 $230,000 16 1320 L. F. $500 $660,000 17 3080 L. F. $500 $1,540,000 18 2640 L. F. $500 $1,320,000 19 2640 L. F. $500 $1,320,000 20 2640 L. F. $500 $1,320,000 21 2640 L. F. $500 $1,320,000 $16,610,000 +10% contingencies $ 1,661,000 $ 18,271,000 +25% indirects $ 4,152,500 Total $ 22,423,500 T: \2294 - Corcoran \10 -Sewer and Water Planning (TIF Districts) \2013 Engineering and Plan ning \final report \cost estimates HSL 090613 /Table 3 transp. street cost Figures T: \2294- Corcoran\ 10 -Sewer and Water Planning(TIF Districts) \2013 Engineering and PlanningVinaI report\fina l Regional Development Study.docx September 2013 iWenck CITY OF CORCORAN Wenck JUN 2013 Engineers - Scientists 1800 Pioneer Creek Center Trunk Sewer System Business Professionals Maple Plain, MN 55359 -0429 Figure 1 www.wenck.com 1 -800- 472 -2232 CITY OF CORCORAN Wenck JUN 2013 Engineers - Scientists 1800 Pioneer Creek Center Trunk Water System Business Professionals Maple Plain, MN 55359 -0429 Figure 2 www.wenck.com 1 -800- 472 -2232 CITY OF CORCORAN Wenck JUN 2013 Engineers - Scientists 1800 Pioneer Creek Center City Street Subdistrict System Business Professionals Maple Plain, MN 55359 -0429 Figure 3 www.wenck.com 1- 800 - 472 -2232 Appendix A Trunk Sanitary Sewer Figures and Design Data (2030 Comprehensive Plan) T: \2294- Corcoran\ 10 -Sewer and Water Planning(TIF Districts) \2013 Engineering and PlanningVinaI report\fina l Regional Development Study.docx September 2013 1 � \ I�� � ��, i�j`� ..•.,.11111.,::, `:� . �� � w 11 � �1� �� 1 �� � � `° � '-- •��I►I■ lug. annun0. �■ i — MEN ■ '•' m mmr�� ��I`p�♦ ��� pn■ i n� ■q��p■ �� ���� 1 1 . • - lira (�� �■�/� 1- .11111111111/ /�i ►11' �� 1111111�11���� .m111111UN en .011 . ■I -/+/►�� � � �` ��� �► u■■II ".-.E.En�• ..... ��• \III , ,����` i:���0�� I ■11 111111 �' � �r �i �•:= 0 Sewer Node 10- Gravity Sewer -1— MCES Interceptor Sewer Subdistricts ■ 1 ,..0111.111..7 • - -. �., �■ /,_ Parcel Base .. �! � .. •;_� iii i■ � ■ 1111:... � ► ;; ;��i�►r - � ••,11 �:::.', MAIN \1 �■ � - � ■���ir�■ ' �, =•.,;� 1 111 ■ ■ ■� + * ,,.I„1 �� _ ,, MAN r�.�� _: X11 ■::I�i ii-�ldn _ - ■ _ -�'_- Fes;:_..■ .�;..�:.�: � � � \� 'r�� �� -;.�ql All ,,,,,,_- ■ ■ ■�� � ■ �_ _ ®�I ....., .•- ' .•�• :.••:; �••.: ►.• = �I ► �� r``11���`�; i�,,� ►��,,-i������ ■ � ♦ `� / ��i ,nom `� , , ,_ / .111._ �l�;:- mi•,_,•; '�- __ . . -... r.�l,,,, 111 �r , „��-- ��� ' ►��� 1111 6;Illi�,,;�1 1 �ellll�` ° ■� -- - -, . If 1 llll I�.. oil - -'n;:■ �I�. � � .. � _ . �° , ,... . - —:= �% � III I' ►.! � �.� +' '` '■ .' ■11 1 ' �� � � - ► ■ �,�s �� = i %fir ►` � l�iii� � ■ 1: ■ _ i '! , � 711__.;111 l: =� "` .. - ■ t� VIA � II��� �I�, . �7= ��I��7 � 111 �� � � �� � ■ ■r ■ —• ' ■ —. \► ailf_ ■L��17 ■ ►ia_= ■�� � � � ��i\ � : ,,. ing ��1 i � f■ "'� � , I�r� � iii '�_ _ =o`: `� � •;�•:� � - �. = •.��.. ■ qtr.■ � ►;: %l �� ►�. ;,��_ .. ■•� 1 II �■ ■� ■ ■��r .. ,..::::... .... ,. , .. 1.1.1... .. . 11111 IFEE 111155 11 111 i Lij z IL LU LU 0 —A q 1 2/12/20121 2112/2012 aw L 1 2/1212012 I /121201, JUBERT '2013 3/23/2013 ■ VIM z LLI ff r1m I ,--\I i 7/24/2018 7124/2018 1/21121016 [=Mimi IIII jz� LAKE • 0 ..... 0<110 0 0 HORSESHOE TRIL MORIN LAKE Hk 0 of 1 a < 2 U- 0 1 IC•• K : LAKE I 2Z GLEASON ROAD Figure 8 CoCity of RCORAN 2030 Future Land Use Plan 2030 Comprehensive Plan N W-� �� E S 3,000 1,500 0 3,000 Feet City Limit Staging Boundaries Agricultural Reserve (Date of Expiration) Wetlands Rural/Ag Residential Existing Residential Low Density Residential Medium Density Residential Mixed Residential High Density Residential Rural Service/Commercial Commercial Mixed Use Business Park Light Industrial Public/Semi-Public Parks/Open Space Golf Course Agricultural Preserve (Date of Expiration) Open Water *The Future Land Use plan depicts the location and intensity of future development through a variety of land use types. This plan is intended to guide future development however the City has discretion to amend (with Metropolitan Council approval) the plan in response to landowner/ developer requests or response to other system plans. October 7, 2010 Bonestroo 1:/504/50408144/GIS/ComPlan/Maps/FinaI Maps/2030 flu.mxd Appendix B Trunk Water System Figure (2030 Comprehensive Plan) T: \2294- Corcoran\ 10 -Sewer and Water Planning(TIF Districts) \2013 Engineering and PlanningVinaI report\fina l Regional Development Study.docx September 2013 1 � Meadow Creek. _Tessmer_Rd_ 1 1 1 1 1 I I WOOdtand_Tr--L 1 i 0 J 1 W LL z j W W LL c� O 1 � 1 1 Salem La' 1 Julie Ann C 1 - j 1 1 - 1 Rebecca -Park Tr — 1 1 � 1 1 1 I■I 1M■■ ■ ,te J I `m m v 3 COUNTY ROAD 117 Sunset a c Rush C` C T rE F .m yr I 1 •m� EL� ;y 1 FJ� U O o La Hidden Ponds e 7 ■.■ ■■�n�n�..�n�n�■■�■■�n11IIN �n�n�■■1 Jackie La j ,dam ■ 1 IAA jCOOK 1 Rus dow La Eo Country Cir E 0 j M. � . • a. untry�Rdr � ■ rr_ o S_tieg.Rd �. ■ '0 �o Dassel L•a St�e9Rv ■ m Darrel.La ■ ridge Rd 1 ■ Hill-s.ide -Dr ■ j .01.st.Aae ■ Hunters Ridge j 1 ■ '� 1 ,�mE ........ ■■■■.�, ■ Oswa \a 97th Ave =N ■ , I G U '1■/ 1 L � t �\ FIEZ ■ kul IM■ ■■ mom ■ ■ i'n -Rd ■ ■ c 0 ■ ■ m ■ ■ ■ ■ ` ■ MORIN �L LAKE O� {s ,� LL o IWO j ,dam ■ 1 IAA jCOOK ■ LAKE 1 • 01 31 x= �1 ridge Rd i� c 1 ■M! I Figure 20 City RC O RAN Co Trunk Water System 2030 Comprehensive Plan N W 46I 4\ S 3,000 1,500 0 3,000 Feet Q Potential Water Tower Locations A Potential Supply Connections with Neighboring Communities ENE, Future Trunk Watermain Future Well Exploration Areas 2030 Service Boundary City Limit Open Water Wetlands October 7, 2009 Bonestroo I:/ 504 / 50408144 /GIS /ComPlan /Maps /Final Maps /trunk water system.mxd Appendix C Subdistrict Areas for Sewer and Water and Transportation (From 2030 Comprehensive Plan) T: \2294- Corcoran \10 -Sewer and Water Planning (TIF Districts) \2013 Engineering and Planning \final report \final Regional Development Study.docx September 2013 %r � Table C -1 Subdistrict Areas for Sewer and Water (from 2030 Comprehensive Plan) Sewer Sub district ID Developable Total Public Existing Residential Undevelopable (acres) (acres) (acres) (acres) (acres) SE -A 0 44 0 18 26 SE -B 28 60 0 0 32 SE -C 79 80 0 0 1 SE -D 115 182 0 21 46 SE -E 0 67 4 52 11 SE -F 12 75 44 0 19 SE -G 0 25 20 0 5 SE -H 108 121 0 0 13 SE -1 20 21 0 0 1 SE -J 98 123 0 0 25 SE -K 35 42 0 0 7 SE -L 84 97 2 0 11 SE -M 0 40 0 8 32 SE -N 45 119 74 0 0 SE-0 168 205 0 0 37 SE -P 68 74 0 0 6 SE -Q 57 90 19 0 14 SE -R 29 35 0 0 6 SE -S 18 32 0 0 14 SE -T 139 163 0 0 24 SE -U 101 125 0 0 24 SE -V 0 63 0 41 22 SE -W 38 52 0 0 14 SE -X 43 92 0 36 13 SE -Y 178 202 0 0 24 SE -Z 49 75 0 0 26 SE -AA 7 120 0 74 39 SE -AB 118 192 0 0 74 SE -AC 0 58 0 32 26 SE -AD 34 118 0 59 25 SE -AE 138 153 0 0 15 SE -AJ 112 284 0 50 122 SE -AK 168 250 0 0 82 SE -AM 116 129 0 0 13 SE -AO 159 191 0 0 32 SE -AP 72 79 0 0 7 SE -AQ 75 80 0 0 5 SE -AR 81 116 0 0 35 SE -AS 58 77 0 0 19 SE -AT 95 204 0 0 109 SE -AU 76 123 0 33 14 SE -AV 79 122 0 19 24 TOTAL 2900 4600 163 443 1094 T: \2294 - Corcoran \10 -Sewer and Water Planning (TIF Districts) \2013 Engineering and Planning \final report\Appendix C \Ultimate System Areas Table C -1 water & sewer SE area Table C -2 Subdistrict Areas for Transportation (from 2030 Comprehensive Plan) Sewer Sub district ID Developable Total Public Existing Residential Undevelopable (acres) (acres) (acres) (acres) (acres) SE -AA 7 120 0 74 39 SE -AB 118 192 0 0 74 SE -AC 0 58 0 32 26 SE -AD 34 118 0 59 25 SE -AE 138 153 0 0 15 SE -Y 178 202 0 0 24 SE -Z 49 75 0 0 26 SE -S 18 32 0 0 14 SE -T 139 163 0 0 24 SE -J 98 123 0 0 25 SE -K 35 42 0 0 7 SE -L 84 97 2 0 11 SE -M 0 40 0 8 32 SE -N 45 119 74 0 0 SE -C (partial) 37 37 0 0 0 SE -X (partial) 38 51 0 0 13 TOTAL 1018 1622 76 173 355 T: \2294- Corcoran \10 -Sewer and Water Planning JIF Districts) \2013 Engineering and Planning \final report\Appendix C \Ultimate System Areas Table C -2 trans SE area Appendix D Distribution Model T: \2294- Corcoran\ 10 -Sewer and Water Planning(TIF Districts) \2013 Engineering and PlanningVinaI report\fina l Regional Development Study.docx September 2013 iWenck DISTRIBUTION MODEL To estimate the requirements of a distribution system for the southeast portion of Corcoran, the water distribution modeling software program WaterCAD was used. This program was used to evaluate adequate pipe line sizes, tank sizes, pump station requirements and provide data to adequately supply water for anticipated population in year 2030. The analyses also evaluate the system's adequacy for supplying fire flows and model different flow regimes to mimic high demand periods and days. Water Demand To develop water use demands to model, the study area was divided into 10 individual areas. Within each of the 10 areas, different land use types were assumed within each area. Each different land use type was assigned a water demand factor. The water demand within each area was determined by multiplying the acreage of each different land use type by a water demand factor per acre of land. All of the different land use water demands were calculated in each of the 10 areas. The water demands within each area were summed and used to determine the demand for an individual node within the computer model. Table 1 shows each land use type and the water demand factor for each land use type for both the average day demand (ADD) and the maximum day demand (MDD). Table 2 shows the water demand calculated for each node in the computer model. Table 1— Water Demand Factor for Land Use Type Land Use ADD Demand gpm /Acre MDD Demand gpm /Acre Undevelopable 0 0 Rural Res. 0.35 1.04 Ag Preserve 0 0 Existing Res 0.25 0.75 Low Density Res 0.35 1.04 Med Density Res 0.61 1.7 High Density Res 1.09 2.95 Mixed Residential 0.45 1.3 Light Industrial 1.04 1.56 Business Park 1.04 1.56 Commercial 1.04 1.56 Mixed Use 0.55 1.37 Public /Semi Public 0.35 0.69 Parkes /Open Space 0.07 0.21 Golf Course 0.07 0.21 T: \2294 - Corcoran \10 -Sewer and Water Planning (TIF Districts) \2013 Engineering and PlanningAnal report\Appendix D \Water Text from Brandon Revised.docx Table 2 — Water Demand for Junction Nodes Demand Node Max Day Demand (gpm) Max Day Demand (MGD) Node 5 558 0.80 Node 6 382 0.55 Node 7 425 0.61 Node 8 229 0.33 Node 9 285 0.41 Node 10 249 0.36 Node 12 579 0.83 Node 14 359 0.52 Node 15 523 0.75 Node 16 364 0.52 Total 3952 5.69 A properly design water distribution system can adequately supply water equal to the maximum daily water demand (MDD) without the use of stored water. From the calculations described above, it was estimated that Corcoran will need to provide a flow of 3,952 gallons per minute or 5.69 MGD before using any stored water. Pipe Size After the demand is calculated, the model is used to determine adequate pipe line sizes. For the purposes of this study, a trunk water main system layout was established. This layout was used to determine the pipe lengths and determine where demand junctions would be located to supply water to each of the 10 demand areas. This layout was then modeled to estimate the amount of flow in each of the pipes under different flow regimes. When modeling the distribution system, the model predicts the amount of flow, flow velocity, headloss and several other hydraulic calculations based on pipe diameter, length and type of the pipelines. Typically, pipe sizes are assigned to limit the velocity through each pipe to a maximum velocity of 5 feet per second. This velocity is a compromise of practicality and hydraulic conditions. In general, the 5 feet per second velocity limit help maintain acceptable head loss levels as well as minimize water hammer concerns within the pipe network without oversizing pipe diameters. To determine the pipe sizes for this system, the velocities within the pipe segments were kept below the 5 feet per second limit during max day demand and fire flow conditions. Pump Requirements A pump system is required to boost the water pressure provided by the Maple Grove to adequately supply Corcoran. This model was not used to design a pump station, but rather determine the pressure boost required to provide adequate water pressures to the Corcoran system. Fire Flow Fire flow demands were assumed to be 1,500 gpm for every junction in the system. A model analysis was set up to predict the effects of a 1,500 gpm fire at every junction without negative impacts on the T: \2294 - Corcoran \10 -Sewer and Water Planning (TIF Districts) \2013 Engineering and PlanningAnal report\Appendix D \Water Text from Brandon Revised.docx system. One of the major potential impacts would be very low or negative hydraulic pressures within the system, leaving areas without water or possibly damaging pipes because of negative pressures. Certain parameters were set up in the model to determine the amount of fire flows available without negatively affecting the system. One such parameter assumed for the model was that a fire flow condition would not produce a pressure of 20 psi or less at any location within the system. The model will report the amount of flow available for fire protection while operating within the parameters set for the system. This result will estimate the maximum fire flow available at each junction. Storage The model was also used the estimate the amount of storage, or tank sizes required for the system. As stated earlier, the system's supply should equal the average flow during the maximum water use demand for a single day. During the maximum day, flow fluctuates over the 24 hour period of the day as water demands increase or decrease throughout the day. The model was developed to mimic these fluctuations which at times require more flow than the average maximum day demand and at other times less flow. During times when the demand exceeds the average demand, additional flow is provided from water stored in tanks and when more water available from the main supply, the tank fills. The models analyses help determine the amount of storage needed to overcome these fluctuations and predicts water level fluctuations during the day. Two tanks were analyzed in the system. Properly sized, the tanks should cycle in volume throughout the day, but should return to full at the end of the simulated day. The tanks also help insure that a steady flow is supplied during the day from the supply source, minimizing pump cycling. Tanks typically are used for three purposes; equalization (described above), fire flow and emergency flow. Recommendations published in "Distribution Network Analysis for Water Utilities" (American Water Works Manual of Practice M32) estimate that the equalization storage volume is approximately half the tanks capacity and the remaining half is used for fire flow and emergency storage. Pressures The distribution network developed for the model must also provide adequate pressures to all areas. For this network, it was assumed that the minimum pressure at any location within the system shall be no lower than 50 psi. This pressure criterion defines what elevation the hydraulic grade line (HGL) must be within the system. To maintain the proper HGL, a pump station is required to boost pressure and increase the HGL from water delivered by neighboring communities. Tank levels and elevations are also defined by the required HGL. Results Three scenarios were developed within the model. The first scenario was developed to mimic the average maximum day water demands for the system. The results of this scenario were used to develop the proper pipe sizes and to determine the pumping requirements to provide adequate pressures at T: \2294 - Corcoran \10 -Sewer and Water Planning (TIF Districts) \2013 Engineering and PlanningAnal report\Appendix D \Water Text from Brandon Revised.docx every location within the system. Table 3 shows the resulting flow and velocity in each of the pipes within the network. Table 3 — Pipe Length, Diameter, Flow and Velocity Pipe Label Length (ft) Diameter (in) Flow (gpm) Velocity (ft /s) P -C2 1862 24 1328 0.94 P -C3 6364 12 1328 3.77 P -C4 3488 12 819 2.32 P -05 3776 10 261 1.07 P -C6 2124 10 175 0.72 P -C7 2572 10 -250 1.02 P -C8 6479 10 -197 0.8 P -C9 5152 12 -482 1.37 P -C10 5363 12 -511 1.45 P -C11 1184 12 1006 2.85 P -C12 273 12 -509 1.44 P -C13 1273 12 -509 1.44 P -C14 2006 12 937 2.66 P -C15 2914 10 282 1.15 P -C16 3723 10 296 1.21 P -C17 1439 16 2040 3.25 P -C18 4061 12 1517 4.3 P -C19 6207 8 480 3.07 P -C20 1010 12 117 0.33 P -C21 999 12 117 0.33 P -C22 527 12 117 0.33 P -C23 1745 12 220 0.63 It was determined that the pipe sizes modeled were adequately sized such that no velocity exceeds 5 feet per second. Further analysis in additional scenarios indicates that the pipe sizes shown above are capable of providing all modeled flow regimes while maintaining the velocity limits. Complete model results for this scenario are shown in Appendix D -1. The second scenario modeled was an extended period simulation (EPS) analysis. This scenario mimics the different flow demand fluctuations during the maximum day. A diurnal curve was developed that generates multipliers for each hour of a day, both higher and lower than the average maximum day demand. The results of this analysis were used to determine the amount of equalization storage required to supply the water use demands. The model predicts the tank levels and storage volumes at each hour of the analysis and insures that the tank returns to full capacity at the end of the simulated day. Figure 1 displays the diurnal curve and multipliers developed for the EPS analysis. Figure 2 display a graph of percent full of Tanks T -1 and T -2 during the 24 -hour EPS simulation. T: \2294 - Corcoran \10 -Sewer and Water Planning (TIF Districts) \2013 Engineering and Planning \final report \Appendix D \Water Text from Brandon Revised.docx 2.5 2 0 Y U 1.5 LL _ f0 1 C d 0 0.5 0 Diurnal Curve 0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 Time - Hours Figure 1— Diurnal Curve Demand Factors 100 90 80 0 U- 4- 70 60 u i a 50 40 0 J �e 30 m 20 10 0 Tank Levels 0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 Time - Hours Figure 2 — Tank Levels T -1 T -2 The results of this analysis determined that 2 million gallons of storage are required for the proposed system. Two tanks, each with a storage capacity of 1 million gallons were modeled. The top elevation of each tank was set to equal the HGL needed to provide adequate pressures. This equated to a top of tank elevation of 1,156 feet. As depicted in Figure 2, the tank levels drop to approximately 50% of the storage T: \2294- Corcoran \10 -Sewer and Water Planning (TIF Districts) \2013 Engineering and Planning \final report\Appendix D \Water Text from Brandon Revised.docx volume forming the EPS analysis and return to full at the end of the analysis. This leaves approximately 50% of the total storage volume for fire flow and emergency storage as recommended. Complete model results for this scenario are shown in Appendix D -2. The final scenario was the fire flow analysis. To determine if the system could supply adequate fire flow, the model stipulates that certain criteria be met during the simulation. Two of the criteria assumed for this model were that a minimum fire flow of 1500 gpm was required at each junction and that pressures within the system during the fire were at least 20 psi. The model results also determine the maximum fire flows available at each junction to a point where somewhere in the system the minimum pressure drop to the 20 psi threshold. It was also assumed that the fire flow would occur at a time when the tanks were at the lowest level depicted during the EPS modeling scenario. Table 4 displays the fire flow results for each junction within the system. Table 4 - Fire Flow Results Junction Label Fire Flow (Needed) (gpm) Fire Flow (Available) (gpm) Pressure (Residual Lower Limit) (psi) Pressure (Calculated Residual) (psi) Pressure (Calculated Zone Lower Limit) (psi) Junction w/ Minimum Pressure (Zone) J -C3 1500 3500 20 79.8 49.8 J -C19 J -C4 1500 3500 20 62.6 50.2 J -C19 J -05 1500 3500 20 46.5 50.2 J -C19 J -C6 1 1500 3500 20 42.3 45.4 J -C7 J -C7 1500 3500 20 27.9 39.5 J -C8 J -C8 1500 3500 20 29.8 46.6 J -C7 J -C9 1500 3500 20 24.5 49.5 J -C19 J -C10 1500 3500 20 47.8 49 J -C19 J -C11 1500 3500 20 51.1 49.9 J -C19 J -C12 1500 3500 20 63.5 50.2 J -C19 J -C13 1500 3500 20 57.1 50.3 J -C19 J -C14 1500 3500 20 52.7 46.3 J -C8 J -C15 1500 3500 20 54.9 49.8 J -C19 J -C16 1500 3500 20 36.4 46 J -C17 J -C17 1500 3500 20 45.1 44.4 J -C16 J -C18 1500 3500 20 51.1 47.7 J -C19 J -C19 1500 3500 20 47.6 56.3 J -C10 The results of this scenario indicate that the modeled system can adequately supply the minimum required fire flow and in all case can supply a fire flow of at least 3,500 gpm everywhere in the system. Complete model results for this scenario are under separate cover. TA2294- Corcoran \10 -Sewer and Water Planning (TIF Districts) \2013 Engineering and Planning \final report\Appendix D \Water Text from Brandon Revised.docx The results of these model analyses show that the proposed distribution layout will adequately supply the anticipated population in year 2030 with the following components: o A 5.69 MGD water supply o A pump station capable of boosting the system's hydraulic grade line to 1,156 feet o 6,500 LF of 8" pipe o 22,000 LF of 10" pipe o 34,000 LF of 12" pipe o 1,500 LF of 16" pipe o Two 1.0 million gallon storage tanks TA2294- Corcoran \10 -Sewer and Water Planning (TIF Districts) \2013 Engineering and PlanningAnal report\Appendix D \Water Text from Brandon Revised.docx STAFF REPORT Document No. 11 c. Council Meeting: October 10, 2013 Prepared By: Brad Martens Topic: 2014 Fee Schedule Action Required: Direction Summary: Each year the City approves a Fee Schedule outlining charges for certain items. Attached to this report is a draft Fee Schedule for 2014. Staff requests the City Council review the draft and provide any comments on specific areas staff should look into. The draft 2014 Fee Schedule has been reviewed by City Staff. Financial /Budget: Any changes made to the Fee Schedule will directly affect the proposed 2014 budget. Options: 1. Comment on the draft 2014 Fee Schedule Recommendation: N/A Council Action: Comment on the draft 2014 Fee Schedule Attachments: 1. Draft 2014 Fee Schedule CITY OF CORCORAN 2014 FEE SCHEDULE FEE 12c. ADMINISTRATIVE FEE SCHEDULE DRAFT G/L Records & Service for City Document (Includes Tax) 100 - 41900 -34000 Address List 30.00 100- 41900 -34000 Resident Address List Labels 60.00 100- 41900 -34107 Assessment Search from County 25.00 100 - 41900 -34000 CD -R /Thumb Drive (Any documents to be downloaded) 30.00 100 - 41900 -34000 Fax 0.50 100 - 41900 -36210 Interest charge on 30 day past due Escrow accounts 10% 100 - 41900 -34105 Notary Fee - per document 1.00 Code Books 100 - 41900 -34105 Code Book (Codes /Zoning /Subd) Binder 65.00 100 - 41900 -34105 Municipal Code Only 35.00 100 - 41900 -34105 Subdivision Code Only 35.00 100 - 41900 -34105 Zoning Code Only 35.00 Copies 100 - 41900 -34105 Copies BW up to 8 1/2x14 pp 0.25 100 - 41900 -34105 Copies oversize per page 0.55 100 - 41900 -34105 Copies Color up to 8 1/2x14 pp 1.00 100 - 41900 -34105 Copies Color oversize 1.30 100 - 41900 -34105 Surveys 3.25 100 - 41900 -34105 Surveys Requested by property owner 1.00 Labor /Staff Research 100 - 41900 -36200 Normal Business Hrs (1 hr min.) per hour 65.00 100 - 41900 -36200 After Hours (1 hr minimum) per hour 100.00 Late Fees / Penalties 100 - 41941 -36200 Returned Check Fee 38.00 100 - 41941 -36200 Late Fee Charge - Over 30 days 1.5% / mo 100 - 42400 -36200 Permit Cancellation Fee 25.00 Maps 100 - 41900 -34105 8 1/2 "x11" (Color) 3.00 100 - 41900 -34105 8 1/2 "x11" (Color Laminated) 5.00 100 - 41900 -34105 11 "x17" (Color) 5.50 100 - 41900 -34105 11 "x17" (Color Laminated) 15.00 100 - 41900 -34105 22 "x34" (Blueline) 6.50 100 - 41900 -34105 22 "x34" (Blueline Laminated) 23.00 100- 41900 -34105 22 "x34" (Color) 11.00 100 -41900 -34105 22 "x34" (Color Laminated) 40.00 100 - 41900 -34105 36 "x42" (Color) 23.00 100 -41900 -34105 36 "x42" (Color Laminated) 60.00 100 - 41900 -34105 Topos - Per Acre 16.00 100 - 41900 -34105 Topos - Per Sheet 5,150.00 100 - 41900 -34105 Topos - Non -Legal Copy Laminated Maps must be special ordered Newsletter Advertising /Incl. print & mailing to 1900 Residents (color) 100 - 41900 -36230 Advert. Newsletter Full page 400.00 100 - 41900 -36230 Advert. Newsletter 1/2 page 250.00 100 - 41900 -36230 Advert. Newsletter 1/4 page or Business card size 75.00 100 - 41900 -36230 Insert flyer for mailing supplied by customer 200.00 Recycling Fee 100 - 43232 -34400 Recycling Fee (Annual) - Newly Constructed Homes are pro -rated 37.80 Provider cost 100 - 43232 -34400 Delinquent Charge 10.00 CITY OF CORCORAN 2014 FEE SCHEDULE FEE 12c. COMMUNITY FACILITY FEE SHEDULE Group 1 Local Non Profit Groups: NW Area Jaycees, Lions, Pioneer Society, Seniors, Athletic Assoc, NW Trails N/C Group 2 General Public Non - Profit Groups 15% discount Group 3 Corcoran Residents 10% discount Civic Center Rental Fee - PER DAY 100 - 41941 -34101 Sunday - Thursday 150.00 100 - 41941 -34101 Friday and Saturday 350.00 Return to 2012 rate General Public Non - Profit Groups - Per Day 100 - 41941 -34101 If Contract 6 + time per year 80.00 Return to 2012 rate Memorial Garden included with Civic Center Rental With Civic Center rental N/C Civic Center / Memorial Garden Damage Deposit 100 - 41941 -34101 Damage Deposit (required on all rentals) 350.00 Deposit required on all rentals 100 - 42100 -34201 Police Security serving alcohol (per hr no discount applies)* 65.00 100 - 42100 -34201 Police Security serving alcohol (holiday rate per hr no discount applies)* 85.00 201 - 42100 -34201 Reserve Officer Event Security (per hr no discount applies)* 20.00 Must contact Police for details and contract 100 - 41941 -34101 Meeting / Conference Room 10 -15 people 75.00 Staff recommendation Additional Rental Equipment - Per Day Podium N/C AV Equipment Rental 100 - 41941 -34101 Microphone 10.00 Staff recommendation 100- 41941 -34101 Projector or DVD Player 75.00 City Park - Picnic Facility 100 - 45200 -34101 Rental Fee 80.00 Sales tax 100 - 45200 -34101 Damage Deposit 100.00 100 - 45200 -34101 Soccer /Football /Baseball - per field (6 hour usage) 27.00 Sales tax 100 - 45200 -34101 Lights (Lions field only) - Additional per game 27.00 Sales tax 100 - 45200 -34101 Tennis Courts - All courts 4 hour usage 27.00 Sales tax Fields /Tennis Courts Damage Deposit (per season, all groups) 350.00 Engraved Memorial Bricks (tax included) 415 - 45200 -36230 4 x 8 Engraved Brick 50.00 415 - 45200 -36230 12 x 12 Engraved Brick 100.00 415 - 45200 -36230 Engraved Stone 3 lines of text 15 characters per line Varies* 415 - 45200 -36230 48" Maintenance Free Bench Varies* 415 - 45200 -36230 Concrete Bench - 22 Characters Varies* 415 - 45200 -36230 Granite Bench Varies* *Product and prices subject to change with vendors LICENSE & MISC PERMITS Liquor /Tobacco License 100 - 41900 -32110 Temporary 3.2 Malt Liquor License - Per Daily Event 10.00 100 - 41900 -32110 Temporary 3.2 Malt Liquor License - Annual Max 100.00 100 - 41900 -32110 On Sale 3.2 Malt Liquor 100.00 100 - 41900 -32110 Off Sale 3.2 Malt Liquor 15.00 100 - 41600 -32110 Investigation (New /Transfer Lic.) 100.00 100 - 41900 -32110 On Sale Intoxicating Liquor 4,000.00 100-41900-32110 Off Sale Intoxicating Liquor (Fee limited by State Law) 150.00 100 - 41900 -32110 Sunday Sale Intoxicating Liquor (Fee limited by State Law) 200.00 100 - 42100 -34202 Investigation Fee (New /Transfer Lic.) 300.00 100 - 41900 -32110 2:00 am Closing 100.00 100 - 41900 -32110 Tobacco License 150.00 100 - 45200 -36200 Fireworks Permit -Per Event 25.00 100 - 41900 -34103 Hobby Kennel - Annual Fee 75.00 Commercial Kennel - See Home Occupation Code Burning Permit 100 - 42100 -34200 1 IValid for 10 Days 10.00 100 - 42100 -34200 1 IValid for 120 Days 50.00 CITY OF CORCORAN 2014 FEE SCHEDULE FEE 12c. Burning Not Allowed in Commercial Area Driveway Permit 100 - 43100 -34300 Driveway Permit (Culvert is the responsibility of the property owner) 100.00 Grading & Land Reclamation 100 - 43100 -34300 Under 300 Cubic Yards 35.00 100 - 43100 -34300 Over 300 Cubic Yards - residential 300.00 100- 43100 -34300 Per acre security fee 250.00 One Acre Minimum (No security fee for under 300 Cubic Yads required) In the event there are critical conditions or concerns with the area to be graded or reclaimed, the City Engineer or other designated City Staff shall determined an amount to be secured to assure the completion of the project. In the event there are unique circumstances to the site additional fees may be imposed to cover additional staff time necessary to process the permit. Overweight Vehicle Agriculture N/C 100 -43100 -34300 Commercial Tow Truck 750.00 100 - 43100 -34300 Daily Permit 100.00 100 - 43100 -34300 Seasonal - Emergency (Septic Liquid Propane & Simular) N/C Resident - To and From N/C 100 - 43100 -34300 Seasonal - Home Delivery 250.00 100 - 43100 -34300 No Permit - Double Fee Max $250.00 All Charges are Per Truck - Permits are Restricted Sign Permit 100 - 41900 -36200 No Planning Comm Review - Temporary 95.00 100 - 41900 -36200 No Planning Comm Review - Permanent 150.00 100 -41900 -36200 Wetland Buffer Sign (per sign - requires site inspection) 20.00 100 - 41900 -36200 Planning Commission Review (Admin /Escrow) 150.00/500.00 Utility Permit 100 - 43100 -34300 IE:Comcast, Century Link, CenterPoint Energy, Wright- Hennepin, etc 75.00 PUBLIC SAFETY FEE SCHEDULE G/L Police Reports 100 - 42100 -34202 Police Reports - Base Charge 7.00 100 - 42100 -34202 Police Reports - Surcharge (Per Page) 0.25 100 - 42100 -34202 Audio /Video on CD /USB Thumbdrive 25.00 Finger Printing Resident - Child N/C 100 - 42100 -34202 Non - Resident - Child 10.00 Resident - Adult N/C 100- 42100 -34202 Non - Resident - Adult 15.00 Additional Cards - Resident N/C 100 - 42100 -34202 Additional Cards - Non - Resident 5.00 False Alarm Fire Emergency 100 - 42100 -35101 2 -3 In any 12 -month period ( Each) 75.00 100 - 42100 -35101 4+ In any 12 -month period (Each) 150.00 False Alarm Police 1 -3 In any 12 -month period N/C 100 - 42100 -35101 4+ In any 12 -month period 100.00 Firearm Permits 100 - 42100 -34200 High Powered Discharge of Fire Arm - Resident ** 15.00 100 - 42100 -34200 High Powered Discharge of Fire Arm - Non - Resident ** 20.00 100 - 42100 -34200 Permit to Purchase /Transfer N/C 100 - 42100 -34200 Range contract per day (law enforcement agencies only) 50.00 100 - 42100 -34200 Command Post per day 50.00 Staff recommendation Vehicle Impound 100 - 42100 -34202 Vehicle Impound Release 10.00 100 - 42100 -34202 Storage Fee Weekly 75.00 Animal Impound 100 - 42100 -35101 1 st Offense 50.00 100 - 42100 -35101 2nd Offense 150.00 CITY OF CORCORAN 2014 FEE SCHEDULE FEE 12c. 100 - 42100 -35101 No Kennel License 50.00 Event Security Rates 100- 42100 -34201 Officer - per hour 65.00 100 - 42100 -34201 Officer - per hour Holiday rate 85.00 201 - 42100 -34201 Reserve Officer - per hour 20.00 *Fee Set By State / - Restricted PUBLIC WORKS FEE SCHEDULE G/L Equipment Usage Per Hour (5 day work week per 40 Hour) 100 - 43100 -36200 Tractor /Backhoe 50.00 100 - 43100 -36200 Dump Truck 65.00 100 - 43100 -36200 Front End Wheel Loader 40.00 100 - 43100 -36200 Road Grader 80.00 100 - 43100 -36200 Skid Loader 40.00 100 - 43100 -36200 Wood Chipper 40.00 Labor 100- 43100 -36200 Per Hour 65.00 Staff recommendation Lawn Mowing - Property Cleanup 100 - 43100 -36200 Mowing 1 acre & under 269.00 Sales tax 100 - 43100 -36200 Mowing over 1 acre - $250 + additional hourly rate 91.50 sales tax 100 - 43100 -36200 ITree and weed removal, city cost + $75.00 Admin costs 100 - 43100 -36200 Rubbish removal, city cost + $75.00 Admin costs Storm Water Basin Connection Cost Swing Away Mail Box Arms (Sales Tax included) 100 - 41941 -36200 Post only (mailbox not included) 65.00 100 - 41941 -36200 Post and Installation (mailbox not included) 150.00 Street Department Fees 100 - 43100 -36200 Street Sign Install Labor (Per hour) 75.00 100 - 43100 -34301 Dust Control Assessment) Established Annually 100 - 43100 -34301 Dust Control (Voluntary) 300' min. Established Annually 100 - 43100 -36200 Culvert priced per foot ( +5% admin handling) Based on bid PLANNING DEVELOPMENT & ZONING FEE SCHEDULE Land Use Permit /Application Type Non - Refundable Application Fee Escrow Agriculture Preserve Application - Placement (fee limited by state) 50.00 $0 Agriculture Preserve Application - Removal (fee limited by state) 50.00 $0 Administrative Permit 80.00 $600 Certificate of Compliance 80.00 $0 Comprehensive Plan Amendment 1,000.00 $2,200 Conditional Use Permit (CUP) 550.00 $2,000 Conditional Use Permit (CUP) Amendment 180.00 $600 Environmental Review 500.00 $5,000 Interim Use Permit 500.00 $2,000 Final Plat - Base Fee Regular / OSP 575.00 $5,000 Final Plat - Per Lot Regular /OSP 50.00 N/C Park Dedication Fees (Subdivision Ordinance) See Section 955 Maximum Fee per residential unit inside the MUSA 4,000.00 Maximum Fee per residential unit outside the MUSA 3,000.00 Preliminary Plat - Base Regular - OSP 600.00 $5,000 Preliminary Plat - Per Lot Regular / OSP 50.00 N/C PUD - Preliminary Development Plan 575.00 $5,000 PUD - Final Development Plan 500.00 $5,000 PUD - Sketch Plat /Plan Review 450.00 $2,000 Rezoning 575.00 $2,000 Sketch Plat /Plan Review - Regular / OSP 450.00 $1,750 Site Plan 425.00 $1,500 [ 1 ] The application fee includes administrative costs which are necessary to process the application, including but not limited to the preparation of the legal notice, publication of legal notice, postage, coordination and copying of agenda material and other items relative to the specific application. Payment of all application fees will be required whether the application is granted or denied. [2] The escrow fee will include all charges for staff time by the Planning Consultant, City Engineer, City Attorney and /or other consultant as needed to process the application. Payment of all fees charged against escrow account will be required whether the application is granted or denied. CITY OF CORCORAN 2014 FEE SCHEDULE FEE 12c. Minor Site Plan Amendment 180.00 $600 Topography Exemption, Wetland Waiver, Electronic File Waiver 180.00 $600 Vacation 350.00 $1,000 Variance 550.00 $2,000 Zoning /Subdivision Code Amendment 700.00 $2,000 Meetings w/ City Planner or City Engineer on projects not yet submitted to City - First meeting (up to 1 hour) no cost. Additional time requires an escrow to be determined by the City Administrator with a minimum of $500.00 [ 1 ] The application fee includes administrative costs which are necessary to process the application, including but not limited to the preparation of the legal notice, publication of legal notice, postage, coordination and copying of agenda material and other items relative to the specific application. Payment of all application fees will be required whether the application is granted or denied. [2] The escrow fee will include all charges for staff time by the Planning Consultant, City Engineer, City Attorney and /or other consultant as needed to process the application. Payment of all fees charged against escrow account will be required whether the application is granted or denied. 2014 CITY OF CORCORAN BUILDING PERMIT AND RELATED FEES SCHEDULE BUILDING PERMIT FEE - Fee is 100% of the adopted fee schedule below, plus State surcharge and applicable reviews listed below. TOTAL VALUATIONS BUILDING PERMIT FEE SCHEDULE (Residential & Commercial) $1.00 to $500.00 $35.00 $501.00 to $2,000.00 $35.00 for the first $500.00 plus $3.05 for each $1,000,001 to $2,000,000 additional $100.00 or fraction thereof, to and $2,000.001 to $3,000,000 including $2,000.00. $2,001.00 to $25,000.00 $80.75 for the first $2,000.00 plus $14.00 each $4,000,001 to $5,000,000 additional $1,000.00 or fraction thereof, to and Greater than $5,000,000 including $25,000.00. $25,001.00 to $50,000.00 $402.75 for the first $25,000.00 plus $10.10 for each additional $1,000.00 or fraction thereof, to and including $50,000.00. $50,001.00 to $100,000.00 $655.25 for the first $50,000.00 plus $7.00 for each additional $1,000.00 or fraction thereof, to and including $100,000.00. $100,001.00 to $500,000.00 $1005.25 for the first $100,000.00 plus $5.60 for each additional $1,000.00 or fraction thereof, to and including $500,000.00. $500,001.00 to $1,000,000.00 $3245.25 for the first $500,000.00 plus $4.75 for each additional $1,000.00 or fraction thereof, to and including $1,000,000.00. $1,000,001.00 and up $5620.25 for the first $1,000,000.00 plus $3.65 for each additional $1,000.00 or fraction thereof PLAN REVIEW FEE: 65% of the Building Permit Fee calculated from the above schedule. REPETITIVE PLAN REVIEW FEE: 25% of the Building Permit Fee calculated from the above schedule PLAN REVIEW FEE IS NON - REFUNDABLE STATE SURCHARGE: Based on the table below. For valuation use the fees listed above. BUILDING VALUATION STATE SURCHARGE* One Million or less .0005 x valuation with minimum of $5.00 for Flat Rate Permits [up to $10,010 valuation] $1,000,001 to $2,000,000 $500 + .004 x Value - $1,000,000 $2,000.001 to $3,000,000 $900 + .003 x (Value - $2,000,000) $3,000,001 to $4,000,000 $1200 + .002 x Value - $3,000,000 $4,000,001 to $5,000,000 $1400 +.001 x Value - $4,000,000 Greater than $5,000,000 $1500 + .00005 x Value - $5,000,000 SEC FEE: .0005 x permit valuation for all Building Permits except Re -Roof, Re -side, Re- Window, Decks & Interior Remodels. Minimum $150.00 New Home or Commercial Construction, Minimum $50.00 on any other non - exempt construction ZONING AND SET BACK REVIEW: $25.00 for permits requiring review, $75.00 for New Construction plus any costs for City Planner to review. Agricultural Structure requires a Certificate of Compliance. OVER THE COUNTER PERMITS Re -Roof, Re -side and Windows $90.00 each + State Surcharge Fee $5.00 General Plumbing (Residential) $50.00 + additional $5.00 per fixture over 11 + State Surcharge Fee $5.00 Water Heaters / Water Softeners (change out Water Heater $20 per unit + State Surcharge Fee only) ($5.00) Water Softener $15.00 per unit + State Surcharge 2014 CITY OF CORCORAN BUILDING PERMIT AND RELATED FEES SCHEDULE State Surcharge fee is subject to State change OTHER INSPECTIONS AND FEES Inspection outside normal business hours; minimum two hour charge Fee ($5.00) Mechanical (Residential) $75.00 per unit + State Surcharge Fee ($5.00) (Furnace, AC or Gas line) Additional $10.00 gas fitting /connection fee for each unit over 2 units The following qualify as a "unit" Furnace, AC, Air Exchange, In -floor heat, gas Fireplace, Geothermal System, Ground System Heat Pump, Garage Heater, Etc. Gas Fireplace $100.00 + State Surcharge Fee $5.00 Site inspection fee, required on all new construction RESIDENTIAL $45.00 ea. COMMERCIAL $80.00 ea. Additional plan review required by changes, additions, or revisions to approved plans (min. '/2 hour charge) $60.00 per hr. Miscellaneous and special services per contract $60.00 per hr. Pre -Move inspection $150.00 ea. State Surcharge fee is subject to State change OTHER INSPECTIONS AND FEES Inspection outside normal business hours; minimum two hour charge $90.00 per hr. Re- inspection Fee $45.00 per hr. Inspections for which no fee is specifically indicated $60.00 per hr. Site inspection fee, required on all new construction RESIDENTIAL $45.00 ea. COMMERCIAL $80.00 ea. Additional plan review required by changes, additions, or revisions to approved plans (min. '/2 hour charge) $60.00 per hr. Miscellaneous and special services per contract $60.00 per hr. Pre -Move inspection $150.00 ea. Moved — In structure (not including foundation, interior remodel, etc. $250.00 ea. Commercial Plumbing permit and plan review Based on valuation Commercial Mechanical permit and plan review Based on valuation Electrical Inspections Residential & Commercial Per State Inspector Demolition Residential $150.00 + State Surcharge ($5.00) Commercial $250.00 + State Surcharge $5.00 Mobile Home Installation $250.00 + State Surcharge ($5.00) Fence Any fence taller than 6' requires a building permit Fee based on valuation + State surcharge Fence residential within 6' of property line Zoning and Setback Review Only $25.00 Permit Cancellation Fee $25.00 CERTIFICATE OF SURVEY City Ordinance Title IV: 40 -2 Certificate of Survey requirement. A certificate of survey shall be required with all building permit applications for new construction and building permits that enlarge or alter the footprint of an existing structure. Application for exemption (Building permits only) — If the proposed structure meets all of the required setbacks from the property line, flood plain, wetlands and easements by two times. PENALTY Any person or entity that fails to obtain a permit under City Ordinance Title IV: 40 -40.04 prior to performing work shall pay a penalty of two times the original permit fee and shall be required to pay all costs associated with enforcement, including reasonable attorney's fees. All fees are to be paid at time of permit issuance STAFF REPORT Document No. 11 d. Council Meeting: October 10, 2013 Prepared By: Brad Martens Topic: 2010 -2012 Benefit Withholding Error Action Required: Approval Ryan Burns Summary: A benefit withholding error has resulted in inaccurate amounts being withheld from several City employees. This issue has occurred in different extents annually from 2009 -2012 and adjustments have already taken place for 2009 and most of 2010. Jill Smith -Arens has completed a thorough review and has presented the final error amounts which need to be paid to or collected from the affected employees. In order to ensure the methodology used was accurate Joe Rigdon of Kern, DeWenter, Viere, Ltd. was asked to review the issue. A memo from him is attached. Additionally, City Administrator Brad Martens has also reviewed the data. Once approved this error should not take place again as it has been corrected for 2013 and beyond. Affected employees have been informed of the issue. Significant documentation exists on this issue that is not included in the Council packet. This information will be provided upon request. Financial /Budget: The amounts owed or due from employees is shown in the below table: Employee Amount owed to or due from employee Jill Smith -Arens $1,874.62 Ryan Burns $1,409.36 John Hamilton $1,303.65 Duane Hochstetler $1,164.78 Jesse Olson $1,404.50 Steve Warren $1,403.54 Pat Meister -$3.70 (due from employee) Brandon Heinz $0.34 Dan Donahue -$3.00 due from employee) Subtotal $8,554.09 Social Security owed $534.63 Medicare owed $7.75 Total $9,096.47 The amount above has been factored into the 2013 Performance Report. Page 2 Options: 1. Direct staff to pay or collect funds from employees as presented. 2. Send back to staff for further review. Recommendation: Direct staff to pay or collect funds from employees as presented. Council Action: Consider a motion to direct staff to pay or collect funds from employees as presented. Attachments: August 23, 2013 memo from Joe Rigdon CPA Memo To: City of Corcoran From: Joe Rigdon, CPA (Kern, DeWenter, Viere, Ltd.) Date: August 23, 2013 Re: H S A Reimbursements The City discovered an apparent issue with its H.S.A. payroll withholding and the resulting impact on employee cash benefits for years 2011 and 2012. Similar issues occurred in 2009 and 2010, but per City staff, have previously been corrected and reimbursed. did not verify that employee election amounts and actual totals in Paychex match source documents (performed by City staff), but I did recalculate the medical reimbursement amounts per pay period and the employee contributions to the H.S.A. The basic problem that occurred was due to the following: The amount of the employee contribution to the H.S.A. was being deducted each payroll from employee gross pay under Paychex withholding code "H1" That same amount of the employee contribution to the H.S.A. was also being deducted from the gross pay of various employees who were receiving a cash benefit due to the employer benefits contribution being in excess of employee benefit costs. That deduction erroneously reduced various employees' gross pay under Paychex pay code "MR ". Example Employee for 2012: CODE "H1": • Employee deduction per pay period: $72.11 (the employee elected $1,875 for their H.S.A. contribution for 2012, which was then divided by 26 pay periods): THIS WAS CORRECTLY WITHHELD CODE "MR ": • Employee elected benefits: $604.25 per month (medical, dental, life insurances, and employer share of the H.S.A. contributions) • Employer benefits contribution: $1,030.52 per month • Employee cash benefit: $426.27 per month ($1,030.52 employer contributions, less $604.25 employee elected benefits) • Preliminary employee cash benefit per pay period: $196.74 ($426.27 monthly cash benefit, calculated over 26 pay periods); THIS SHOULD HAVE BEEN THE EMPLOYEE BENEFIT • Erroneous employee cash benefit reduction per pay period: $72.11 ($1,875 employee elected H.S.A. contribution for 2012, divided by 26 pay periods); THIS SHOULD NOT HAVE BEEN WITHHELD • Actual employee cash benefit per pay period: $124.62 ($196.74 preliminary amount, less $72.11 H.S.A. reduction, $0.01 rounding); THIS SHOULD HAVE BEEN 196.74 The amount to reimburse the employee for 2012: $1,875 ($72.11 for each of 26 pay periods) Additionally, the annual "MR" cash benefit actual totals were compared by City staff to each employee's annual benefit elections for years 2010, 2011, and 2012, with employee reimbursements adjusted by any differences. To prevent this issue from recurring in the future, it is recommended that the City's employee benefit election /enrollment worksheets be modified prior to the 2014 enrollment period. STAFF REPORT Document No. 11 e. Council Meeting: October 10, 2013 Prepared By: Brad Martens Topic: Home Free Funding Request Action Required: Approval Summary: Home Free provides chemical health, domestic violence and long -term care services through six programs serving over 3,600 people each year. The City of Corcoran Police Department utilizes the service in order to abide by a state statute requiring that agencies follow up with victims and provide them with available resources. If the City did not work with Home Free this work would fall back on someone within the Police Department to work with the victims to provide services that would consist of helping them through the court process for a range of items (restraining orders, etc.) that take a substantial amount of staff time. A table in the attached request letter shows that 13 individuals were assisted in Corcoran in 2012. The requested $1,698 averages out to $130.62 per individual. According to Sean Gormley, Public Safety Director this is a very good value for the services provided. Laura Landis of Home Free will be in attendance at the meeting and present the request in the Presentation section of the agenda. Financial /Budget: The 2014 request is $1,698. The increase is due to a larger number of victims using the services. The increase is not currently accommodated in the proposed 2014 budget and will need to be amended if approved. Options: 1. Approve a funding request from Home Free in the amount of $1,698. 2. Send back to staff for further review. Recommendation: Approve a funding request from Home Free in the amount of $1,698. Council Action: Consider a motion to approve a funding request from Home Free in the amount of $1,698. Page 2 Attachments: 1. Home Free Funding Request Letter September 12, 2013 Mayor Ken Guenthner City of Corcoran 8200 County Road 116 Corcoran, MN 55340 Dear Mayor Guenthner: Home Free is respectfully requesting funding from the City of Corcoran in the amount of $1,698 to support the 2014 activities of the Home Free Community Program. Attached is a formula explaining our request; the amount requested is based upon the number of victims served by Home Free in Corcoran. In 2012, Home Free served 13 Corcoran residents. Home Free is also funded by the cities of New Hope, Plymouth, Osseo, and Rogers. Home Free has an agreement with the cities of Plymouth and New Hope for funding of its domestic assault intervention project; requests to Dayton, Osseo, Rogers and other municipalities are made using the same formula as this request. Home Free provides victims of domestic violence with immediate safety, support and information following a domestic assault. We are most appreciative of the support we have received in the past from the City of Corcoran. We look forward to our continued partnership in serving victims of domestic violence. Please feel free to contact me if you have any questions. Thank you. Sincerely, Laura Landis Program Coordinator Enclosure Missions Inc. Programs Home Free Community Program 2014 Funding Request to City of Corcoran Home Free Community Program Expenses 2013 Salaries (3.4 FTEs) 71,073 Benefits and Payroll Taxes 51,955 Office and Program Supplies 1,500 Staff Recruitment 420 Consulting 2,460 Repairs /Tradespeople 540 Mileage 3,720 Postage 840 Printing 1,200 Office Rent 10,200 Office Equipment - Lease 1,980 Telephone 3,012 Staff Development 600 Depreciation 484 Insurance 1,195 Administration 23,086 Total Expenses 174,265 Secured Funding Minnesota Department of Public Safety 71,073 Hennepin County 71,500 Total Secured Funding 142,573 Funding to be Raised 112,622 Program Activities total # persons served by Home Free Community Program, 2012 862 # persons served in Corcoran - 2012 13 of total persons served 1.5081% Funding Request to City of Corcoran $1,698 STAFF REPORT Document No. 11f. Council Meeting: October 10, 2013 Prepared By: Brad Martens Topic: City Administrator Priorities Action Required: Direction Summary: At the September 26, 2013 City Council meeting discussion took place regarding the work load of the City Administrator. The Council directed the City Administrator to share with the City Council what items are being worked on so that the City Council may assist with prioritizing his tasks. Attached to this document is a table showing the bulk of the existing work load of the City Administrator. As this report was being written it was realized that many projects are already committed to so there are limited actions that can be taken in the near term to change priorities. The real opportunity is to establish what priorities should be in the future. A core question is whether time should be spent working internally to increase efficiency through reviewing the structure and processes used within the organization. This is a high priority in order for the organization to handle increasingly complex and demanding issues. If this is a priority for the City Council staff would like to limit the amount of new projects taken on and reduce the level of involvement in optional projects I am currently working on. Specific actions could be as follows: • Delay design guideline update work until completion of the Public Works facility • Update proposed agreements related to the Maple Hill Community Center project to have other parties responsible for as many activities as possible such as reporting requirements and construction management • Use consultants as possible to assist with projects Financial /Budget: N/A Options: 1. Provide direction on what priorities should be focused on. Recommendation: Direct staff to limit new /optional work tasks in order to focus on internal processes and structure within the organization. Page 2 Council Action: Provide direction on what priorities should be focused on. Attachments: 1. City Administrator Work Load City Administrator Work Load Task Current /Future Involvement Required /Optional Priority City Council meeting materials Current Heavy Required High Commission meeting materials Current Moderate Required High Public Works Facility Current Moderate Required High Sanitary Sewer and Water Services Policy /Ordinance Development Current Heavy Required High Sanitary Sewer and Water Services - Internal preparation (billing, etc.) Current Heavy Required High 2014 Budget Current Moderate Required High Lennar Development Review Current Moderate Optional High Maple Hill Community Center Current Heavy Optional Low Internal Processes /Structure Current /Future Heavy Optional High Financial Planning Current Moderate Optional High Design Guideline Update Future Moderate Optional Low Distressed Property Acquisition Future Moderate Optional Med. Downtown Infrastructure Improvements Future Heavy Optional Med. Pavement Improvement Plan Future Moderate Optional Med. Hackamore Road Improvement Current /Future Moderate Optional Low County Road 19 Sewer Planning Future Light Optional Low Business Outreach Future Moderate Optional High School District Outreach Future Light Optional Med. Salary Study /Job Description Updates Future Moderate Optional High. Park Dedication Planning Future Moderate Optional Med. City Collaboration Future Moderate Optional Med. Continued education Ongoing Low Optional High Network building (Chamber, Jaycees, Metro Cities, Met Council, County, etc.) Ongoing N/A Optional High City Council outreach Ongoing Low Optional High Staff Team Building Future N/A Optional High Notes Involvement level is current Priority level was assigned by Brad STAFF REPORT Document No. 14a. Council Meeting: October 10, 2013 Prepared By: Brad Martens Topic: November and December meeting schedule Action Required: Approval Thursday, December 26, 2013 Summary: In November and December the second Council meetings of the month fall on or near holidays. Staff is requesting the City Council discuss meeting dates and make changes as thev see fit. A Droaosal is below. Existing Meeting Date Proposed Meeting Date Thursday, November 28, 2013 Thursday, November 21, 2013 Thursday, December 26, 2013 Thursday, December 19, 2013 The proposed changes will require meetings in November and December to be back to back Thursdays which will limit the amount of staff time available to work on items between meetings. Staff however feels that this is the most appropriate schedule. Financial /Budget: N/A Options: 1. Reschedule November and December City Council meetings as proposed. 2. Reschedule November and December City Council meetings on different dates. 3. Keep existing City Council meeting schedule. Recommendation: Reschedule November and December City Council meetings as proposed. Council Action: Consider a motion to reschedule November and December City Council meetings as proposed Attachments: N/A