Loading...
HomeMy WebLinkAbout2013-05-23 - Council Agenda Packet - Part 2Agenda Corcoran City Council TIF Workshop May 23, 2013 - 7:00 PM 1. Call to Order 2. Agenda Approval 3. TIF Project Discussion* 4. Adjournment *Includes Materials - Materials relating to these agenda items can be found in the House Agenda Packet by Door. MEMORANDUM NORTHLAND STRATEGIES Special Projects Group To: Dan Donahue, City Administrator From: Tammy Omdal Date: May 1, 2013 Re: Financial Planning Project The purpose of this memorandum is to provide a follow -up to our recent discussion on the Utility Financial Planning Project. The City of Corcoran has hired Northland Strategies, the special projects group within Northland Securities, to assist with financial planning for municipal utility services and to complete an update to the City's adopted "Multi-Year Financial Management Plan Report", originally adopted September 13, 2012. This memorandum provides a preliminary timeline and details on the work to be completed. Background The following tasks have been identified and preliminary dates for completion are as follows: By May 31 Present information at a City Council Workshop on the financial planning work that will be completed and key decision points for the City Council. By June 28 Complete a Utility Study (update to the preliminary financial plan previously prepared by Northland Securities in year 2012.) Work will incorporate Wenck Associates' Regional Development Study, which will provide Trunk costs for infrastructure. By June 28 Prepare draft Policy for Utility Fees and Charges for consideration and adoption by the City Council (a preliminary draft of a policy was prepared by Northland Securities and Wenck in year 2012, but has not been finalized and adopted by the City Council). By July 31 Complete an update to the Multi-Year Financial Management Plan (inclusive of all City funds). By July 31 Work with the City Attorney to create a draft of a Water and Sanitary Sewer Ordinance and assist the new City Administrator on implementation. By July 31 Provide advice to the City on possible modifications to Tax Increment Financing (TIF) District No. 1 that may be necessary as a result of the update to the City's Financial Plans. It is recommended that any final modification to the l'IF Plan for the District should be completed no later than November 2013. Work shall include coordination with other City consultants. Northland Securities, Inc. 45 South 7th Street, Suite 2000, Minneapolis, MN 55402 Toll Free 1- 200 - 851 -2920 Main 612 - 851 -5900 www.northlandsecurities.com Member FINRA and SIPC Financial Planning Project May 1, 2013 Page 2 City Council Workshop We had discussed the idea of a scheduling a Council Workshop to discuss the utility financial planning effort and key decision points for the City Council. The following items would be covered at this meeting: • Review the available methods for financing capital and funding operations of water and sanitary sewer utility systems. These include for example: - Water and sewer availability charges (WAC and SAC) - Trunk -line charges - Connection charges - Lateral connection charges - Service availability fee (i.e., fixed dollar amount per billing cycle) - Usage (consumption) fee (i.e., $/1,000 gallons) - Special assessments (developers may request a special assessment process for a portion of development - public infrastructure costs) - Financial terms to be included in development agreements • Review in general terms the previously adopted multi-year financial plans, including the financial plan for the proposed Water and Sewer Fund. This would include, but not be limited to, a review of the prior assumptions for cash flow and fund balance goals for the City and a review of the prior assumptions for future growth in new utility customers and the need to modify the prior assumptions based on potential pending development. • Review a draft Policy for Water and Sewer Fees and Charges and seek preliminary direction from the City Council on methodology for fees and charges. Utility Study The purpose of the Utility Study is to update prior assumptions and estimates for fees and charges for the proposed new Water and Sewer Utility Enterprise Fund. While the City has been planning for the eventual establishment of a new utility fund(s), the City has not yet taken formal action to create the new utility. The Study will provide the City with updated and current information in order to proceed with necessary official actions; official actions will include adoption of Ordinances to establish the water and sanitary sewer utility services, including necessary fees and charges. Policy for Utility Fees and Charges The purpose of establishing a policy for utility fees and charges is to provide direction and guidance for the administrative implementation of the Ordinance that will be adopted to establish the water and sewer utility services. The policy will address such items as whether the City will require property owners to connect to municipal water and sanitary sewer when available to a property, types of fees and charges for usage of the utility systems, trunk line availability charges and connection charges, frequency of billing, etc. Financial Planning Project May 1, 2013 Page 3 Multi -Year Financial Plan The Multi-Year Financial Plan Report needs to be updated to reflect actual financial performance for fiscal year 2012 and for other changes to prior planning assumptions. The City adopted a fund balance policy in year 2012 that establishes a goal of maintaining a minimum fund balance in the General Fund at 35% of the operating budget. The fund balance policy also addresses level of balance goal for other City funds. Updates to the financial plan will evaluate the previously projected timeline for the City to achieve this goal. Water and Sanitary Sewer Ordinance The City will need to establish regulations and fees and charges for the water and sanitary sewer utilities by ordinance. The ordinance will need to address the following types of regulatory items (the list of items is intended to provide an example of the items to be covered in the ordinance and is not intended to be a comprehensive outline): • Installation of meters • Billing regulations • Public water system connection requirements • Faulty meters • Leak in service line • Liability for repairs • Prohibited discharge into sanitary sewer system • Installation of connections • Establishment and payment of charges Modification to Tax Increment Financing District No. 1 Northland has assisted the City with extensive review of'1IF District No. 1 and is knowledgeable about the allowable options and the City's desire to utilize available tax increment for funding 1'11x' eligible projects within the City. As part of the continued financial planning work that Northland will perform for the City, Northland will coordinate with other City consultants on what may be required for modification to the 111- Plan for TIF District No. 1 prior to the decertification date of December 31, 2013. The outcome of the financial planning work and pending Council decisions will determine whether modification to the 'I1F Plan will be necessary. Depending on what may be required for modification to the 1114 Plan, a public hearing may be required and if so advance notification to the county, school district, and public will be necessary. City of Corcoran TIF Utilization Preliminary Schedule of Activities Prepared By Kirstin Barsness May 2, 2013 May June July August September 2014 Tasks _ 9 16 23 30 6 13 20 27 4 11 18 25 1 H 15 22 29 5 12 19 26 City Council Meeting x x x \ x x \ x v Verify Year End TIF Balance Finalize Estimates for Downtown Infrastructure Authorize Update on Utility Study Authorize 5 Year Plan Update Confirm Projects for TIF Fund Use Utility Study Update Completion Finalize Source & Use Statement For Downtown 5 Year plan Update Completed Presentation on Downtown Finaning Options Decision on Level of TIF Participation in Downtown Meeting with Downtown Property Owners Prepare Utility Policy Prepare Utility Ordinance Modify TIF District Budget TIF Decertification Prepare Bid Docuements Award Bid Construct Improvements Jan -14 TBD TBD TBD Prepared By Kirstin Barsness May 2, 2013 Sheetl Page 1 Item Description Expense Deposit Balance Comment Use of TIF — 70/30 Downtown Option 1 TIF available at end of 2013 $1,856,604 $1,856,604 Yr End = $1,856,604; Currently $1,629,710 2 HWY 55 planning reimbursement to general fund $73000 , $1783604 , , This amount may rise to $100,000 but use the more conservative amount here. 3 Transportation Planning (Refined) $60,000 $1,723,604 4 East/West Transportation Corridor $80,000 $1,643,604 5 Property Acquisition $175,000 $1,468,604 6 Lift Station in Park $500,000 $968,604 7 Stub sewer /water to downtown $40,000 $928,604 8 Downtown sewer /water: City pays lift station and stub (above) and 30% of actual downtown cost. $525,900 $402,704 After lift station and stub, remaining downtown project cost is $1,753,000. City pays 30% of that. (See NOTES 1 & 2) 9 Design Guidelines $20,000 $382,704 10 POTENTIAL: Additional general reimbursement from HWY 55 planning to general fund $27,000 $355,704 We may be able to do this but must stay within the 10% administrative cost. 11 Hope Church Road Assistance $125,000 $230,704 Total $1,625,900 Notes: 1 It is reasonable for the city to pay the full cost of the lift station since it will also serve both the park and the Schendel property in addition to downtown. It also seems reasonable to me for the city to pay the $40,000 to bring the sewer stub to the downtown area. 2 The original survey of the downtown businesses was based on a 50/50 split of the overall cost between city and businesses Having the city provide the lift station and the stub to the downtown area and then using the 70% / 30% formula for the actual downtown part of the project as listed above is perhaps more in line with our assessment policy as it currently exists. Using this method the city would pay 80,600 less then the originally discussed half of the total project cost (half would be $1,146,500 instead of $1,065,900 as above). Thus the downtown businesses collectively would pay about $80,600 more then half the cost. 3 Downtown option cost summary: 1) Force = $1.062 M; 2) Gravity with 24' streets = $1.965 M; 3) Gravity with 32' streets = $2.293 M Page 1 Sheetl Page 2 Item Description Expense Deposit Balance Comment Use of TIF — 50/50 Downtown Option As Proposed in Survey 1 TIF available at end of 2013 $1,856,604 $1,856,604 2 HWY 55 planning reimbursement to general fund $73,000 , $1783604 , , This amount may rise to $100,000 but use the more conservative amount here. 3 Transportation Planning (Refined) $60,000 $1,723,604 4 East/West Transportation Corridor $80,000 $1,643,604 5 Property Acquisition $175,000 $1,468,604 6 Lift Station in Park $0 $1,468,604 7 Stub sewer /water to downtown $0 $1,468,604 8 Downtown sewer /water: City and businesses each pay half of total project cost $1,146,500 $322,104 9 Design Guidelines $20,000 $302,104 10 POTENTIAL: Additional general reimbursement from HWY 55 planning to general fund $27,000 $275,104 We may be able to do this but must stay within the 10% administrative cost. 11 Hope Church Road Assistance $125,000 $150,104 Total $1,706,500 Notes: Page 2