Loading...
HomeMy WebLinkAboutResolution 2003-60 - Approving Site Plan and CUP for Immanual United Methodist Church • City of Corcoran County of Hennepin State of Minnesota CITY OF CORCORAN RESOLUTION 2003-60 MOTION BY: Thomas SECONDED BY: Bucher APPROVING A SITE PLAN AMENDMENT AND CONDITIONAL USE PERMIT AMENDMENT FOR IMMANUEL UNITED METHODIST CHURCH FOR PROPERTY AT 10025 COUNTY ROAD 101 WHEREAS, Immanuel United Methodist Church has requested a site plan amendment and conditional use permit amendment for a church expansion on the parcel legally described as follows: That part of the northeast quarter of the northeast quarter of Section 12, Township 119, North Range 23, west of the 5th principal meridian, described as follows: commencing at the northeast corner of said northeast quarter of the of the northeast quarter;thence south along the east line of said northeast quarter of the northeast quarter a distance of 514.00 feet; thence at right angles west a distance of 618.65 feet; thence at right north a distance of 514 feet to the north line of said northeast quarter; thence east along said north line to the point of beginning. Subject to road. WHEREAS, the City Council exempts this application from the moratorium on development and subdivision; WHEREAS, the Planning Commission has reviewed the request at a duly called Public Hearing and recommends approval, and; NOW, THEREFORE, BE IT HEREBY RESOLVED BY THE CITY COUNCIL OF THE CITY OF CORCORAN, MINNESOTA, that it should and hereby does approve the request by Immanuel United Methodist Church for a site plan amendment and conditional use permit amendment, subject to the following findings and conditions: 1. The site plan amendment and conditional use permit amendment are approved in accordance with the plans received by the City on July 14, 2003 and revisions received August 18, 2003, except as amended herein. 2. Prior to issuance of building permits, the landowner must file the lot consolidation at Hennepin County. The landowner must comply with all conditions of lot consolidation approval. 3. The development shall comply with the C-1 district standards. Resolution 2003-60 Page 2 4. Signage must comply with the ordinance standards in place at the time of permit application. The proposed signage does not comply with ordinance standards, therefore, the applicant must other revise the plans to comply or request a variance. 5. The existing north access to the church shall be closed. 6. Approval is subject to Hennepin County review of the request. The applicant must comply with Hennepin County requirements regarding access and right-of-way. 7. The grading plan shall be prepared by a professional engineer and is subject to review and approval by the City Engineer. The grading and drainage plan must identify the location of any drain tiles and drain tile easements. 8. The addition shall be finished with brick and integral colored block. 9. Outside storage of materials and equipment is not permitted except in areas designated on the approved plan. 10. All trash and recycling must located inside the building. 11. The Building Inspector must approve the soil percolation tests and septic system designs prior issuance of building permits. A primary and an alternative septic site must be identified. Septic sites must be staked and fenced prior to beginning any construction on site. 12. The septic system for the parsonage must be brought up to standard. 13. All drainage and utility easements must be staked, surveyed and properly recorded prior to beginning any work on site. 14. The landowner shall comply with the Wetland Conservation Act. 15. No wetland impact is approved. The plantings and other impacts should be located to avoid impacts. 16. Best Management Practices (BMPs) for erosion control shall be employed. 17. Approval is subject to Hennepin County/ECWD review of the drainage plan, erosion control plan and wetland delineation, as well as any conditions. 18. The applicant shall enter into a Development Agreement with the City to ensure that all conditions of approval are met. A financial guarantee for the improvements shall be required. 19. The parking lot must be upgraded to include B6-12 curbing around the perimeter of the site. Surmountable curbing is permitted on the south boundary of the parking lot to permit natural drainage to continue. 20. The proposed parking lot islands shall be delineated with curbing and landscaped. A landscape plan shall be submitted for staff review. Resolution 2003-60 Page 3 21. Timing of the parking lot improvements shall be coordinated with the County Road 101 access and road improvements required by Hennepin County. ADOPTED by the City Council this 25th day of September 2003. VOTING AYE VOTING NAY XX Bucher,John Bucher,John xx Gageby,David _Gageby, David _Guenthner, Ken (absent) _Guenthner, Ken XX Thomas, Ron _Thomas, Ron XX Lymangood, Chuck _Lymangood, Chuck David Gageby, Acting a or City Seal ATTEST: Kary,Till nn, City Clerk uFFICE OF CCU;fl : : ECJROER i ENNEPIN COUNTY.fti;NNESOTA CERTIFIED II. IT ,,,ND OR ..,, 6\ .c, 2003 NOV 2 I A1111: S �<. 3 G fks DOCUMENT ?f 8233882 % 4. !/i_ CO.REC. ,k---- -- ' - _.__._DEPUTY CITY OF CORCORAN COUNTY OF HENNEPIN STATE OF MINNESOTA The undersigned duly qualified and City Administrator of the City of Corcoran hereby certifies that attached hereto is a copy of the original Resolution No. 2003 - 60, on file in the office of the City Clerk, City of Corcoran. Dated this 20th day of November, 2003. ----/ " Sus Vergin, City Admin. ator