Loading...
HomeMy WebLinkAboutResolution 2010-39 - Approving Satellite Shelters CUP and Site Plan Amendment CITY OF CORCORAN RESOLUTION 2010-39 Motion By: Hudok Seconded By: Gmach A RESOLUTION APPROVING A CONDITIONAL USE PERMIT AMENDMENT AND SITE PLAN AMENDMENT FOR SATELLITE SHELTERS INC. AT 20050 AND 20095 75TH AVENUE NORTH WHEREAS, the landowner has requested approval of a conditional use permit amendment and site plan amendment to allow construction of a small building addition, expansion of the outside storage area and removal of the buildings on Lot 2 (20095 75th Avenue) for property legally described as follows: Lot I, Block 4, COUNTRYSIDE PLAZA 2ND ADDITION, according to the plat thereof on file and of record in the office of the County Recorder, Hennepin County, Minnesota. PIN 26-119-23-14-0014 AND Lot 2, Block 4, COUNTRYSIDE PLAZA 2ND ADDITION and that part of the East 930.65 feet of the Southeast Quarter of Northeast Quarter of Section 26, Township 119, Range 23, which lies west of the west line of the east 533.00 feet of the Southeast Quarter of Northeast Quarter and the west line of Lot 7, Block 4, COUNTRYSIDE PLAZA 2nd ADDITION and which lies north of the westerly extension of a line drawn parallel with and 42.53 feet southerly of the south line of said Lot 7, and which lies southerly of a line formed by the south line of Lots 2, 3 and 4, Block 4, COUNTRYSIDE PLAZA 2ND ADDITION. PIN 26-1111-23-14-0026 Lots 1 and 2, Block 4, COUNTRYSIDE PLAZA 2ND ADDITION. Hennepin County, Minnesota and that part of the east 930.65 feet of the Southeast Quarter of Northeast Quarter of Section 26, Township 119, Range 23, Hennepin County, Minnesota, which lies west of the west line of the east 533.00 feet of the Southeast Quarter of Northeast Quarter and the west line of Lot 7, Block 4. COUNTRYSIDE Plaza 2ND ADDITION and which lies north of the westerly extension of a line drawn parallel with and 42.53 feet southerly of the south line of said Lot 7, and which lies southerly of a line formed by the south line of Lots 2, 3 and 4, Block 4, COUNTRYSIDE PLAZA 2ND ADDITION. WHEREAS, the Planning Commission has reviewed the conditional use permit amendment and site plan amendment at a duly called Public Hearing and recommends approval, and; NOW, THEREFORE, BE IT HEREBY RESOLVED BY THE CITY COUNCIL OF THE CITY OF CORCORAN, MINNESOTA, that it should and hereby does approve the request for a conditional use permit amendment and site plan amendment, subject to the following conditions: Resolution 2010-39 Page 2 1. A conditional use permit amendment and site plan amendment is approved to allow a 800-square foot building, expansion of the storage area and removal of existing buildings at 20095 75th Avenue, in accordance with the plans received by the City on July 22, 2010 and additional information received on August 12, 2010, and the revised site plan received September 15, 2010, except as amended by this resolution. 2. The plan complies with the required 50-foot front yard setback and a 10-foot side yard setback for outside storage areas. The combination of slats in the chain link fence and landscaping will meet the screening requirements. 3. A conditional use permit is also approved to allow construction of metal building addition with rock face block wainscoting to match the existing building, based on the finding that the requirements of Section 1060.050, Subd. 1(B) have been met. Specifically: a. The proposed building and material maintains the quality, durability and value intended by the Ordinance by allowing a minor expansion of an existing building. b. The proposed building is compatible and in harmony with other existing structures in the area. c. The provisions of Section 1070.020 are considered and determined to be satisfied. 4. Prior to issuance of building permits, the applicant/landowner must: a. Record the approving resolution at Hennepin County and provide proof of recording to the City. b. Provide proof that the wetland delineation has been approved by Elm Creek Watershed Management Commission. c. The septic system on 20050 75th Avenue must be abandoned according to state law. Hennepin County must review and approve the plans. A copy of this approval must be provided to the city. d. Material samples for the building addition must be submitted for review and approval by the City. e. Material samples for fence slats must be submitted for review and approval by the City. f. Electronic files of the plans shall be submitted to the City in AutoCAD format. g. Submit a financial guarantee for the proposed work as outlined in Section 1070.050, Subd. 9 of the Zoning Ordinance. 5. Employee and customer parking must be on paved, striped parking areas. Parking in gravel storage areas is not permitted. Resolution 2010-39 Page 3 6. Silt fence must be installed to protect the wetland prior to beginning construction. 7. Any trees that are removed as part of the project must be transplanted on site or replaced with trees of like size to maintain the storage area screening. 8. A sign permit is required prior to installation of any monument or wall signs. 9. Approval shall expire within one year of the date of approval unless the applicant commences the authorized use. ADOPTED by the City Council this 23rd day of September 2010. VOTING AYE Guenthner, Ken Gmach, George Hudok, Christopher Milbrandt, Rosalyn Thomas, Ron VOTING NAY Guenthner, Ken Gmach, George Hudok, Christopher Milbrandt, Rosalyn Thomas, Ron