RESOLUTION NO. 2024-57
Motion By: Nichols
Seconded By: Bottema
May 21, 2024
APPROVING FINAL PLANNED UNIT DEVELOPMENT PLAN FOR "RUSH CREEK
RESERVE 4th ADDITION" FOR M/I HOMES OF MINNEAPOLIS/ST. PAUL LLC
(PID 23-119-2344-0021) (CITY FILE NO. 24-011)
WHEREAS, M/I Homes of Minneapolis/St. Paul, LLC (the "applicant") has requested approval of a
final planned unit development (PUD) plan for "Rush Creek Reserve 3rd Addition" for 51 new
residential units on 13.5 acres of property legally described as:
Outlot F, Rush Creek Reserve Second Addition, according to the recorded plat thereof
Hennepin County, Minnesota.
NOW, THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF
CORCORAN, MINNESOTA, that it should and hereby does approve the request for a final PUD
pIan, subject to the following conditions.
1. A final PUD plan is approved to create 51 residential lots for "Rush Creek Reserve 4th
Addition" in accordance with the plans and application received by the City on February 22,
2024 and additional information received on March 19, 2024, April 4, 2024 and April 12,
2024, except as amended by this resolution.
2. Approval is subject to the preliminary approvals (Resolutions
A::: U
addition to the final PUD approval for the project (Resolution
2014-72 and 2014-73) in
-87).
20
3. Approval is contingent upon approval of the final plat (Resolution 2024-58).
4. The applicant shall comply with all requirements of the City Engineer's memo dated May
14, 2024.
5. The wetland buffers north of the 4th addition are being established as part of a wetland
bank application. The establishment of those buffers will be managed through the
wetland banking project.
6. Drainage and utility easements exist over the wetland compl
ex a
the Rush Creek development. These easements shall stay in pla
due to the adjacent wetland bank application.
nd stormwater BM P's of
ce and not be impacted
7. Sheet L1.03 of the Construction plan set shall be revised to use the City of Corcoran
landscape details.
8. In addition to the street tree, at least two overstory trees shall be planted on each single
family lot.
9. An encroachment and maintenance agreement is required for the retaining wall.
10. The HOA shall be responsible for the maintenance of ponds, sidewalks and all common
areas, including lighting and landscaping in those areas.
Page 1 of 3
City of Corcoran
County of Hennepin
State of Minnesota
RESOLUTION NO. 2024-57
May 2 7) 2024
11. Lighting shall comply with the requirements of Section 1060.040 of the Zoning
Ordinance and generally be placed on the sidewalk side of the street.
a. The applicant shall work with City staff to finalize the street locations.
12. All permanent wetland buffer monument signs must be erected along the wetland buffer
line as required by Section 1050.010, Subd. 7 of the Zoning Ordinance.
a. Wetland signs must be purchased from the City.
b. Wetland signs must be installed on treated 4x4 wooden posts.
c. Wetland buffer signs must be installed prior to issuance of building permits.
d. The installation of the wetland monument buffer signs according the approved
plan must be certified by a registered land surveyor.
e. Wetland buffers must be planted and inspected by the City prior to issuance of
building permits.
f. Where buffer areas are not vegetated or have been disturbed within the last 10
years, such buffer areas shall be replanted and maintained according to the
standards in Section 1050.010 Subd. 8(C) of the Zoning Ordinance.
g. If existing wetland buffers are proposed to remain, the City's wetland buffer
specialist must inspect and confirm existing buffers are undisturbed and in an
acceptable condition prior to submittal of the final plat application (if applicant
proposing to maintain existing wetland buffers).
13. The future homeowners in the development will benefit from the public trail system in
Corcoran. Park dedication for Rush Creek Reserve shall be a combination of land in the
form of trail easements) and cash to satisfy the park dedication requirements. Park
dedication is required at final plat of each phase.
a. Park dedication for this phase shall be cash -in -lieu of land as outlined in the
development contract.
b. The applicant shall record the easement for the fire lane/trail easement on
Outlot E, Rush Creek Reserve 2nd Addition. This easement was given with the
211 Addition but was recorded without the exhibit and must be recorded with
this phase. No park dedication credit shall be given with this phase.
FURTHER, the following items must be addressed prior to issuance of building permits:
14. Mechanical equipment (including air conditioning units) must be located in the side or
rear yard and shown on plans.
15. The plans must show centralized mailbox locations. These mailbox locations shall be
approved by the US Postal Service and proof of the approved locations shall be
provided to the City.
16. Any request for the City to inspect the required landscaping in order to reduce financial
guarantees must be accompanied by recertification/verification of field inspection by the
project Landscape Architect. A letter signed by the Landscape Architect verifying
plantings (including wetland and pond buffers) have been correctly installed in
compliance with the plans and specifications will suffice.
17. Any request for the City to inspect the required pond and wetland buffers in order to
reduce financial guarantees must be accompanied by a recertification/verification of field
Page 2 of 3
City of Corcoran
County of Hennepin
State of Minnesota
RESOLUTION NO. 2024-57
May 21, 2024
inspection by the project Landscape Architect. A letter signed by the Landscape
Architect verifying buffers have been correctly seeded in corn pliance with the plans and
specifications will suffice.
VOTING AYE
® McKee, Tom
® Bottema, Jon
® Nichols, Jeremy
® Lanterman, Mark
® Vehrenkamp, Dean
VOTING NAY
U McKee, Tom
❑ Bottema, Jon
❑ Nichols, Jeremy
❑ Lanterman, Mark
❑ Vehrenkamp, Dean
Whereupon, said Resolution is hereby declared adopted on this 21 St day of May, 2024.
ATTEST
Michelle Friedrich —City Clerk
Tom M
ee -Mayor
Clty $ea/
Page3of3