HomeMy WebLinkAbout2023-02-23 Council Work Session Agenda PacketCouncil Work Session Agenda
February 23, 2023 – 5:30 pm
1.Call to Order / Roll Call
2.Cook Lake Highlands PUD Amendments*
3.Unscheduled Items
4.Adjournment
*Includes Materials - Materials relating to these agenda items can be found in the house agenda packet
book located by the Council Chambers entrance, or online at the City’s website at www.corcoranmn.gov.
HYBRID MEETING OPTION AVAILABLE
The public is invited to attend the regular Council
meetings at City Hall.
Meeting Via Telephone/Other Electronic Means
Call-in Instructions:
+1 312 626 6799 US
Enter Meeting ID: 870 2104 8507
Press *9 to speak during the Public Comment
Sections in the meeting.
Video Link and Instructions:
https://us02web.zoom.us/j/87021048507
visit http://www.zoom.us and enter
Meeting ID: 870 2104 8507
Participants can utilize the Raise Hand function to
be recognized to speak during the Public
Comment sections in the meeting. Participant
video feeds will be muted. In-person comments
will be received first, with the hybrid electronic
means option following.
For more information on options to provide
public comment visit:
www.corcoranmn.gov
Page 1 of 5
STAFF REPORT Agenda Item: 2.
City Council Meeting:
February 23, 2023
Prepared By:
Kevin Shay through
Kendra Lindahl
Topic:
Concept for Planned Unit Development Amendment
(PUDA) for “Cook Lake Highlands” (city file 23-005)
Action Required:
Feedback
Review Deadline: N/A
1. Request
The applicant, Beth Hustad of Trek Real
Estate and Development, is requesting
concept review for a proposed planned
unit development amendment (PUDA) to
allow a total of 32 single family units
between the planned memory care on
Lot 2, Block 1 of “Cook Lake Highlands”
and the adjacent 19120 County Road 10
property. Additionally, the applicant is
requesting to change the apartment
building from a 100-unit co-op building to
a 145-unit market rate apartment
building.
2.Background
Cook Lake Highlands received
preliminary PUD and preliminary plat approval on August 12, 2021 and final plat and
final PUD approval on March 24, 2022. The development was approved for 19 single
family lots, one daycare lot, one memory care lot with 27 units and one lot for the
Applewood Point senior multifamily building consisting of 100 units.
3. Analysis
Planned Unit Development Amendment
The applicant has submitted a narrative stating the reasoning for the PUD amendment
to the approved PUD and provides details on the products and approach to the
development.
The amended PUD would:
a.Keep the approved daycare facility on Lot 1, Block 1.
Page 2 of 5
b. Change the 19 villa homes in Block 3 to rental units. No change to the lots,
grading or building standards is requested.
c. Change the 100-unit Applewood Point Co-op to a 145-unit apartment building on
Block 2. There is no change to the footprint of the building proposed, but the
units would be modified in the change from a co-op to an apartment.
d. Change the assisted living facility on Lot 2, block 1 to 12 single family rental
units.
e. The development now includes the 3.1-acre parcel to the west (PID
2511923140023). This property would be developed with 19 single family rental
homes. The property is guided and zoned mixed residential which is the same as
the Cook Lake property. City staff has encouraged the Cook Lake developer to
include this property in the development throughout the approval process.
f. The plan includes the addition of HOA maintained recreation space on the south
side of the proposed single family homes south of Brockton Lane. The open
space totals 1.82 acres.
Approved PUD Plan
Proposed PUD Plan
Page 3 of 5
Land Use Density
The Comprehensive Plan notes that the City calculates net density (gross land area -
wetlands and land below the 100-year OHWL) to ensure compliance with the
Comprehensive Plan goals. The proposed pre-development net density is 8.0 units per
acre. The net density is consistent with the 8-10 units per acre that is expected in the
Mixed Residential land use classification. These density calculations are based on the
entire site.
Access and Parking
The single family homes south of Brockton Lane would be accessed with a private
drive. The code requires two parking spaces per unit. The concept plan would meet this
requirement. However, there is community open space with active recreation such as
pickleball courts. The Council should discuss whether guest parking should be provided
for residents using these facilities.
Lot Standards
The single family homes are proposed to be constructed with 32-foot wide lots and 5-
foot side yard setbacks. These are smaller lots than have previously been approved in
Corcoran. For reference, the minimum lot width in Bass Lake Crossing South is 40 feet,
in Bellwether is 44 feet and in Bass Lake Crossing it is 50 feet. The 19 single family lots
approved with the original PUD are 50-foot wide lots with 5-foot side yard setbacks.
Common Open Space
The applicant is intending to rent the units and would create an HOA to provide
maintenance for the units. As part of
the rental community the concept plan
shows open space areas that can be
utilized by residents of the community.
This provides a buffer for the homes
from County Road 10.
The City is considering adoption of a
buffer ordinance. If the ordinance
were adopted as draft the
southwestern parcel would be
required to have an “A” level buffer on
the western boundary of the property.
However, the western boundary of the
property had plantings on a berm
included as part of the construction of
Fir Lane and the plantings provide a
buffer greater than required by the
draft ordinance.
Page 4 of 5
Wetlands
A wetland delineation was completed for the land that was previously platted, but not for
the new parcel being added. It appears that there are no wetlands on site and a
wetland delineation must be completed to confirm.
Stormwater
Stormwater design has not been completed with the concept. An existing stormwater
management plan was developed for the approved PUD. The stormwater management
plan would need to be updated to accommodate the new site plan. This would include
the addition of the southwestern parcel into the stormwater management system. Any
changes in the stormwater management plan may need to be reviewed and approved
by the City of Maple Grove if it impacts the existing stormwater management
agreement.
Rental Housing
The City will be considering adoption of a rental ordinance that would set forth
standards and the approval process for obtaining a rental dwelling license. The goal of
the ordinance is protect the public health, safety, and welfare of residents of Corcoran
who live in rental units by adopting a rental dwelling inspection and maintenance
program that corrects substandard conditions and maintains a standard for existing and
newly constructed rental dwellings in the City. The operation of rental properties is a
business enterprise that includes certain responsibilities. Rental owners, operators, and
managers are responsible to take such reasonable steps as are necessary to ensure
that the citizens who occupy such rental units, as well as neighboring properties, may
pursue the quiet enjoyment of the normal activities of life in surroundings that are safe,
secure, and sanitary, free from noise, nuisances, and annoyances, and free from
unreasonable fears about safety of persons or property.
The draft ordinance limits property owners to a maximum of three rental units in the City
but includes a provision that would allow the Council to grant an exemption. The
exemption language was added to allow exemptions for these types of planned rental
neighborhoods.
Neighborhoods that are planned and designed as rental communities have a
management company that will maintain the structures, amenities and common areas,
which eliminates many of the safety, maintenance and nuisance concerns related to an
investor purchasing multiple homes in a neighborhood. People who live in a rental
neighborhood are making the choice to live there. The applicant has provided a
separate narrative from the Excelsior Group about their communities and their builder,
Robert Thomas Homes. This group is the developer/operator of the Edgewater on Cook
Lake development in Maple Grove directly east of this site. The applicant and
Page 5 of 5
development team have offered tours of the Maple Grove property for interested
Council members.
4. Recommendation
Staff recommends that the City Council review and discuss the sketch plan and provide
the applicant with informal comments.
Any opinions or comments provided to the applicant by the City Council are considered
advisory only and shall not constitute a binding decision on the request.
Attachments
1. Applicant Narrative dated January 31, 2023
2. Concept Plan dated January 31, 2023
3. Edgewater Home Images dated January 31, 2023
4. Public Safety memo dated February 6, 2023
5. Engineer’s memo dated February 16, 2023
January 31, 2023
Cook Lake Highlands
PUD Amendment Narrative City Council Work Session
Trek Development is requesting a discussion with and guidance from City Council regarding a proposed
PUD Amendment for Cook Lake Highlands. The current PUD is approved for 23 lots and 6 outlots
consisting of 19 single family 50’ lots with 5’ and 5’ side setbacks, 1 daycare lot, 1 memory care lot with
27 units, and 1 lot for the Applewood Point senior multifamily building consisting of 100 units.
• The Memory Care buyer canceled our purchase agreement in December 2022. Following the
cancelation, the neighboring Edgewater on Cook Lake development team (The Excelsior Group)
offered to purchase our 19 single family lots with a request to purchase more single family lots,
if possible.
• Our development team redesigned the memory care site with product provided by the single-
family buyer with a focus on our combined desire to create and provide a mix of housing
inventory in this established PUD, mixed residential district. This product change and layout
allows for additional Open/Green/Amenity space on the site.
• While reimaging the memory care site, our development team came to an agreement with the
adjacent landowner (E & R Investments) to purchase the 3 +/- acre parcels and combined them
with our new single family design for the memory care site. We are proposing the same single-
family product on this site be a 32’ lot with 5’ and 5’ side setbacks with additional
open/green/amenity space which will consist of 1.82+/- acres.
• Multi-Family Site Lot 1 Bl.2
o Option 1
Our development team is requesting to change the approved multi-family, 100
unit co-op to a multi-family apartment. The building footprint, height, and the
site plan will remain the same. The units will be a smaller size and the unit count
will change from 100 to 145 units.
o Option 2
The Excelsior Group development team would like to propose approximately
24-26 single family, for rent homes/lots on Lot 1 Bl. 2, currently the multi-family
site.
• This PUD request creates a purpose built, mixed residential, rental community with a
homeowners’ association and an experienced, professional, full time, on-site management and
maintenance team.
• This rental community offers high touch,, service focused, management style that is highly
responsive to resident needs.
• Community events and programming provided by the management team encourage a sense of
community and result in high retention rates.
Sincerely,
Beth Hustad
Trek Real Estate and Development
Cook Lake Highlands – PUD Amendment City Council Work Session
Project Narrative
Corcoran, MN
January 31, 2023
The Excelsior Group, in partnership with Robert Thomas Homes and Whitten Architecture,
proposes to develop a purpose-built single family rental community as part of the Cook Lake
Highlands development.
The project will feature detached single-family homes with open floor plans, high quality finishes
and abundant windows. Each home will include two-car attached garages, patios or decks and
private yards. Home architecture will be consistent with the Edgewater on Cook Lake
development (directly east of the Cook Lake Highlands development) and will thoughtfully
balance color selection and unique elevation features to create a diverse yet cohesive
streetscape.
The homes will be part of a professionally managed, purpose -built single family rental
community. This housing option is becoming increasingly popular with residents because it offers
the community and comforts of homeownership without the burdens of home repair and a long-
term mortgage. The dedicated onsite management and maintenance team professionally
manages community operations including preventative maintenance budgeting for future capital
projects as needed. The management team is also responsible for snow removal, landscaping
maintenance, interior and exterior home maintenance and common area and amenity
maintenance. Homes are designed with mechanical closets accessible through the garage to
allow for regular access by the management team to perform routine maintenance and repairs
without inconveniencing residents. The onsite team is also highly responsive to resident needs
and fosters a sense of community between residents through monthly hosted community events
such as “Yappy Hours” at the dog park or weekend brunches in the clubhouse. This high-touch,
service-focused management style results in high retention rates with more t han 65% of
residents renewing their leases year-over-year on average.
Residents in the proposed Cook Lake Highlands development will enjoy access to the amenities
located at Edgewater on Cook Lake.
• Pool
• Fitness center
• Reservable club room
• Outdoor entertainment area with grills and fireplace
• Onsite management and maintenance offices
The proposed Cook Lake Highlands development will enhance the community amenity offerings
by adding outdoor recreation and gathering spaces.
• Dog park
• Pickle ball court or sport court
• Outdoor seating and gathering space
• Kids play area
Built-to-rent single family housing appeals to a wide range of demographics. While the average
age of residents at built-to-rent communities in Minnesota is about 45 years old, res idents span
professional millennials migrating out of downtown apartments, families going through life
transitions such as a job relocation or divorce, and Boomer households who want the “lock-and-
leave” convenience of a rental, but still want the privacy (and storage!) that a single-family-home
offers. The people living in these homes are renters by choice. In virtually all cases, these
residents can afford to purchase a home but choose to live in a built-to-rent community to take
advantage of the flexibility, professional management, minimal financial commitment, and lack
of maintenance obligations.
The proposed development will offer a diversity of home types ranging in size from 900 SF two-
bedroom homes to 2,800 SF four-bedroom homes. The project will include 22-foot-wide
detached homes with front doors oriented toward (Brockton Lane) and rear garages accessible
via a private drive, and 35-foot-wide one- and two-story homes. Both product types have been
thoughtfully designed to meet the needs of residents, including attached two-car garages, ample
storage space, dedicated private outdoor areas. Inspiration for the 22-foot-wide product type
comes from Robert Thomas Homes’ for-sale product, which proved to be wildly successful at
their Spirit of Brandtjen Farms development in Lakeville; the homes sold at an average price of
$470,000 attracting primarily first-time home buyers, people going through life transition, and
empty nesters. The range in home sizes and types will also ensure the community is able to offer
homes at a variety of price points, making it accessible to a wide range of residents now and in
the future.
The Excelsior Group is Twin Cities-based developer and steward for multifamily properties. We
specialize in creating spaces that connect emotionally with residents and integrate synergistically
with communities. We are a nimble team, driven by creativity and innovation, with more than 20
years of experience in developing, funding and operating class-A multifamily properties that cater
to the “renter-by-choice” resident population.
Sincerely,
Jill Kiener Tom Sawatske, CFA
Vice President of Development Senior Vice President
The Excelsior Group Sotarra, LLC
OH
W
O
HW
LIFT
STATION
LAKE
LOT 1
1.88 AC
LOT 1
4.65 AC
PROPERTY LINE
PROPERTY LINE
LOT 2
2.14 AC30' BLDG. STBK25' BLD
G
.
S
T
B
K
25' PKG
.
S
T
B
K
10' PKG. STBK30' BLDG. STBK50' PKG. STBK
25' BLD
G
.
S
T
B
K
25' PKG
.
S
T
B
K
100' BLDG. STBK
25' BLDG. STBK
WETLAND
BSTR.
PUMP
STATION
O
HW
BLOCK
1
BLOCK
1BLOCK 3MET COUNCIL
PROPERTY
1.22 AC
POND/ FILTRATION
BASIN 1D25' BLDG. STBKCONSTRUCTION
LIMITS
ROW LI
N
E
LOT 1
1.88 AC
LOT 2
2.14 AC LOT LINENEW HORIZON
DAYCARE
BROCKTON LANE
PRIVATE DRIVE
PRIVAT
E
D
R
I
V
E
OPEN SPACE
±0.87 ACRES
POND
OPEN SPACE
±0.95 ACRES
c
1OFCOOK LAKE HIGHLANDS
CORCORAN, MINNESOTA
TREK DEVELOPMENT1-27-2023
JLT
JLT
Name
Reg. No.Date
Revisions Date
Designed
Drawn
2022 Pioneer Engineering, P.A.
Mendota Heights, MN 55120
2422 Enterprise Drive (651) 681-1914
Fax: 681-9488www.pioneereng.com
LANDSCAPE ARCHITECTSLAND SURVEYORSLAND PLANNERSCIVIL ENGINEERS
xx
I hereby certify that this plan was prepared by
me or under my direct supervision and that I
am a duly Licensed Landscape Architect
under the laws of the State of Minnesota 44763
Jennifer L. Thompson 1PUD AMENDMENT CONCEPT 3
SITE DATA:
PROPERTY B:
AREA: ±2.14 ACRES
PROPOSED OPEN SPACE: ±0.87 ACRES
PROPOSED UNITS: 13
BULK STANDARDS:
WIDTH: 32'
FRONT SETBACK: 15'
REAR (GARAGE) SETBACK: 25'
SIDE SETBACK: 5'
DENSITY: ±6.1 UNITS/ACRE
PROPERTY C
AREA: ±3.1 ACRES
PROPOSED OPEN SPACE: ±0.95 ACRES
PROPOSED UNITS: 19
BULK STANDARDS:
WIDTH: 32'
FRONT SETBACK: 15'
REAR (GARAGE) SETBACK: 25'
SIDE SETBACK: 5'
DENSITY: ±6.1 UNITS/ACRE
A
B
C
Concept Elevations
Concept Images -Interior
Concept Unit Plans –35-foot-wide product
Concept Unit Plans -35-foot-wide product
Concept Unit Plans -35-foot-wide product
Concept Unit Plans –22-foot-wide product
Concept Imagery
Page 1 of 1
CITY OF CORCORAN
8200 County Road 116, Corcoran, MN 55340
763.420.2288
E-mail - general@corcoranmn.gov / Web Site – www.corcoranmn.gov
Memo
To: Planning (Planners Lindahl and Davis McKeown)
From: Lieutenant Burns
Date: February 6, 2023
Re: City File 23-005 Cook Lake Highlands
PUD Amendment
A Public Safety plan review meeting was held on February 1, 2023. The following were in attendance:
Lieutenant Ryan Burns, Planner Davis McKeown, Fire Chief Feist, Fire Chief Leuer, Fire Chief
Malewicki, Building Official Geske, and Construction Services Specialist Pritchard. The comments
below are based on the preliminary review of the concept plans received by the City on January 31,
2023 and are intended as initial feedback as further plan review will need to be completed as
construction plans becomes available.
1. Any roadways, private or public, that are longer than 150’ will require a fire apparatus turn
around.
2. Recommend that no parking signs are posted on private roads.
3. There does not appear to be any guest parking options. The driveways will need to
accommodate guest parking and/or additional guest spaces should be provided without
relying on on-street parking.
4. Fire hydrants will need to be provided on Brockton Ln and on the private drives.
Memo
To: Kevin Mattson, City of Corcoran From: Kent Torve, City Engineer
Steve Hegland, PE
Project: Cook Lake Highlands PUD Amendment Date: February 16th, 2023
Exhibits:
This Memorandum is based on a review of the following documents:
1. Cook Lake Highlands PUD Amendment Concept 3, Dated January 31, 2023
Comments:
General:
1. An encroachment agreement shall be required for all site improvements or items placed within the
City ROW or easements.
Plat:
1. The proposed changes will require public utilities under the private roadways. Easements shall be
provided to provide access to all utilities and public infrastructure.
2. Easements shall be provided over and to all stormwater infrastructure.
Erosion Control/SWPPP
1. Existing SWPPP for the site would need to be amended to accommodate changes.
Transportation
1. All roadways shall match City standard details. Private roads shall at a minimum be constructed to
the city standard section.
2. Turnarounds meeting City standards are required at the end of dead-end streets to facilitate
emergency vehicle movements
3. Any parking areas shall have concrete curbing and a paved surface.
4. ROW dedication is anticipated to be consistent with adjacent developments but shall be reviewed by
Hennepin County.
5. It is recommended that parking is made available to park amenities.
6. Sidewalk and trail locations through concept areas would need to be further reviewed to ensure it
doesn’t conflict with public or private utilities.
7. The western access to the apartment complex and eastern access to the private streets in Area B
should be aligned.
February 16, 2023
Cook Lake Highlands PUD Amendment
Kevin Mattson
Page 2 of 2
Site Plans
1. The existing and proposed drainage and utility easements shown shall be clearly labeled on all plan
drawings.
2. Street lighting locations shall be reviewed by public safety and final lighting locations shall be
determined at the time of final plat.
Grading /Stormwater
1. An existing stormwater management plan was developed for the approved PUD. The stormwater
management plan would need to be updated to accommodate new site plan. This would include the
addition of the southwestern parcel into the stormwater management system.
2. Any changes in the stormwater management plan may need to be reviewed by the City of Maple
Grove if it impacts the existing stormwater management agreement.
3. Wetland delineations were not previously completed on the southwester parcel and wetlands may
exist in this area. If present, they may impact or limit the use of the open space depending on final
delineation.
4. If wetlands are impacted, they shall be reviewed and approved through the appropriate WCA
permitting process. At the time of preliminary plat, the wetland buffers should be identified as either
newly established wetland buffers or whether they are existing buffers as defined by City Code.
Watermain/Sanitary Sewer
1. Sanitary and water are available adjacent to the concept areas.
2. For Areas B and C, it is assumed sewer and water will be extended down the private street to service
the proposed homes.
3. Watermain looping would be reviewed at time of utility plan development.
4. Plan and profiles for all utilities shall be provided at the time of final plat submittals.
End of Comments