RESOLUTION NO. 2022-53
Motion By: Schultz
Seconded By: Vehrenkcol mp
May 7 2, 2022
APPROVING FINAL PLAT AND DEVELOPMENT CONTRACT FOR "BECHTOLD FARMS AT
RUSH CREEK" AT 10165 BECHTOLD ROAD
(PIDS 05=119-23-44-0001 AND 08-119-23-11-0007) (CITY FILE NO. 22-024)
WHEREAS, Skies Limit, LLC (the "applicant") has requested approval of a preliminary plat to
create 12 lots from two existing parcels legally described as:
See Attachment A
NOW, THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF
CORCORAN, MINNESOTA, that it should and hereby does approve the request for final plat,
subject to the following conditions.
1. A final plat is approved to create 12 lots for "Bechtold Farms at Rush Creek" in accordance
with the plans and application received on February 15, 2022, March 22, 2022, March 24,
2022, March 29, 2022, March 30, 2022, April 7, 2022, April 8, 2022, April 13, 2022, April
147 2022, and April 21, 2022, except as amended by this resolution.
2. The development contract must be executed by the developer and the City must be filed
with the final plat.
3. Approval is subject to the preliminary approval conditions (Resolution 2021-129).
4. Approval of the preliminary plat is contingent upon approval of the requested easement
vacation (Resolution 2022-54).
5. The applicant shall comply with all requirements of the City Engineer's memo dated April
29, 2022.
6. The applicant shall comply with all requirements of the Elm Creek Watershed
Management Commission review dated April 21, 2022.
7. Lots 3, 4, 5, 6, and 7, Block 1 are within the Shoreland Overlay District are limited to a
maximum impervious surface coverage limit of n of the lot within the
Shoreland Overlay.
25% for the portio
FURTHER, prior to release of the final plat for recording:
8. Plans shall be revised to provide wetland buffer monuments at each lot line where it
crosses a wetland buffer, and where needed to indicate the contour of the buffer, with a
maximum spacing of 200 ft. along the wetland edge. A wetland buffer monument exhibit
dated May 2, 2022, delineates the correct locations for conservation and wetland buffer
monuments.
9. Plans shall be revised to show the proposed house pad and driveway location for Lot 1,
Block 1.
Page 1 of 4
be
given for the 0.61 net acres of newly dedicated trail
City of Corcoran
County of Hennepin
State of Minnesota
RESOLUTION No. 2022-53
May 7 2, 2022
10. The applicant shall provide details regarding the removal of the existing driveway in Lot 1,
Block 1 and preservation of the drainage ditch along Bechtold Road for review and
approval by the City Engineer. The driveway for Lot 1, Block 1 shall be from Chaparral
Lane to the south, unless as part of the building permit application the City determines the
relocation is infeasible.
11. Park dedication shall be satisfied by a combination of dedicated trail easements and cash -
in -lieu of land for the 11 newly created lots.
a. A 20 ft. wide trail easement connecting
easement along the west property line shall
Chaparral Lane to the existing trail
be deeded to the City.
b. A 30 ft. wide trail easement along the north edge of the north fork of Rush Creek
shall be deeded to the Cit
c. Park dedication credit will
easement.
d. Cash -in -lieu of land shall be $42,559.09.
12. The following documents must be approved by the City Attorney:
a. Stormwater Maintenance Agreement
b. Development Contract
c. Trail Easements
d. Conservation Easement
e. Easement Vacation Resolution
f. Encroachment Agreement for the Lot 10, Block 1 Driveway in Garden Lane.
g. Homeowners Association documents
h. Wetland Buffer Planting and Maintenance Plan
13. Letter of credit must be in place and fees paid.
FURTHER, that the following conditions must be met prior to issuance of building permits:
14. The applicant must file the final plat at Hennepin County within 2 years of the date of
approval or the approval shall expire.
15. The following documents must be a recorded at Hennepin County and proof of recording
provided to the City:
a. Stormwater Maintenance Agreement
b. Development Contract
c. Trail Easements
d. Conservation Easement
e. Easement Vacation Resolution
f. Encroachment Agreement for the Lot 10, Block 1 Driveway in Garden Lane.
g. Homeowners Association documents
h. Wetland Buffer Planting and Maintenance Plan
16. Lot and corner monuments shall be installed as required by the Subdivision Ordinance. A
financial guarantee shall be required to ensure installations per City requirements.
Page 2 of 4
City of Corcoran
County of Hennepin
State of Minnesota
RESOLUTION NO. 2022-53
May 12, 2022
17. Wetland buffer monument signs must be installed as required by Section 1050.010 of the
Zoning Ordinance.
18. A final wetland buffer plan must be submitted by the developer and approved by the City
a. Where it is believed existing vegetation meets the requirements for the buffer, the
developer should schedule and inspection from City wetland LGU staff to verify
where existing vegetation is acceptable.
19. The wetland buffer plantings must be installed where required.
20. Septic permits must be obtained from Hennepin County.
21. Each lot must show one overstory tree to be planted on the lot.
FURTHER, that the following conditions must be met prior to release of remaining escrow:
22. Any request for the City to inspect the required landscaping in order to reduce financial
guarantees must be accompanied by recertification/verification of field inspection by the
project Landscape Architect. A letter signed by the project Landscape Architect verifying
plantings (including wetland and pond buffers) have been correctly installed in compliance
with the plans and specifications will suffice.
23. The applicant must file the final
approval or the approval shall
® McKee, Tom
® Bottema, Jon
® Nichols, Jeremy
® Schultz, Alan
® Vehrenkamp, Dean
plat at
expire.
Hennepin County within 2 years of the date of
❑ McKee, Tom
❑ Bottema, Jon
❑ Nichols, Jeremy
❑ SchultzAl
,an
❑ Vehrenkamp, Dean
Whereupon, said Resolution is hereby declared adopted on this 12t" day of May, 2022.
ATTEST:
Jessica Beise —City Administrator
4
Tom McKee
Page 3 of 4
ayor
CI tJ/ Seal
City of Corcoran
County of Hennepin
State of Minnesota
May 7 21 2022
RESOLUTION NO. 2022-53
ATTACHMENT A
Outlot A, BECHTOLD FAMILY ACRES
AND
The South Half of the Southeast Quarter of Section 5, Township 119, Range 23a
Page 4 of 4