Loading...
HomeMy WebLinkAboutResolution 2022-39 Final PUD Pulte Homes Amberley 2nd AdditionCity of Corcoran County of Hennepin State of Minnesota RESOLUTION NO. 2022-39 Motion By: Bottema Seconded By: Nichols April 281 2022 APPROVING FINAL PLANNED UNIT DEVELOPMENT (PUD) FOR "AMBERLY 2ND ADDTION' FOR PULTE HOMES OF MINNESOTA LLC (PID 01-119-23-34-0002) (CITY FILE NO. 22-008) WHEREAS, Pulte Homes of Minnesota, LLC (the "applicant") has requested approval of a final planned unit development (PUD) plan for Amberly 2nd Addition for 51 new single family lots on the property legal described as: Outlot C, Bellwether 6th Addition WHEREAS, the Planning Commission has reviewed the plan at a public meeting and recommends approval, and; NOW, THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF CORCORAN, MINNESOTA, that it should and hereby does approve the request for a final PUD plan, subject to the following conditions: 1. A final PUD plan is approved to create 51 single family lots for "Amberly 2nd Addition", in accordance with the plans and application received on January 25, 2022, February 16, 2022, and March 3, 2022, except as amended by this resolution. 2. Approval is subject to the preliminary approvals (Resolutions 2021-81 and 2021-82) 3. Approval is contingent upon City Council approval of the final plat (Resolution 2022-40) 4. The applicant shall comply with all requirements of the City Engineer's memo dated March 91 2022. 5. Park dedication will be satisfied through a combination of land, pavement of trails, and cash in lieu of land for this property, which was not part of the original Bellwether (Encore) subdivision, subject to the following conditions: a. The City will accept the net area of park land and trail easements for this development. b. For Amberly 2nd Addition, park dedication shall be the 0.84 net acres of off -road trail easement and 1.65 acres of park land credit from the excess Amberly 1 St Addition and Bellwether 61" Addition parkland dedication. The approximately 0.67 acres of remaining credited park dedication from the Amberly 1st, Bellwether 61n and Amberly 2nd Additions will be applied to future phases. c. The applicant shall provide correct density calculations for final park dedication calculations. Pre -development net density is the gross area minus existing streets, wetlands and land below the 100 year OHW. 6. All utility facilities shall be located underground. 7. The HOA shall be responsible for the maintenance of all signs and common areas, including lighting and landscaping in those areas. Page 1 of 4 City of Corcoran County of Hennepin State of Minnesota RESOLUTION NO. 2022-39 April 28, 2022 8. Parking shall be permitted on one side of the local streets and shall be signed in accordance with City standards. 9. Lighting shall comply with requirements of Section 1060.040 of the Zoning Ordinance and generally be placed on the sidewalk side of the street. a. The applicant shall work with City staff to finalize the streetlight locations. b. The applicant shall revise the location of streetlights at the intersections of 1041n Place and Northwood Lane and 105t" Place and Northwood Lane as noted in the City Engineer's memo. 10. Barricades and signage indication future street extensions shall be installed consistent An Section 945010Subd19 of the Subdivision Ordinance ., . . 11. No development signage is proposed or approved for this phase. Any development signage requires a sign permit and must comply with the standards in Section 84 of the City Code. 12. Lawn sprinklers/irrigation systems shall all have rain sensors to limit unnecessary watering. 13. Decks are required to meet all structure setbacks, except that Section 1050.01 requires a 15 Ti. structure setback from the wetland buffer, but allows patios and decks to encroach a maximum of 6 ft. into this structure setback. 14. PUD Flexibility is granted to establish the following lot standards for this development: Single Family Detached Minimum lot area 93156 s . ft. Minimum lot width 65 feet Minimum Principal Structure Setbacks. Front, Front, From From Ma'or Roadways* all other streets 100 25 feet feet Front Porch (<_ 120 sq. ft.) 15 feet Side living 7.5 feet Side garage ** 7.5 feet Rear 30 feet Maximum Principal Building Height 35 feet Minimum Driveway depth 22 feet FURTHER, the following items must be addressed prior to issuance of building permits: 15. Mechanical equipment (including air conditioning units) must be located in the side or rear yard and shown on plans. 16. Amberly homes shall comply with garage standards. Page 2 of 4 City of Corcoran County of Hennepin State of Minnesota RESOLUTION NO. 2022-39 April 28, 2022 17. All permanent wetland buffer monument signs must be erected along the wetland buffer line as required by Section 1050.010, Subd. 7 of the Zoning Ordinance. a. Wetland signs shall be purchased from the City. b. The final locations must be inspected and approved by City staff. c. Monument signs shall be installed prior to approval of building permit. 18. The plans must show centralized mailbox locations. These mailbox locations shall be approved by the US Postal Service and proof of the approved locations shall be provided to the City. 19. PUD flexibility is provided from the standard that requires architectural upgrades to all four sides of the building, based on the following conditions: a. The applicant shall provide equal architecture treatment on elevations of a home that face a public right-of-way or park at the locations shown in the exhibit titled "Architectural Design Flexibility Requested" (in the staff report). The applicant will be allowed flexibility for the material on those areas identified for "upgraded trim only". For example, if three sides of a home face a public right-of-way or park, then equal architectural treatment shall be provided on those three sides of the building. Lots subject to this standard include: i. Lots 1.9, Block 1 shall provide upgraded trim on the rear fagade facing Stieg Road. ii. Lots 7 and 8, Block 2, Lots 1 and 4, Block 5, Lot 6, Block 3 and Lot 103 Block 4 shall provide equal architectural treatment on the facades facing each public right-of-way. 20. Any request for the City to inspect the required landscaping in order to reduce financial guarantees must be accompanied by recertification/verification of field inspection by the project Landscape Architect. A letter signed by the project Landscape Architect verifying plantings (including wetland and pond buffers) have been Corr compliance with the plans and specifications will suffice. correctly installed in Page 3 of 4 City of Corcoran County of Hennepin State of Minnesota RESOLUTION NO. 2022-39 VOTING AYE ❑ McKee, Tom ❑ Bottema, J o n ❑ Nichols, Jeremy ® Schultz, Alan ® Vehrenkamp, Dean April 28, 2022 VOTING NAY U McKee, Will ❑ Bottema, Jon ❑ Nichols, Jeremy ❑ Schultz, Alan ❑ Vehrenkamp, Dean Whereupon, said Resolution is hereby declared adopted on this 28th day�April, 2022. ATTEST: Je;�sica Beise ity Administrator Jon Bottema —Acting Mayor City Seal Page4of4